| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$225,000.00 |
$180,000.00 |
$75,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 113,440 | CY |
$7.00 |
$5.95 |
$12.25 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 7,700 | CY |
$12.00 |
$7.50 |
$12.25 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$225,000.00 |
$110,000.00 |
$75,000.00 |
| 5 | 210 0121 |
OBLITERATING ABANDONED ROAD | 4,598 | LF |
$10.00 |
$13.20 |
$5.00 |
| 6 | 221(C) 2801 |
TEMPORARY SILT FENCE | 19,000 | LF |
$1.50 |
$2.00 |
$1.99 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 4,760 | LF |
$7.00 |
$10.00 |
$9.00 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 291,999 | SY |
$1.00 |
$3.10 |
$3.65 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 74.53 | AC |
$255.00 |
$1,250.00 |
$12.50 |
| 10 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 13,104 | CY |
$50.00 |
$64.00 |
$57.50 |
| 11 | 310(B) 0149 |
SUBGRADE, METHOD B | 23,780 | SY |
$1.50 |
$2.50 |
$4.55 |
| 12 | 325 5271 |
SEPARATOR FABRIC | 70,309 | SY |
$1.25 |
$2.95 |
$1.12 |
| 13 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 8,589 | TON |
$22.00 |
$29.50 |
$27.75 |
| 14 | 407(B) 0250 |
TACK COAT | 10,180 | GAL |
$2.00 |
$1.30 |
$2.60 |
| 15 | 408 5774 |
PRIME COAT | 49,313 | GAL |
$2.55 |
$2.29 |
$0.2600 |
| 16 | 409(A) 4242 |
FABRIC REINFORCEMENT | 10,942 | SY |
$2.70 |
$2.65 |
$1.65 |
| 17 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 20,288 | TON |
$78.00 |
$77.23 |
$78.00 |
| 18 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 10,426 | TON |
$85.00 |
$77.89 |
$80.15 |
| 19 | 411(H) 6210 |
SUPERPAVE, TYPE S3(PATCH)(PG64-22OK) | 670 | TON |
$110.00 |
$167.85 |
$350.00 |
| 20 | 412 5267 |
COLD MILLING PAVEMENT | 7,895 | SY |
$3.00 |
$5.45 |
$6.01 |
| 21 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 171 | CY |
$25.00 |
$20.00 |
$25.00 |
| 22 | 509(A) 0319 |
CLASS AA CONCRETE | 479 | CY |
$450.00 |
$525.00 |
$625.00 |
| 23 | 509(D) 0325 |
CLASS C CONCRETE | 50 | CY |
$350.00 |
$350.00 |
$350.00 |
| 24 | 511(A) 0332 |
REINFORCING STEEL | 74,614 | LB |
$1.10 |
$1.25 |
$1.25 |
| 25 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 3,899 | TON |
$45.00 |
$37.50 |
$33.00 |
| 26 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 1,961 | TON |
$40.00 |
$26.00 |
$33.00 |
| 27 | 609(B) 1525 |
2'-8" COMB. CURB & GUTTER (6" BARRIER) | 334 | LF |
$30.00 |
$40.00 |
$27.66 |
| 28 | 610(B) 5016 |
8" CONCRETE DRIVEWAY | 982 | SY |
$65.00 |
$50.00 |
$75.00 |
| 29 | 611(G) 6000 |
INLET (SMD-TYPE 1) | 1 | EA |
$4,000.00 |
$3,500.00 |
$4,250.00 |
| 30 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 186 | LF |
$85.00 |
$68.20 |
$69.00 |
| 31 | 613(A) 0495 |
42" R.C.PIPE CLASS III | 136 | LF |
$125.00 |
$174.20 |
$165.00 |
| 32 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 122 | LF |
$100.00 |
$130.00 |
$124.65 |
| 33 | 613(D) 0784 |
42" CORR. ALUMINUM PIPE | 67 | LF |
$65.00 |
$100.00 |
$133.00 |
| 34 | 613(EE) 5610 |
