| 10 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$12,000.00 |
$5,800.00 |
$7,500.00 |
$3,500.00 |
$8,000.00 |
$14,000.00 |
$15,380.00 |
| 20 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 2,628 | CY |
$11.00 |
$5.75 |
$5.50 |
$6.75 |
$10.00 |
$7.50 |
$5.75 |
| 30 | 202(D) 0184 |
UNCLASSIFIED BORROW | 4,256 | CY |
$8.00 |
$6.90 |
$10.50 |
$9.00 |
$10.00 |
$9.40 |
$10.90 |
| 40 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,000.00 |
$8,400.00 |
$10,210.00 |
$5,000.00 |
$12,000.00 |
$13,500.00 |
$14,420.00 |
| 50 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,400 | LF |
$2.25 |
$1.10 |
$1.99 |
$2.00 |
$3.30 |
$2.50 |
$2.05 |
| 60 | 221(F) 0100 |
TEMPORARY SILT DIKE | 392 | LF |
$9.20 |
$5.70 |
$12.95 |
$13.25 |
$16.50 |
$14.00 |
$13.20 |
| 70 | 230(A) 2806 |
SOLID SLAB SODDING | 14,700 | SY |
$3.25 |
$3.15 |
$2.99 |
$3.00 |
$3.55 |
$3.44 |
$3.05 |
| 80 | 233(A) 2817 |
VEGETATIVE MULCHING | 3.04 | AC |
$1,200.00 |
$400.00 |
$1,950.00 |
$1,950.00 |
$1,650.00 |
$1,975.00 |
$1,992.00 |
| 90 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,549 | TON |
$37.60 |
$34.65 |
$34.97 |
$39.00 |
$50.00 |
$46.95 |
$36.50 |
| 100 | 509(B) 0321 |
CLASS A CONCRETE | 37.92 | CY |
$350.00 |
$450.00 |
$400.00 |
$425.00 |
$750.00 |
$325.00 |
$492.50 |
| 110 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$300.00 |
$225.00 |
$400.00 |
$300.00 |
$350.00 |
$300.00 |
$300.00 |
| 120 | 511(A) 0332 |
REINFORCING STEEL | 380 | LB |
$1.20 |
$2.09 |
$1.10 |
$1.40 |
$1.20 |
$1.12 |
$3.40 |
| 130 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 56 | LF |
$36.50 |
$35.00 |
$33.95 |
$45.00 |
$32.00 |
$30.00 |
$33.30 |
| 140 | 613(B) 0692 |
36" CORR. GALV. STEEL PIPE | 70 | LF |
$60.20 |
$56.00 |
$55.99 |
$85.00 |
$63.00 |
$53.00 |
$64.10 |
| 150 | 613(B) 0696 |
60" CORR. GALV. STEEL PIPE | 240 | LF |
$120.00 |
$115.00 |
$111.60 |
$140.00 |
$125.00 |
$108.00 |
$114.50 |
| 160 | 613(B) 0697 |
66" CORR. GALV. STEEL PIPE | 220 | LF |
$135.00 |
$126.00 |
$125.55 |
$155.00 |
$135.00 |
$115.50 |
$126.50 |
| 170 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 56 | LF |
$44.25 |
$29.00 |
$41.16 |
$50.00 |
$42.00 |
$37.00 |
$45.30 |
| 180 | 613(M) 7150 |
TYPE A3 CULVERT END TREATMENT | 2 | EA |
$1,250.00 |
$825.00 |
$1,200.00 |
$1,400.00 |
$1,200.00 |
$1,200.00 |
$942.00 |
| 190 | 613(M) 7151 |
TYPE B3 CULVERT END TREATMENT | 2 | EA |
$1,505.00 |
$1,150.00 |
$1,400.00 |
$1,600.00 |
$1,500.00 |
$1,850.00 |
$1,391.00 |
| 200 | 613(M) 7153 |
TYPE D3 CULVERT END TREATMENT | 2 | EA |
$2,300.00 |
$1,725.00 |
$2,200.00 |
$2,300.00 |
$2,000.00 |
$2,250.00 |
$1,839.00 |
| 210 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$9,250.00 |
$4,250.00 |
$7,000.00 |
$5,500.00 |
$8,000.00 |
$6,500.00 |
$11,075.00 |
| 220 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 200 | CY |
$12.00 |
$8.25 |
$25.00 |
$15.00 |
$15.00 |
$14.00 |
$24.70 |
| 230 | 501(F) 6352 |
GRANULAR BACKFILL | 120 | CY |
$75.00 |
$59.00 |
$65.00 |
$90.00 |
$80.00 |
$86.74 |
$92.40 |
| 240 | 503(A) 1311 |
PRESTRESSED CONCRETE BEAMS (TYPE II) | 477 | LF |
$209.00 |
$186.00 |
$199.26 |
$195.00 |
$200.00 |
$210.18 |
$198.00 |
| 250 | 504(C) 6250 |
SEALED EXPANSION JOINT | 58.34 | LF |
$280.00 |
$255.00 |
$298.01 |
$300.00 |
$300.00 |
$323.38 |
$270.50 |
| 260 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 326.4 | LF |
$80.00 |
$73.00 |
$80.99 |
