| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$69,000.00 |
$28,565.00 |
$35,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 50,827 | CY |
$8.00 |
$9.00 |
$8.20 |
$10.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 5,328 | CY |
$10.00 |
$11.85 |
$24.90 |
$15.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$60,000.00 |
$98,400.00 |
$115,920.00 |
$135,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 900 | LF |
$3.50 |
$3.25 |
$4.35 |
$3.50 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 1,386 | LF |
$7.00 |
$20.75 |
$18.50 |
$20.00 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 132,967 | SY |
$1.20 |
$3.35 |
$3.00 |
$2.45 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 28 | AC |
$500.00 |
$5,125.00 |
$1,309.00 |
$2,900.00 |
| 9 | 241 2832 |
MOWING | 56 | AC |
$80.00 |
$435.00 |
$109.00 |
$150.00 |
| 10 | 307(K) 4300 |
STABILIZED SUBGRADE | 94,322 | SY |
$2.00 |
$6.35 |
$7.30 |
$3.50 |
| 11 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,080 | TON |
$26.00 |
$42.50 |
$76.70 |
$45.00 |
| 12 | 407(B) 0250 |
TACK COAT | 24,489 | GAL |
$3.50 |
$3.40 |
$3.25 |
$3.00 |
| 13 | 408 5774 |
PRIME COAT | 31,758 | GAL |
$5.00 |
$3.40 |
$7.45 |
$2.75 |
| 14 | 409(A) 4242 |
FABRIC REINFORCEMENT | 15,848 | SY |
$1.50 |
$1.65 |
$3.40 |
$2.00 |
| 15 | 409(B) 4268 |
BITUMINOUS BINDER | 3,170 | GAL |
$4.00 |
$3.10 |
$8.45 |
$6.00 |
| 16 | 411(B) 5935 |
SUPERPAVE, TYPE S3(PG 76-28 OK) | 16,531 | TON |
$84.00 |
$83.50 |
$87.70 |
$103.00 |
| 17 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 34,394 | TON |
$75.00 |
$75.24 |
$85.20 |
$97.00 |
| 18 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 11,595 | TON |
$89.00 |
$91.20 |
$91.50 |
$105.00 |
| 19 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 3,315 | TON |
$85.00 |
$93.50 |
$105.50 |
$98.00 |
| 20 | 411(D) 5975 |
SUPERPAVE, TYPE S5(PG 64-22 OK) | 2,330 | TON |
$87.00 |
$98.50 |
$97.50 |
$107.00 |
| 21 | 412 5267 |
COLD MILLING PAVEMENT | 41,590 | SY |
$2.10 |
$4.00 |
$2.15 |
$2.25 |
| 22 | 509(A) 0319 |
CLASS AA CONCRETE | 378 | CY |
$500.00 |
$635.00 |
$759.00 |
$740.00 |
| 23 | 509(D) 0325 |
CLASS C CONCRETE | 40 | CY |
$250.00 |
$303.00 |
$336.50 |
$450.00 |
| 24 | 510(C) 6134 |
SLOPE WALL (4") | 761 | SY |
$65.00 |
$80.00 |
$94.70 |
$45.00 |
| 25 | 511(A) 0332 |
REINFORCING STEEL | 45,506 | LB |
$1.05 |
$1.35 |
$1.55 |
$1.00 |
| 26 | 609(B) 0383 |
COMBINED CURB & GUTTER (6" BARRIER) | 42 | LF |
$30.00 |
$56.35 |
$51.30 |
$175.00 |
| 27 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 431 | SY |
$60.00 |
$74.15 |
$82.10 |
$75.00 |
| 28 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 48 | LF |
$65.00 |
$88.90 |
$69.00 |
$90.00 |
| 29 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 2,712 | LF |
$35.00 |
$35.75 |
$44.90 |
$70.00 |
| 30 | 613(B) 0693 |
42" CORR. GALV. STEEL PIPE | 132 | LF |
$60.00 |
$61.70 |
$58.10 |
$95.00 |
| 31 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 280 | LF |
$47.00 |
$34.45 |
$64.10 |
$64.00 |
| 32 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 116 | EA |
$1,200.00 |
$1,285.00 |
$1,426.00 |
$1,100.00 |
| 33 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$23,000.00 |
$43,260.00 |
$63,320.00 |
$35,000.00 |
| 34 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 26,248 | SY |
$3.80 |
$5.20 |
$7.35 |
$4.50 |
| 35 | 619(B) 4766 |
REMOVAL OF CONCRETE DRIVEWAY | 306 | SY |
$5.00 |
$15.45 |
$16.30 |
$30.00 |
| 36 | 619(B) 4767 |
REMOVAL OF ASPHALT DRIVEWAY | 6,132 | SY |
$3.50 |
$10.30 |
$18.40 |
$11.00 |
| 37 | 624(A) 4281 |
FENCE-STYLE WWF | 9,880 | LF |
$6.50 |
$4.75 |
$9.00 |
$11.00 |
| 38 | 624(B) 4462 |
GATES-STYLE WWF (4.5'HIGH X 12'LONG) | 3 | EA |
$540.00 |
$978.50 |
$1,069.00 |
$725.00 |