(SP) 18" CORRUGATED POLYPROPYLENE PIPE | 1,530 | LF |
$60.00 |
$37.50 |
$38.65 |
| 35 | 613(EE) 5620 |
(SP) 24" CORRUGATED POLYPROPYLENE PIPE | 1,503 | LF |
$75.00 |
$50.00 |
$48.65 |
| 36 | 613(EE) 5630 |
(SP) 30" CORRUGATED POLYPROPYLENE PIPE | 229 | LF |
$85.00 |
$78.00 |
$68.65 |
| 37 | 613(EE) 5640 |
(SP) 36" CORRUGATED POLYPROPYLENE PIPE | 200 | LF |
$95.00 |
$98.45 |
$98.65 |
| 38 | 613(EE) 5650 |
(SP) 42" CORRUGATED POLYPROPYLENE PIPE | 421 | LF |
$105.00 |
$120.00 |
$138.65 |
| 39 | 613(EE) 5670 |
(SP) 54" CORRUGATED POLYPROPYLENE PIPE | 68 | LF |
$130.00 |
$140.00 |
$178.65 |
| 40 | 613(L) 5740 |
54" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$3,000.00 |
$1,600.00 |
$2,750.00 |
| 41 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 41 | EA |
$1,000.00 |
$1,560.00 |
$1,250.00 |
| 42 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 48 | EA |
$1,300.00 |
$1,800.00 |
$1,500.00 |
| 43 | 613(M) 7188 |
TYPE C4 CULVERT END TREATMENT | 6 | EA |
$1,600.00 |
$2,125.00 |
$1,750.00 |
| 44 | 613(M) 7189 |
TYPE D4 CULVERT END TREATMENT | 8 | EA |
$1,800.00 |
$2,560.00 |
$2,250.00 |
| 45 | 613(M) 7194 |
TYPE DD4 CULVERT END TREATMENT | 6 | EA |
$2,700.00 |
$3,000.00 |
$3,000.00 |
| 46 | 613(T) 1187 |
STANDARD BEDDING MATERIAL, CLASS C | 1,119 | CY |
$55.00 |
$28.00 |
$52.00 |
| 47 | 613(V) 1180 |
TRENCH EXCAVATION | 1,183 | CY |
$13.00 |
$8.00 |
$25.00 |
| 48 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$40,000.00 |
$42,000.00 |
$27,500.00 |
| 49 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 36,277 | SY |
$4.00 |
$3.00 |
$2.65 |
| 50 | 619(B) 4767 |
REMOVAL OF ASPHALT DRIVEWAY | 1,163 | SY |
$8.00 |
$4.25 |
$10.00 |
| 51 | 619(C) 0924 |
SAWING PAVEMENT | 24,436 | LF |
$3.50 |
$1.35 |
$2.02 |
| 52 | 624(A) 4281 |
FENCE-STYLE WWF | 992 | LF |
$9.00 |
$6.00 |
$12.00 |
| 53 | 624(B) 4466 |
GATES-STYLE WWF (4.5'HIGH X 16'LONG) | 1 | EA |
$1,600.00 |
$1,360.00 |
$750.00 |
| 54 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 26,716 | LF |
$4.50 |
$5.60 |
$6.00 |
| 55 | 624(C) 7181 |
FENCE-STYLE SWF (6 BARBED WIRE) | 2,763 | LF |
$5.00 |
$6.00 |
$7.25 |
| 56 | 624(D) 4470 |
GATE, GALVANIZED STEEL | 20 | EA |
$1,000.00 |
$850.00 |
$750.00 |
| 57 | 624(E) 4288 |
FENCE-STYLE CLF (4'HIGH, CLASS A) | 210 | LF |
$20.00 |
$18.50 |
$35.00 |
| 58 | 624(E) 4290 |
FENCE-STYLE CLF (5'HIGH, CLASS A) | 96 | LF |
$25.00 |
$20.00 |
$40.00 |
| 59 | 624(F) 5896 |
GATES-STYLE CLF (5'HIGH X 14'LONG) | 1 | EA |
$800.00 |
$1,800.00 |
$1,500.00 |
| 60 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 23 | EA |
$95.00 |
$110.00 |
$125.00 |
| 61 | 629(B) 4959 |
MAILBOX INSTALLATION-MULTIPLE | 7 | EA |
$185.00 |
$275.00 |
$275.00 |
| 62 | 629(C) 4960 |
MAILBOX | 41 | EA |
$46.00 |
$50.00 |
$60.00 |
| 63 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 29 | EA |
$55.00 |
$25.00 |
$35.00 |
| 64 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 100 | CY |
$32.00 |
$22.00 |
$25.00 |
| 65 | 501(G) 6309 |
CLSM BACKFILL | 70 | CY |
