| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$38,000.00 |
$250,000.00 |
$58,520.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 71,767 | CY |
$7.20 |
$6.15 |
$8.30 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 500 | CY |
$19.40 |
$13.40 |
$21.95 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$15,000.00 |
$72,400.00 |
$112,235.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 5,420 | LF |
$1.50 |
$1.75 |
$2.20 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 602 | LF |
$6.00 |
$9.90 |
$11.35 |
| 7 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 72 | CY |
$110.00 |
$105.00 |
$120.20 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 190,527 | SY |
$1.50 |
$2.70 |
$2.75 |
| 9 | 230(F) 2812 |
WATERING | 7,622 | KGAL |
$1.50 |
$11.00 |
$10.55 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 39.37 | AC |
$425.00 |
$150.00 |
$1,875.00 |
| 11 | 234(A) 2824 |
FERTILIZING (10-20-10) | 20 | TON |
$600.00 |
$150.00 |
$1,646.00 |
| 12 | 241 2832 |
MOWING | 78.74 | AC |
$100.00 |
$100.00 |
$203.80 |
| 13 | 242 0400 |
(PL)STABILIZED CONSTRUCTION EXIT | 2 | EA |
$2,800.00 |
$2,000.00 |
$5,750.00 |
| 14 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 6,596 | CY |
$50.00 |
$58.30 |
$52.85 |
| 15 | 307(K) 4300 |
STABILIZED SUBGRADE | 35,503 | SY |
$5.25 |
$5.70 |
$6.40 |
| 16 | 325 5271 |
SEPARATOR FABRIC | 37,301 | SY |
$2.00 |
$1.50 |
$1.60 |
| 17 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 7,661 | TON |
$32.00 |
$26.70 |
$24.80 |
| 18 | 407(B) 0250 |
TACK COAT | 9,000 | GAL |
$3.00 |
$1.01 |
$3.70 |
| 19 | 408 5774 |
PRIME COAT | 21,211 | GAL |
$3.75 |
$1.01 |
$4.15 |
| 20 | 409(A) 4242 |
FABRIC REINFORCEMENT | 16,179 | SY |
$2.75 |
$1.00 |
$3.60 |
| 21 | 409(B) 4268 |
BITUMINOUS BINDER | 3,236 | GAL |
$4.50 |
$1.01 |
$2.95 |
| 22 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 4,531 | TON |
$80.00 |
$85.38 |
$82.05 |
| 23 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 7,730 | TON |
$75.00 |
$64.15 |
$73.70 |
| 24 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 4,225 | TON |
$89.00 |
$96.65 |
$90.40 |
| 25 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 2,731 | TON |
$85.00 |
$80.30 |
$76.85 |
| 26 | 412 5267 |
COLD MILLING PAVEMENT | 36,381 | SY |
$4.00 |
$1.20 |
$3.30 |
| 27 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 39 | CY |
$22.00 |
$20.10 |
$20.70 |
| 28 | 509(A) 0319 |
CLASS AA CONCRETE | 157 | CY |
$575.00 |
$446.80 |
$654.00 |
| 29 | 509(D) 0325 |
CLASS C CONCRETE | 2,953 | CY |
$300.00 |
$318.35 |
$271.70 |
| 30 | 511(A) 0332 |
REINFORCING STEEL | 22,210 | LB |
$1.15 |
$1.15 |
$1.35 |
| 31 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 171 | SY |
$95.00 |
$75.00 |
$78.55 |
| 32 | 611(G) 6002 |
INLET (SMD-TYPE 2) | 1 | EA |
$2,500.00 |
$4,300.00 |
$3,135.00 |
| 33 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 118 | LF |
$71.00 |
$65.85 |
$66.10 |
| 34 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 156 | LF |
$100.00 |
$91.29 |
$78.85 |
| 35 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 90 | LF |
$138.00 |
$104.35 |
$102.20 |
| 36 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 60 | LF |
$40.00 |
$107.35 |
$92.20 |
| 37 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 1,510 | LF |
$40.00 |
$38.20 |
$42.85 |
| 38 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$1,620.00 |
$660.00 |
$1,150.00 |
| 39 | 613(L) 5732 |
30" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$1,300.00 |
$830.00 |
$1,370.00 |
| 40 | 613(L) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$470.00 |
$1,325.00 |
$2,085.00 |
| 41 | 613(M) 7196 |
TYPE A6 CULVERT END TREATMENT | 2 | EA |
$952.00 |
$1,105.00 |
$1,881.00 |
| 42 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 36 | EA |
$1,210.00 |
