| 10 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$35,000.00 |
$18,500.00 |
$15,000.00 |
$22,500.00 |
$77,927.03 |
$14,910.00 |
| 20 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 38,606 | CY |
$7.50 |
$6.31 |
$3.50 |
$5.00 |
$6.11 |
$6.08 |
| 30 | 202(D) 0184 |
UNCLASSIFIED BORROW | 80,228 | CY |
$9.50 |
$6.12 |
$8.50 |
$10.00 |
$7.13 |
$6.27 |
| 40 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$34,320.00 |
$16,500.00 |
$20,000.00 |
$25,500.00 |
$16,050.00 |
$15,975.00 |
| 50 | 221(C) 2801 |
TEMPORARY SILT FENCE | 5,361 | LF |
$2.50 |
$2.41 |
$2.30 |
$2.20 |
$2.26 |
$2.25 |
| 60 | 221(F) 0100 |
TEMPORARY SILT DIKE | 210 | LF |
$14.75 |
$22.00 |
$20.00 |
$20.00 |
$20.31 |
$20.21 |
| 70 | 221(K) 0600 |
TEMPORARY FIBER LOG | 4,759 | LF |
$6.15 |
$8.45 |
$8.75 |
$9.00 |
$8.54 |
$8.50 |
| 80 | 229 4318 |
DITCH LINER PROTECTION | 2,329 | LF |
$3.50 |
$2.65 |
$2.73 |
$3.00 |
$2.66 |
$2.65 |
| 90 | 230(A) 2806 |
SOLID SLAB SODDING | 24,707 | SY |
$4.00 |
$3.20 |
$3.35 |
$3.00 |
$2.66 |
$2.65 |
| 100 | 233(A) 2817 |
VEGETATIVE MULCHING | 5.11 | AC |
$1,200.00 |
$525.00 |
$550.00 |
$500.00 |
$535.00 |
$532.50 |
| 110 | 233(E) 2822 |
EXCELSIOR MAT | 1,500 | SY |
$10.00 |
$7.16 |
$7.50 |
$8.00 |
$7.36 |
$7.33 |
| 120 | 241 2832 |
MOWING | 16.48 | AC |
$100.00 |
$75.00 |
$70.00 |
$65.00 |
$69.55 |
$69.23 |
| 130 | 307(K) 4300 |
STABILIZED SUBGRADE | 14,619 | SY |
$8.00 |
$6.98 |
$7.00 |
$7.00 |
$7.19 |
$7.16 |
| 140 | 407(B) 0250 |
TACK COAT | 2,022 | GAL |
$3.95 |
$3.95 |
$5.00 |
$5.25 |
$5.08 |
$5.06 |
| 150 | 408 5774 |
PRIME COAT | 5,312 | GAL |
$5.00 |
$5.15 |
$4.45 |
$4.65 |
$4.54 |
$4.52 |
| 160 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 667 | TON |
$130.00 |
$144.60 |
$165.00 |
$149.00 |
$144.34 |
$143.67 |
| 170 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 4,241 | TON |
$110.00 |
$132.65 |
$117.00 |
$118.00 |
$115.40 |
$114.86 |
| 180 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 445 | TON |
$175.00 |
$162.07 |
$215.00 |
$190.00 |
$184.04 |
$183.18 |
| 190 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,053 | TON |
$160.00 |
$144.53 |
$145.00 |
$135.00 |
$131.61 |
$131.00 |
| 200 | 509(B) 0321 |
CLASS A CONCRETE | 21 | CY |
$1,400.00 |
$650.00 |
$850.00 |
$615.00 |
$1,230.37 |
$789.42 |
| 210 | 509(D) 0325 |
CLASS C CONCRETE | 419 | CY |
$350.00 |
$320.00 |
$350.00 |
$351.00 |
$315.02 |
$277.69 |
| 220 | 511(A) 0332 |
REINFORCING STEEL | 200 | LB |
$3.10 |
$6.00 |
$1.25 |
$2.00 |
$1.45 |
$4.96 |
| 230 | 613(B) 5739 |
84" CORR. GALV. STEEL PIPE | 387 | LF |
$150.00 |
$188.68 |
$190.00 |
$185.00 |
$190.46 |
$189.57 |
| 240 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,110.00 |
$7,400.00 |
$5,000.00 |
$10,000.00 |
$34,133.00 |
$7,348.50 |
| 250 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 9,623 | SY |
$9.00 |
$5.11 |
$6.00 |
$6.85 |
$4.39 |
$7.46 |
| 260 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 561 | LF |
$4.50 |
$3.00 |
$5.00 |
$4.00 |
$2.41 |
$6.95 |
| 280 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 75 | LF |
$20.00 |
$21.50 |
$21.50 |
$21.00 |
$26.38 |
$20.77 |
| 290 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,500.00 |
$2,550.00 |
$3,500.00 |
$2,450.00 |
$2,990.65 |
$2,396.25 |
| 300 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$2,100.00 |
$2,750.00 |
$3,500.00 |
$2,675.00 |
$2,049.05 |
$2,609.25 |
| 310 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 988 | LF |
$10.00 |
$10.00 |
$8.80 |
$9.00 |
$6.21 |
$6.92 |