$165.00 |
$150.00 |
$155.00 |
| 66 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 269 | LF |
$260.00 |
$395.00 |
$265.00 |
| 67 | 504(A) 1304 |
APPROACH SLAB | 115 | SY |
$200.00 |
$290.00 |
$189.00 |
| 68 | 504(B) 1305 |
SAW-CUT GROOVING | 310 | SY |
$7.00 |
$12.50 |
$12.33 |
| 69 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 245 | LF |
$90.00 |
$140.00 |
$95.00 |
| 70 | 506(A) 1322 |
STRUCTURAL STEEL | 100 | LB |
$5.00 |
$5.45 |
$5.00 |
| 71 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 6 | EA |
$700.00 |
$425.50 |
$1,750.00 |
| 72 | 509(A) 1326 |
CLASS AA CONCRETE | 94 | CY |
$850.00 |
$725.10 |
$750.00 |
| 73 | 509(B) 1328 |
CLASS A CONCRETE | 42 | CY |
$800.00 |
$722.00 |
$750.00 |
| 74 | 511(A) 1332 |
REINFORCING STEEL | 23,730 | LB |
$1.10 |
$1.50 |
$1.88 |
| 75 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 238 | LF |
$35.00 |
$52.00 |
$42.00 |
| 76 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 238 | LF |
$17.00 |
$12.00 |
$12.00 |
| 77 | 514(K) 6260 |
(PL)PILOT HOLES | 56 | LF |
$180.00 |
$207.00 |
$999.00 |
| 78 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
| 79 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 2,172 | TON |
$45.00 |
$45.00 |
$38.50 |
| 80 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 319 | TON |
$40.00 |
$40.00 |
$38.50 |
| 81 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 52 | LF |
$30.00 |
$23.50 |
$25.00 |
| 82 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 50 | LF |
$27.00 |
$23.50 |
$25.00 |
| 83 | 104 0955 |
(SP) RAILROAD FLAGGING(NON-BIDDABLE) | 30 | DAY |
$600.00 |
$600.00 |
$600.00 |
| 84 | 623 0100 |
(PL)GUARDRAIL CURBING | 1 | EA |
$1,300.00 |
$1,500.00 |
$1,875.00 |
| 85 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 150 | LF |
$19.00 |
$20.00 |
$23.75 |
| 86 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,650.00 |
$1,200.00 |
$1,975.00 |
| 87 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 6 | EA |
$2,400.00 |
$2,500.00 |
$2,995.00 |
| 88 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 19 | EA |
$60.00 |
$50.00 |
$125.00 |
| 89 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 95.04 | SF |
$21.00 |
$20.00 |
$25.00 |
| 90 | 851(C) 8324 |
2" SQUARE TUBE POST | 242 | LF |
$9.00 |
$10.00 |
$15.00 |
| 91 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 116,812 | LF |
$0.3000 |
$0.3800 |
$0.4500 |
| 92 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 22 | LF |
$8.00 |
$10.00 |
$12.50 |
| 93 | 856(B) 8870 |
TRAFFIC STRIPE(MULTI-POLY.)(SYMBOLS) | 2 | EA |
$225.00 |
$850.00 |
$1,000.00 |
| 94 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$100,000.00 |
$40,000.00 |
$98,564.00 |
| 95 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$85,000.00 |
$75,000.00 |
$72,500.00 |
| 96 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$15,000.00 |
$18,000.00 |
$7,250.00 |
| 97 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$410,000.00 |
$380,000.00 |
$340,000.00 |