| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 35 | CY |
$45.00 |
$50.00 |
$76.00 |
$50.00 |
| 2 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 442 | CY |
$45.00 |
$40.00 |
$61.00 |
$35.00 |
| 3 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 100 | TON |
$50.00 |
$25.00 |
$43.00 |
$25.00 |
| 4 | 407(B) 0250 |
TACK COAT | 4,701 | GAL |
$2.50 |
$2.00 |
$2.10 |
$2.00 |
| 5 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 7,020 | TON |
$85.00 |
$85.50 |
$80.65 |
$86.50 |
| 6 | 411(H) 6210 |
SUPERPAVE, TYPE S3(PATCH)(PG64-22OK) | 422 | TON |
$92.00 |
$125.00 |
$116.00 |
$125.00 |
| 7 | 411(I) 6310 |
SUPERPAVE, TYPE S4(PATCH)(PG64-22OK) | 141 | TON |
$92.00 |
$125.00 |
$102.00 |
$125.00 |
| 8 | 412 5267 |
COLD MILLING PAVEMENT | 62,669 | SY |
$1.50 |
$1.50 |
$1.20 |
$1.60 |
| 9 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 9 | CY |
$100.00 |
$50.00 |
$212.00 |
$200.00 |
| 10 | 506(A) 1322 |
STRUCTURAL STEEL | 2,227 | LB |
$2.40 |
$5.00 |
$7.00 |
$4.90 |
| 11 | 509(B) 0321 |
CLASS A CONCRETE | 23 | CY |
$350.00 |
$550.00 |
$585.00 |
$750.00 |
| 12 | 511(A) 0332 |
REINFORCING STEEL | 3,879 | LB |
$1.00 |
$1.00 |
$1.10 |
$0.6000 |
| 13 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 80 | LF |
$64.00 |
$75.00 |
$101.00 |
$100.00 |
| 14 | 613(A) 4507 |
34" X 53" R.C.PIPE ELLIPTICAL CLASS HE-III | 48 | LF |
$220.00 |
$95.00 |
$97.00 |
$220.00 |
| 15 | 613(M) 7188 |
TYPE C4 CULVERT END TREATMENT | 4 | EA |
$1,800.00 |
$1,500.00 |
$3,600.00 |
$2,200.00 |
| 16 | 613(M) 7192 |
TYPE BB4 CULVERT END TREATMENT | 2 | EA |
$2,300.00 |
$2,500.00 |
$4,600.00 |
$2,200.00 |
| 17 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 67,200 | LF |
$0.7500 |
$0.3500 |
$0.3400 |
$0.3200 |
| 18 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 25 | LF |
$10.30 |
$11.00 |
$7.25 |
$7.00 |
| 19 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$15,000.00 |
$12,500.00 |
$3,540.95 |
$21,273.90 |
| 20 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$62,000.00 |
$10,500.00 |
$70,000.00 |
$31,000.00 |