| 1 | 202(D) 0184 |
UNCLASSIFIED BORROW | 6,138.82 | CY |
$12.00 |
$14.50 |
| 2 | 221(C) 2801 |
TEMPORARY SILT FENCE | 500 | LF |
$2.23 |
$5.89 |
| 3 | 221(F) 0100 |
TEMPORARY SILT DIKE | 49 | LF |
$10.34 |
$38.89 |
| 4 | 230(A) 2806 |
SOLID SLAB SODDING | 47,500 | SY |
$2.00 |
$5.89 |
| 5 | 233(A) 2817 |
VEGETATIVE MULCHING | 9.8 | AC |
$264.70 |
$4,495.00 |
| 6 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 31,343.56 | SY |
$8.50 |
$7.50 |
| 7 | 311(D) 0154 |
PROCESSING EXISTING BASE & SURFACE, METHOD D | 10,792.76 | LF |
$12.00 |
$9.00 |
| 8 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 85.47 | TON |
$54.97 |
$70.00 |
| 9 | 407(B) 0250 |
TACK COAT | 1,394.87 | GAL |
$3.51 |
$2.50 |
| 10 | 408 5774 |
PRIME COAT | 11,030.82 | GAL |
$4.44 |
$3.35 |
| 11 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 6,262.45 | TON |
$95.00 |
$112.50 |
| 12 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 3,131.23 | TON |
$105.00 |
$125.00 |
| 13 | 413(B) 4862 |
RUMBLE STRIP-METHOD HMA-CYC GROUP | 3 | EAGP |
$715.50 |
$1,250.00 |
| 14 | 509(B) 0321 |
CLASS A CONCRETE | 14.88 | CY |
$722.60 |
$1,150.00 |
| 15 | 509(C) 0322 |
CLASS A CONCRETE, SMALL STRUCTURES | 1.49 | CY |
$1,474.87 |
$865.00 |
| 16 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$370.60 |
$415.00 |
| 17 | 511(A) 0332 |
REINFORCING STEEL | 357 | LB |
$1.61 |
$3.50 |
| 18 | 611(L) 0487 |
JUNCTION BOXES | 21.95 | CF |
$120.33 |
$235.00 |
| 19 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 176 | LF |
$96.38 |
$130.00 |
| 20 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 60 | LF |
$56.00 |
$62.00 |
| 21 | 613(EE) 5610 |
(SP) 18" CORRUGATED POLYPROPYLENE PIPE | 100 | LF |
$38.67 |
$52.00 |
| 22 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$2,000.00 |
$2,500.00 |
| 23 | 619(C) 0924 |
SAWING PAVEMENT | 150 | LF |
$3.80 |
$3.00 |
| 24 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 39.97 | SF |
$41.00 |
$25.00 |
| 25 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 8,333 | LF |
$0.9900 |
$1.00 |
| 26 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$15,000.00 |
$15,000.00 |
| 27 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$35,000.00 |
$14,900.00 |
| 28 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,200.00 |
$8,500.00 |
| 29 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$105,000.00 |
$130,000.00 |