| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$30,000.00 |
$19,467.00 |
$27,500.00 |
$30,000.00 |
$30,982.19 |
$35,000.00 |
$10,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 8,700 | CY |
$10.00 |
$8.03 |
$5.62 |
$6.80 |
$14.13 |
$10.00 |
$15.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 18,602 | CY |
$10.00 |
$7.14 |
$8.72 |
$8.00 |
$9.15 |
$12.00 |
$23.50 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,000.00 |
$7,725.00 |
$8,500.00 |
$30,000.00 |
$10,074.91 |
$16,500.00 |
$5,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,150 | LF |
$4.36 |
$4.07 |
$4.95 |
$4.00 |
$3.69 |
$4.50 |
$2.50 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 217 | LF |
$20.45 |
$19.52 |
$20.95 |
$13.80 |
$12.65 |
$21.00 |
$15.00 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 16,720 | SY |
$4.25 |
$3.86 |
$5.39 |
$3.57 |
$3.43 |
$4.10 |
$3.80 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 6.58 | AC |
$2,000.00 |
$3,038.50 |
$3,150.00 |
$1,150.00 |
$1,054.08 |
$4,400.00 |
$4,400.00 |
| 9 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,850 | TON |
$25.00 |
$22.17 |
$35.06 |
$31.25 |
$25.18 |
$32.00 |
$30.00 |
| 10 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 77.4 | CY |
$31.59 |
$15.45 |
$18.00 |
$23.00 |
$22.53 |
$15.00 |
$20.00 |
| 11 | 509(A) 0319 |
CLASS AA CONCRETE | 145.1 | CY |
$527.00 |
$398.61 |
$535.00 |
$522.50 |
$550.63 |
$750.00 |
$400.00 |
| 12 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$441.25 |
$540.75 |
$300.00 |
$385.00 |
$408.19 |
$250.00 |
$350.00 |
| 13 | 511(A) 0332 |
REINFORCING STEEL | 19,102 | LB |
$1.10 |
$1.18 |
$1.08 |
$1.04 |
$0.9400 |
$1.00 |
$1.10 |
| 14 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 78 | LF |
$90.00 |
$77.51 |
$93.97 |
$74.18 |
$89.17 |
$85.00 |
$85.00 |
| 15 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 192 | LF |
$35.00 |
$34.05 |
$28.00 |
$33.62 |
$52.13 |
$45.00 |
$30.00 |
| 16 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 8 | EA |
$851.03 |
$448.05 |
$300.00 |
$60.00 |
$802.54 |
$365.00 |
$250.00 |
| 17 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$1,352.03 |
$1,174.20 |
$978.72 |
$327.50 |
$1,437.29 |
$1,000.00 |
$1,500.00 |
| 18 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$7,107.00 |
$8,500.00 |
$15,000.00 |
$10,562.11 |
$18,000.00 |
$8,000.00 |
| 19 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 87.5 | LF |
$20.75 |
$16.48 |
$21.50 |
$18.40 |
$16.87 |
$16.00 |
$25.00 |
| 20 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,545.14 |
$2,575.00 |
$2,850.00 |
$2,875.00 |
$2,635.20 |
$2,500.00 |
$2,000.00 |
| 21 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,627.99 |
$1,442.00 |
$1,850.00 |
$1,610.00 |
$1,475.72 |
$1,400.00 |
$1,500.00 |
| 22 | 624(A) 4281 |
FENCE-STYLE WWF | 1,240 | LF |
$9.47 |
$7.00 |
$6.72 |
$6.90 |
$6.32 |
$6.80 |
$12.00 |
| 23 | 624(C) 4458 |
FENCE-STYLE SWF (4 BARBED WIRE) | 1,840 | LF |