$80.00 |
$75.00 |
$75.00 |
$98.40 |
| 270 | 506(A) 1322 |
STRUCTURAL STEEL | 1,060 | LB |
$3.00 |
$2.61 |
$2.68 |
$2.75 |
$3.50 |
$3.10 |
$4.15 |
| 280 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 9 | EA |
$775.00 |
$833.00 |
$866.55 |
$900.00 |
$600.00 |
$602.00 |
$941.00 |
| 290 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 9 | EA |
$775.00 |
$833.00 |
$866.55 |
$900.00 |
$600.00 |
$602.00 |
$941.00 |
| 300 | 509(A) 1326 |
CLASS AA CONCRETE | 124.5 | CY |
$650.00 |
$580.00 |
$665.00 |
$625.00 |
$600.00 |
$650.00 |
$575.50 |
| 310 | 509(B) 1328 |
CLASS A CONCRETE | 100.8 | CY |
$650.00 |
$601.00 |
$665.00 |
$625.00 |
$600.00 |
$650.00 |
$675.00 |
| 320 | 511(A) 1332 |
REINFORCING STEEL | 44,820 | LB |
$1.00 |
$0.9900 |
$1.15 |
$1.00 |
$1.10 |
$1.08 |
$1.45 |
| 330 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 594 | LF |
$31.00 |
$35.70 |
$36.46 |
$48.00 |
$35.00 |
$39.38 |
$45.70 |
| 340 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 594 | LF |
$12.00 |
$15.30 |
$15.00 |
$8.00 |
$15.00 |
$12.00 |
$21.00 |
| 350 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 360 | 516(A) 6094 |
DRILLED SHAFTS 48" DIAMETER | 104 | LF |
$700.00 |
$690.00 |
$887.64 |
$600.00 |
$650.00 |
$941.00 |
$782.50 |
| 370 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,848 | TON |
$45.25 |
$46.50 |
$53.05 |
$50.00 |
$48.00 |
$48.30 |
$45.50 |
| 380 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 616 | TON |
$37.25 |
$38.00 |
$43.40 |
$40.00 |
$38.00 |
$44.00 |
$38.80 |
| 390 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 106 | LF |
$34.00 |
$27.00 |
$30.00 |
$35.00 |
$30.00 |
$30.00 |
$33.60 |
| 400 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 80 | LF |
$30.00 |
$26.00 |
$30.00 |
$35.00 |
$30.00 |
$25.00 |
$21.20 |
| 410 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$14,000.00 |
$11,000.00 |
$5,425.00 |
$17,000.00 |
$10,000.00 |
$24,500.00 |
$24,490.00 |
| 420 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$2,500.00 |
$2,200.00 |
$2,195.00 |
$2,195.00 |
$2,500.00 |
$2,325.00 |
$2,242.00 |
| 430 | 623(F) 6029 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 4 | EA |
$2,200.00 |
$1,300.00 |
$1,200.00 |
$1,200.00 |
$2,500.00 |
$2,325.00 |
$1,226.00 |
| 440 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 20.72 | SF |
$29.20 |
$68.00 |
$62.00 |
$62.00 |
$36.00 |
$39.00 |
$63.30 |
| 450 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 9,360 | SD |
$0.0400 |
$0.7500 |
$0.6700 |
$0.6700 |
$0.4000 |
$0.3700 |
$0.6800 |
| 460 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 4,080 | SD |
$0.6500 |
$0.7000 |
$0.6700 |
$0.6700 |
$0.2000 |
$0.1700 |
$0.6800 |
| 470 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 3,600 | SD |
$1.00 |
$0.1000 |
$0.0500 |
$0.0500 |
$0.3000 |
$0.2800 |
$0.0500 |
| 480 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 8,400 | SD |
$0.0400 |
$0.0500 |
$0.0200 |
$0.0200 |
$0.5500 |
$0.5400 |
$0.0200 |
| 490 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$7,200.00 |
$8,000.00 |
$7,300.00 |
$7,500.00 |
$8,000.00 |
$8,000.00 |
$11,955.00 |
| 500 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,000.00 |
$1,500.00 |
$2,500.00 |
$1,275.00 |
$3,000.00 |
$3,500.00 |
$2,298.00 |
| 510 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$50,000.00 |
$67,300.00 |
$28,150.68 |
$75,523.05 |
$49,000.00 |
$50,000.00 |
$69,905.00 |