| 39 | 624(B) 4466 |
GATES-STYLE WWF (4.5'HIGH X 16'LONG) | 1 | EA |
$1,400.00 |
$1,030.00 |
$1,069.00 |
$800.00 |
| 40 | 624(B) 4467 |
GATES-STYLE WWF (4.5'HIGH X 18' LONG) | 2 | EA |
$1,500.00 |
$1,236.00 |
$1,069.00 |
$900.00 |
| 41 | 624(C) 7181 |
FENCE-STYLE SWF (6 BARBED WIRE) | 19,108 | LF |
$8.50 |
$4.20 |
$8.40 |
$7.50 |
| 42 | 624(E) 4292 |
FENCE-STYLE CLF (6'HIGH, CLASS A) | 435 | LF |
$12.00 |
$43.80 |
$38.20 |
$30.00 |
| 43 | 624(F) 5960 |
GATES-STYLE CLF (6'HIGH X 12'LONG) | 2 | EA |
$1,000.00 |
$980.00 |
$1,745.00 |
$1,300.00 |
| 44 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 14 | EA |
$110.00 |
$114.00 |
$109.00 |
$325.00 |
| 45 | 413(A) 4861 |
RUMBLE STRIP-METHOD HMA-CON | 38,200 | LF |
$0.2000 |
$0.2000 |
$0.1000 |
$0.3000 |
| 46 | 413(A) 4870 |
RUMBLE STRIP-CENTERLINE HMA-CON | 19,100 | LF |
$0.2000 |
$0.2000 |
$0.1300 |
$0.5000 |
| 47 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 9 | EA |
$90.00 |
$154.00 |
$92.70 |
$90.00 |
| 48 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 20 | EA |
$310.00 |
$257.00 |
$201.50 |
$200.00 |
| 49 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 63,958 | LF |
$0.5000 |
$0.4900 |
$0.4000 |
$0.4000 |
| 50 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 194,400 | LF |
$0.2000 |
$0.1400 |
$0.1100 |
$0.1500 |
| 51 | 857(E) 8890 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | 43,392 | EA |
$0.5000 |
$0.3100 |
$0.5000 |
$0.5000 |
| 52 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 194,400 | LF |
$0.0800 |
$0.0900 |
$0.1500 |
$0.1500 |
| 53 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 30 | SD |
$28.00 |
$51.50 |
$19.60 |
$20.00 |
| 54 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 98 | SD |
$25.00 |
$51.50 |
$13.10 |
$15.00 |
| 55 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 125 | LF |
$20.00 |
$50.50 |
$80.90 |
$60.00 |
| 56 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 125 | LF |
$3.50 |
$26.50 |
$51.30 |
$60.00 |
| 57 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 150 | SD |
$4.50 |
$15.45 |
$1.10 |
$1.00 |
| 58 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 9,164 | SD |
$0.3200 |
$1.55 |
$0.0200 |
$0.0500 |
| 59 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 5,368 | SD |
$0.4500 |
$0.5200 |
$0.6500 |
$0.6000 |
| 60 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 7,760 | SD |
$0.8400 |
$0.2500 |
$1.55 |
$2.00 |
| 61 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 3,508 | SD |
$1.20 |
$1.00 |
$0.8200 |
$1.00 |
| 62 | 880(C) 8848 |
WING BARRICADES | 1,240 | SD |
$1.80 |
$0.5000 |
$0.1600 |
$0.2000 |
| 63 | 880(D) 8854 |
VERTICAL PANELS | 15,540 | SD |
$0.1200 |
$0.0500 |
$0.4100 |
$0.4000 |
| 64 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 7,564 | SD |
$0.3800 |
$2.80 |
$0.3800 |
$0.5000 |
| 65 | 880(F) 8878 |
DRUMS | 20,156 | SD |
$0.2500 |
$0.1000 |
$0.2800 |
$0.3500 |
| 66 | 880(G) 8890 |
CHANNELIZER CONES | 33,488 | SD |
$0.7500 |
$0.3500 |
$0.4100 |
$0.4000 |
| 67 | 880(I) 8902 |
FLAGGER | 196 | SD |
$65.00 |
$66.95 |
$38.20 |
$350.00 |
| 68 | 880(L) 8920 |
(SP) TRAFFIC SURVEILLANCE, OHP (NON-BIDDABLE) | 1,348 | HOUR |
$69.00 |
$69.00 |
$69.00 |
$69.00 |
| 69 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 310 | SD |
$12.00 |
$20.60 |
$15.30 |
$23.00 |
| 70 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$45,000.00 |
$68,950.00 |
$95,960.00 |
$100,000.00 |
| 71 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$7,500.00 |
$10,525.00 |
$3,818.03 |
$100,000.00 |
| 72 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$15,000.00 |
$10,525.00 |
$5,452.00 |
$75,000.00 |
| 73 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$379,154.00 |
$462,000.00 |
$461,080.00 |
$485,000.00 |