| 320 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 1 | EA |
$150.00 |
$300.00 |
$275.00 |
$275.00 |
$90.95 |
$90.53 |
| 330 | 629(C) 4960 |
MAILBOX | 1 | EA |
$50.00 |
$65.00 |
$40.00 |
$38.00 |
$58.85 |
$58.58 |
| 340 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 1 | EA |
$25.00 |
$75.00 |
$50.00 |
$49.00 |
$53.50 |
$53.25 |
| 350 | 853 9033 |
DELINEATORS(TYPE 2, CODE 1) | 12 | EA |
$14.50 |
$14.25 |
$13.50 |
$14.00 |
$16.05 |
$14.11 |
| 360 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 180 | CY |
$20.00 |
$16.00 |
$15.00 |
$10.50 |
$21.60 |
$30.00 |
| 370 | 501(G) 6309 |
CLSM BACKFILL | 206 | CY |
$200.00 |
$153.40 |
$150.00 |
$160.00 |
$180.42 |
$200.00 |
| 380 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 1,795 | LF |
$400.00 |
$229.56 |
$225.00 |
$242.00 |
$268.38 |
$390.00 |
| 390 | 504(A) 1304 |
APPROACH SLAB | 281.2 | SY |
$280.00 |
$226.24 |
$220.00 |
$225.00 |
$273.70 |
$250.00 |
| 400 | 504(B) 1305 |
SAW-CUT GROOVING | 2,273.8 | SY |
$5.00 |
$4.30 |
$4.45 |
$4.50 |
$4.37 |
$4.31 |
| 410 | 504(C) 6250 |
SEALED EXPANSION JOINT | 85.33 | LF |
$340.00 |
$305.75 |
$295.00 |
$300.00 |
$295.20 |
$325.00 |
| 420 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 1,023.33 | LF |
$110.00 |
$78.50 |
$85.00 |
$89.50 |
$83.98 |
$105.00 |
| 430 | 506(A) 1322 |
STRUCTURAL STEEL | 2,250 | LB |
$3.50 |
$2.95 |
$2.40 |
$2.50 |
$6.70 |
$3.00 |
| 440 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 16 | EA |
$1,800.00 |
$1,720.00 |
$1,600.00 |
$1,900.00 |
$2,088.18 |
$2,800.00 |
| 450 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 24 | EA |
$1,800.00 |
$1,720.00 |
$1,600.00 |
$1,900.00 |
$2,101.18 |
$2,800.00 |
| 451 | 509 5000 |
ELASTOMERIC COATING | 1,460 | SF |
$15.00 |
$15.70 |
$17.00 |
$19.40 |
$7.76 |
$20.13 |
| 460 | 509(A) 1326 |
CLASS AA CONCRETE | 525.6 | CY |
$750.00 |
$570.00 |
$600.00 |
$600.00 |
$780.40 |
$700.00 |
| 470 | 509(B) 1328 |
CLASS A CONCRETE | 280.8 | CY |
$800.00 |
$595.00 |
$650.00 |
$615.00 |
$593.87 |
$850.00 |
| 480 | 509(D) 1331 |
CLASS C CONCRETE | 10.4 | CY |
$700.00 |
$315.00 |
$500.00 |
$550.00 |
$418.04 |
$1,700.00 |
| 490 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 159,780 | LB |
$1.20 |
$1.15 |
$1.45 |
$1.22 |
$1.33 |
$1.20 |
| 500 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 168 | LF |
$35.00 |
$35.16 |
$35.00 |
$35.00 |
$41.14 |
$40.00 |
| 510 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 522 | LF |
$45.00 |
$40.78 |
$40.00 |
$42.00 |
$49.86 |
$50.00 |
| 520 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 168 | LF |
$16.00 |
$14.00 |
$15.00 |
$15.00 |
$21.60 |
$25.00 |
| 530 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 522 | LF |
$17.00 |
$14.00 |
$15.00 |
$18.00 |
$21.60 |
$25.00 |
| 540 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 14 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 550 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,905 | SY |
$4.50 |
$4.25 |
$3.25 |
$4.40 |
$4.32 |
$4.26 |
| 560 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 454 | LF |
$900.00 |
$821.88 |
$1,200.00 |
$800.00 |
$960.46 |
$950.00 |
| 570 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 2 | EA |
$5,000.00 |
$2,150.00 |
$2,000.00 |
$3,000.00 |
$4,536.00 |
$1,810.50 |
| 580 | 523(A) 6550 |
SEALER CRACK PREPARATION | 81.6 | LF |
$5.00 |
$8.50 |
$5.00 |
$5.00 |
$5.40 |
$5.33 |
| 590 | 523(B) 6560 |
SEALER RESIN | 1 | GAL |
$200.00 |
$250.00 |
$150.00 |
$200.00 |
$216.00 |
$213.00 |
| 600 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,680 | TON |
$75.00 |