$1,230.00 |
$1,881.00 |
| 43 | 613(M) 7203 |
TYPE CC6 CULVERT END TREATMENT | 2 | EA |
$2,830.00 |
$2,790.00 |
$2,090.00 |
| 44 | 613(T) 1187 |
STANDARD BEDDING MATERIAL, CLASS C | 127 | CY |
$35.00 |
$46.35 |
$65.60 |
| 45 | 613(V) 1180 |
TRENCH EXCAVATION | 298 | CY |
$10.00 |
$1.00 |
$10.35 |
| 46 | 613(W) 4502 |
30" JACKED CONDUIT | 108 | LF |
$328.00 |
$705.50 |
$550.00 |
| 47 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$18,000.00 |
$340,000.00 |
$34,485.00 |
| 48 | 619(B) 0291 |
REMOVAL OF HEADWALL | 6 | EA |
$798.00 |
$1,150.00 |
$1,255.00 |
| 49 | 619(C) 0924 |
SAWING PAVEMENT | 28,286 | LF |
$3.00 |
$1.70 |
$1.80 |
| 50 | 624(A) 4281 |
FENCE-STYLE WWF | 2,224 | LF |
$5.00 |
$4.75 |
$9.30 |
| 51 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 5,991 | LF |
$5.50 |
$5.30 |
$7.75 |
| 52 | 624(C) 7181 |
FENCE-STYLE SWF (6 BARBED WIRE) | 3,958 | LF |
$5.00 |
$5.45 |
$8.30 |
| 53 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 4 | EA |
$130.00 |
$110.00 |
$104.50 |
| 54 | 629(B) 4959 |
MAILBOX INSTALLATION-MULTIPLE | 4 | EA |
$150.00 |
$225.00 |
$209.00 |
| 55 | 629(C) 4960 |
MAILBOX | 13 | EA |
$50.00 |
$55.00 |
$52.25 |
| 56 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 13 | EA |
$40.00 |
$25.00 |
$52.25 |
| 57 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 51,450 | LF |
$0.2000 |
$0.0800 |
$0.1000 |
| 58 | 857(E) 8890 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | 500 | EA |
$1.00 |
$0.5500 |
$0.5500 |
| 59 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 18,000 | LF |
$0.2000 |
$0.1100 |
$0.1200 |
| 60 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 600 | SD |
$7.00 |
$5.00 |
$5.25 |
| 61 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 600 | SD |
$15.00 |
$5.00 |
$5.25 |
| 62 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 1,500 | LF |
$25.00 |
$7.50 |
$26.85 |
| 63 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 1,500 | LF |
$4.00 |
$2.50 |
$11.20 |
| 64 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 3,600 | SD |
$0.3000 |
$0.2500 |
$0.3000 |
| 65 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,400 | SD |
$0.6000 |
$2.00 |
$2.10 |
| 66 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 4,200 | SD |
$1.20 |
$2.00 |
$2.10 |
| 67 | 880(C) 8848 |
WING BARRICADES | 1,200 | SD |
$1.45 |
$1.00 |
$1.05 |
| 68 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 3,600 | SD |
$0.4000 |
$2.50 |
$2.65 |
| 69 | 880(F) 8878 |
DRUMS | 2,700 | SD |
$0.2500 |
$0.1000 |
$0.1200 |
| 70 | 880(G) 8890 |
CHANNELIZER CONES | 51,600 | SD |
$0.3000 |
$0.1000 |
$0.1200 |
| 71 | 880(I) 8902 |
FLAGGER | 300 | SD |
$120.00 |
$10.00 |
$104.50 |
| 72 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 628 | SD |
$14.00 |
$7.00 |
$7.35 |
| 73 | 413(A) 4861 |
RUMBLE STRIP-METHOD HMA-CON | 25,725 | LF |
$0.2000 |
$0.1500 |
$0.2000 |
| 74 | 413(A) 4870 |
RUMBLE STRIP-CENTERLINE HMA-CON | 12,865 | LF |
$0.2000 |
$0.1500 |
$0.2000 |
| 75 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 15 | EA |
$85.00 |
$27.90 |
$26.15 |
| 76 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 106 | SF |
$22.00 |
$23.50 |
$21.95 |
| 77 | 851(C) 8324 |
2" SQUARE TUBE POST | 211.5 | LF |
$8.00 |
$10.00 |
$9.45 |
| 78 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 51,450 | LF |
$0.5000 |
$0.4500 |
$0.4500 |
| 79 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 70 | LF |
$7.00 |
$5.00 |
$5.25 |
| 80 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$77,175.00 |
$95,000.00 |
$51,414.00 |
| 81 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,500.00 |
$5,747.50 |
| 82 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$17,000.00 |
$6,500.00 |
$6,795.00 |
| 83 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$305,546.00 |
$310,000.00 |
$337,000.00 |