| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$15,000.00 |
$25,000.00 |
$9,950.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 907 | CY |
$8.75 |
$15.00 |
$12.00 |
$11.92 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,797.3 | CY |
$10.00 |
$20.00 |
$15.00 |
$12.54 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$4,000.00 |
$10,000.00 |
$5,400.00 |
$6,750.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 710.2 | LF |
$2.00 |
$2.00 |
$3.25 |
$2.99 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 250 | LF |
$10.00 |
$7.00 |
$24.00 |
$18.95 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 5,309.48 | SY |
$3.50 |
$4.00 |
$7.44 |
$6.95 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.1 | AC |
$265.00 |
$2,400.00 |
$9,200.00 |
$8,950.00 |
| 9 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 663.79 | CY |
$52.00 |
$50.00 |
$78.00 |
$44.31 |
| 10 | 310(B) 0149 |
SUBGRADE, METHOD B | 3,394.34 | SY |
$3.00 |
$5.00 |
$6.50 |
$4.45 |
| 11 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 292.32 | TON |
$32.00 |
$45.00 |
$36.00 |
$26.47 |
| 12 | 407(B) 0250 |
TACK COAT | 438 | GAL |
$3.00 |
$4.50 |
$3.80 |
$3.75 |
| 13 | 408 5774 |
PRIME COAT | 759.23 | GAL |
$2.00 |
$4.50 |
$6.42 |
$6.00 |
| 14 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 592.54 | TON |
$105.00 |
$88.55 |
$78.75 |
$75.00 |
| 15 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 295.11 | TON |
$150.00 |
$123.05 |
$109.95 |
$99.00 |
| 16 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 7 | CY |
$30.00 |
$30.00 |
$28.00 |
$40.00 |
| 17 | 509(B) 0321 |
CLASS A CONCRETE | 29.2 | CY |
$415.00 |
$750.00 |
$675.00 |
$1,000.00 |
| 18 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$275.00 |
$700.00 |
$300.00 |
$300.00 |
| 19 | 510(A) 6333 |
RETAINING WALL | 153.97 | SY |
$665.00 |
$95.00 |
$401.00 |
$600.00 |
| 20 | 511(A) 0332 |
REINFORCING STEEL | 2,130 | LB |
$1.25 |
$1.40 |
$2.00 |
$4.00 |
| 21 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 110.88 | TON |
$80.00 |
$55.00 |
$42.00 |
$39.76 |
| 22 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 66.53 | TON |
$46.00 |
$77.00 |
$35.00 |
$26.86 |
| 23 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$20,000.00 |
$2,500.00 |
$7,100.00 |
| 24 | 619(B) 0291 |
REMOVAL OF HEADWALL | 2 | EA |
$1,700.00 |
$10,000.00 |
$2,750.00 |
$2,500.00 |
| 25 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 1,662 | SY |
$7.25 |
$8.00 |
$7.47 |
$6.00 |
| 26 | 623(F) 6033 |
GUARDRAIL ANCHOR UNIT (TYPE II) | 4 | EA |
$1,600.00 |
$1,700.00 |
$3,575.00 |
$1,675.00 |
| 27 | 624(A) 4281 |
FENCE-STYLE WWF | 231.93 | LF |
$9.25 |
$10.00 |
$12.50 |
$9.20 |
| 28 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 1,537.92 | LF |
$6.10 |
$9.00 |
$8.20 |
$6.10 |
| 29 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 3 | EA |
$78.00 |
$100.00 |
$250.00 |
$100.00 |
| 30 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 670 | CY |
$15.00 |
$15.00 |
$10.00 |
$12.67 |
| 31 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 180 | CY |
$25.00 |
$15.00 |
$14.00 |
$45.00 |
| 32 | 501(F) 6352 |
GRANULAR BACKFILL | 76 | CY |
$65.00 |
$85.00 |
$104.58 |
$90.00 |
| 33 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 254 | LF |
$250.00 |
$240.00 |
$227.06 |
$625.00 |
| 34 | 504(B) 1305 |
SAW-CUT GROOVING | 213.1 | SY |
$7.75 |
$6.00 |
$16.00 |
$14.00 |
| 35 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 231.2 | LF |
$82.00 |
$85.00 |
$79.00 |
$175.00 |
| 36 | 506(A) 1322 |
STRUCTURAL STEEL | 290 | LB |
$2.75 |
$3.00 |
$3.15 |
$5.00 |
| 37 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 3 | EA |
$1,700.00 |
$650.00 |
$815.00 |
$1,000.00 |
| 38 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 3 | EA |
$2,100.00 |
$650.00 |
$815.00 |
$1,000.00 |
| 39 | 509(A) 1326 |
CLASS AA CONCRETE | 67.2 | CY |
$800.00 |
$800.00 |
$700.00 |
$925.00 |
| 40 | 509(B) 1328 |
CLASS A CONCRETE | 66.2 | CY |
$700.00 |
$750.00 |
$725.00 |
$925.00 |
| 41 | 511(A) 1332 |
REINFORCING STEEL | 24,960 | LB |
$1.00 |
$1.40 |
$1.04 |
$1.75 |
| 42 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 160 | LF |
$34.00 |
$40.00 |
$29.75 |
$30.00 |
| 43 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 356 | LF |
$50.00 |
$40.00 |
$35.56 |
$40.00 |
| 44 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 160 | LF |
$16.00 |
$20.00 |
$14.00 |
$15.00 |
| 45 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 356 | LF |
$20.00 |
$20.00 |
$14.00 |
$20.00 |
| 46 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 47 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 505 | TON |
$44.00 |
$60.00 |
$48.00 |
$39.76 |
| 48 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 110 | TON |
$34.00 |
$80.00 |
$45.00 |
$26.86 |
| 49 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 52 | LF |
$20.00 |
$16.00 |
$60.00 |
$50.00 |
| 50 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 60 | LF |
$30.00 |
$16.00 |
$30.00 |
$50.00 |
| 51 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$30,000.00 |
$20,000.00 |
$18,500.00 |
$18,990.00 |
| 52 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 34.5 | SF |
$22.00 |
$32.00 |
$26.75 |
$25.00 |
| 53 | 851(C) 8324 |
2" SQUARE TUBE POST | 94 | LF |
$9.50 |
$15.00 |
$10.70 |
$10.00 |
| 54 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 4 | EA |
$20.00 |
$18.00 |
$21.40 |
$15.00 |
| 55 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 3,750 | LF |
$1.25 |
$2.00 |
$1.65 |
$1.50 |
| 56 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$4,500.00 |
$8,250.00 |
$2,750.00 |
$2,250.00 |
| 57 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$12,000.00 |
$9,000.00 |
$8,750.00 |
$5,500.00 |
| 58 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,600.00 |
$8,000.00 |
$3,000.00 |
$4,000.00 |
| 59 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$8,000.00 |
$7,000.00 |
$9,000.00 |
$4,000.00 |
| 60 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$95,330.00 |
$50,000.00 |
$51,000.00 |
$125,300.00 |