$52.00 |
$62.00 |
$61.50 |
$66.44 |
$65.00 |
| 610 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 345 | TON |
$65.00 |
$46.00 |
$52.00 |
$48.25 |
$51.51 |
$50.00 |
| 620 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$40.00 |
$30.00 |
$30.00 |
$30.00 |
$25.74 |
$40.00 |
| 630 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 74 | LF |
$40.00 |
$25.00 |
$30.00 |
$30.00 |
$25.84 |
$40.00 |
| 640 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$200,000.00 |
$120,000.00 |
$150,000.00 |
$240,000.00 |
$258,120.00 |
$189,500.00 |
| 650 | 854(A) 8800 |
TRAFFIC STRIPE(PAINT)(4" WIDE) | 8,800 | LF |
$0.2500 |
$0.2600 |
$0.2600 |
$0.2600 |
$0.1600 |
$0.1600 |
| 660 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 800 | LF |
$0.2000 |
$3.15 |
$3.10 |
$3.25 |
$0.5300 |
$0.5300 |
| 670 | 858(A) 8905 |
PAVEMENT MARKERS CLASS A TYPE 2-A | 390 | EA |
$2.00 |
$6.76 |
$6.55 |
$7.00 |
$2.10 |
$2.13 |
| 680 | 858(A) 8914 |
PAVEMENT MARKERS CLASS A TYPE 2-D | 630 | EA |
$6.00 |
$6.76 |
$6.55 |
$7.00 |
$2.10 |
$2.13 |
| 690 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 860 | SD |
$7.80 |
$34.65 |
$34.00 |
$36.00 |
$5.25 |
$5.33 |
| 700 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 3,775 | LF |
$23.00 |
$17.80 |
$17.50 |
$20.40 |
$23.10 |
$21.89 |
| 710 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 6,000 | SD |
$0.4000 |
$0.5200 |
$0.5200 |
$0.5500 |
$0.2600 |
$0.2700 |
| 720 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 3,600 | SD |
$0.7000 |
$0.5200 |
$0.5200 |
$0.5500 |
$1.58 |
$1.60 |
| 730 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 10,500 | SD |
$1.70 |
$0.5200 |
$0.5200 |
$0.5500 |
$2.10 |
$2.13 |
| 740 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 5,100 | SD |
$0.8000 |
$0.0300 |
$0.0400 |
$0.0300 |
$0.1100 |
$0.1100 |
| 750 | 880(C) 8848 |
WING BARRICADES | 1,200 | SD |
$2.00 |
$0.0400 |
$0.0400 |
$0.0300 |
$1.58 |
$1.60 |
| 760 | 880(D) 8854 |
VERTICAL PANELS | 6,000 | SD |
$0.1500 |
$0.0700 |
$0.0700 |
$0.0600 |
$0.3200 |
$0.3200 |
| 770 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 14,400 | SD |
$0.3500 |
$0.2700 |
$0.2700 |
$0.2800 |
$0.1100 |
$0.1100 |
| 780 | 880(F) 8878 |
DRUMS | 9,600 | SD |
$0.2000 |
$0.3900 |
$0.3700 |
$0.4000 |
$0.3200 |
$0.3200 |
| 790 | 880(G) 8890 |
CHANNELIZER CONES | 7,800 | SD |
$0.3000 |
$0.0400 |
$0.0400 |
$0.0300 |
$0.3200 |
$0.3200 |
| 800 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 628 | SD |
$11.00 |
$25.20 |
$25.00 |
$26.00 |
$15.75 |
$15.98 |
| 810 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 10 | EA |
$64.00 |
$105.00 |
$100.00 |
$115.00 |
$52.50 |
$53.25 |
| 820 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 2 | EA |
$210.00 |
$275.00 |
$300.00 |
$2,500.00 |
$210.00 |
$213.00 |
| 830 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 71.13 | SF |
$23.00 |
$46.80 |
$47.00 |
$50.00 |
$15.75 |
$15.97 |
| 840 | 851(C) 8324 |
2" SQUARE TUBE POST | 140 | LF |
$10.20 |
$6.30 |
$6.50 |
$7.00 |
$8.40 |
$8.52 |
| 850 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 8,800 | LF |
$0.6000 |
$1.03 |
$1.00 |
$1.06 |
$0.6800 |
$0.6900 |
| 860 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$120,000.00 |
$16,500.00 |
$16,500.00 |
$35,000.00 |
$19,558.00 |
$15,762.00 |
| 870 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,500.00 |
$4,000.00 |
$6,500.00 |
$6,480.00 |
$7,500.00 |
| 880 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$290,000.00 |
$230,000.00 |
$270,000.00 |
$257,500.00 |
$274,807.14 |
$282,000.00 |