| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$4,500.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 2,631 | CY |
$10.00 |
$10.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 9,520 | CY |
$10.00 |
$12.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 18,658 | LF |
$1.20 |
$4.98 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 816 | LF |
$8.00 |
$29.14 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 22,159 | SY |
$3.00 |
$7.00 |
| 7 | 233(A) 2817 |
VEGETATIVE MULCHING | 9.16 | AC |
$5,000.00 |
$3,975.00 |
| 8 | 307(K) 4300 |
STABILIZED SUBGRADE | 56,141 | SY |
$6.25 |
$6.75 |
| 9 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 2,008 | TON |
$50.00 |
$68.00 |
| 10 | 407(B) 0250 |
TACK COAT | 6,799 | GAL |
$2.56 |
$2.50 |
| 11 | 408 5774 |
PRIME COAT | 19,652 | GAL |
$5.00 |
$3.50 |
| 12 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 10,237 | TON |
$90.00 |
$91.00 |
| 13 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 5,041 | TON |
$95.00 |
$102.00 |
| 14 | 412 5267 |
COLD MILLING PAVEMENT | 46,904 | SY |
$2.50 |
$2.50 |
| 15 | 509(B) 0321 |
CLASS A CONCRETE | 32 | CY |
$700.00 |
$1,430.00 |
| 16 | 509(D) 0325 |
CLASS C CONCRETE | 20 | CY |
$450.00 |
$450.00 |
| 17 | 511(A) 0332 |
REINFORCING STEEL | 1,038 | LB |
$1.50 |
$1.55 |
| 18 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 100 | LF |
$115.00 |
$145.00 |
| 19 | 613(A) 4499 |
51" X 31" R.C.PIPE ARCH CLASS A-III | 200 | LF |
$200.00 |
$350.00 |
| 20 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 144 | LF |
$35.00 |
$55.00 |
| 21 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$8,500.00 |
| 22 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 4 | EA |
$150.00 |
$100.00 |
| 23 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 54.86 | SF |
$50.00 |
$25.00 |
| 24 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 6,368 | LF |
$0.5000 |
$1.00 |
| 25 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 24 | LF |
$3.00 |
$6.00 |
| 26 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$8,500.00 |
| 27 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$18,500.00 |
$24,000.00 |
| 28 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$8,500.00 |
| 29 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$150,000.00 |
$175,000.00 |