$5.58 |
$6.48 |
$5.60 |
$5.75 |
$5.27 |
$6.30 |
$6.00 |
| 24 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 215 | LF |
$14.01 |
$6.59 |
$7.50 |
$6.04 |
$5.53 |
$6.40 |
$8.00 |
| 25 | 624(D) 4470 |
GATE, GALVANIZED STEEL | 1 | EA |
$901.23 |
$1,112.40 |
$1,250.00 |
$1,000.00 |
$843.27 |
$1,080.00 |
$2,500.00 |
| 26 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 1 | EA |
$187.05 |
$103.00 |
$125.00 |
$115.00 |
$105.41 |
$100.00 |
$50.00 |
| 27 | 629(C) 4960 |
MAILBOX | 1 | EA |
$41.54 |
$51.50 |
$65.00 |
$57.50 |
$52.70 |
$50.00 |
$50.00 |
| 28 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$15,000.00 |
$3,399.00 |
$4,000.00 |
$5,000.00 |
$3,478.47 |
$3,300.00 |
$4,000.00 |
| 29 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 190 | CY |
$24.64 |
$30.90 |
$14.00 |
$34.50 |
$23.59 |
$15.00 |
$20.00 |
| 30 | 501(F) 6352 |
GRANULAR BACKFILL | 76 | CY |
$65.56 |
$72.73 |
$84.00 |
$69.00 |
$59.13 |
$85.00 |
$65.00 |
| 31 | 503(A) 1311 |
PRESTRESSED CONCRETE BEAMS (TYPE II) | 417 | LF |
$201.77 |
$239.75 |
$234.14 |
$269.50 |
$290.20 |
$240.00 |
$235.00 |
| 32 | 504(B) 1305 |
SAW-CUT GROOVING | 346.7 | SY |
$7.26 |
$9.74 |
$9.00 |
$6.90 |
$10.98 |
$7.80 |
$8.50 |
| 33 | 504(C) 6250 |
SEALED EXPANSION JOINT | 33.06 | LF |
$290.38 |
$304.16 |
$311.77 |
$13.80 |
$304.88 |
$380.00 |
$350.00 |
| 34 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 348.2 | LF |
$84.48 |
$81.77 |
$84.00 |
$165.00 |
$97.19 |
$85.00 |
$80.00 |
| 35 | 506(A) 1322 |
STRUCTURAL STEEL | 1,220 | LB |
$5.59 |
$2.70 |
$4.10 |
$4.60 |
$6.45 |
$3.50 |
$3.50 |
| 36 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 12 | EA |
$1,200.00 |
$922.91 |
$750.00 |
$920.00 |
$1,497.73 |
$1,000.00 |
$850.00 |
| 37 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 6 | EA |
$2,355.95 |
$922.91 |
$750.00 |
$805.00 |
$1,497.73 |
$1,000.00 |
$850.00 |
| 38 | 509(A) 1326 |
CLASS AA CONCRETE | 113.2 | CY |
$900.00 |
$712.90 |
$675.00 |
$577.50 |
$652.67 |
$750.00 |
$775.00 |
| 39 | 509(B) 1328 |
CLASS A CONCRETE | 118.6 | CY |
$900.00 |
$712.90 |
$675.00 |
$550.00 |
$767.62 |
$750.00 |
$725.00 |
| 40 | 511(A) 1332 |
REINFORCING STEEL | 54,018 | LB |
$1.16 |
$1.50 |
$1.10 |
$1.04 |
$0.9400 |
$1.15 |
$1.10 |
| 41 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 106 | LF |
$38.77 |
$30.39 |
$31.08 |
$46.00 |
$37.41 |
$45.00 |
$55.00 |
| 42 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 315 | LF |
$47.51 |
$35.76 |
$34.29 |
$51.75 |
$64.61 |
$55.00 |
$65.00 |
| 43 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 106 | LF |
$18.04 |
$15.45 |
$25.00 |
$28.75 |
$20.88 |
$10.00 |
$10.00 |
| 44 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 315 | LF |
$29.83 |
$15.45 |
$20.00 |
$28.75 |
$21.59 |
$10.00 |
$10.00 |
| 45 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 46 | 516(A) 6094 |
DRILLED SHAFTS 48" DIAMETER | 80 | LF |
$881.96 |
$1,008.44 |
$1,141.56 |
$1,210.00 |
$1,393.31 |
$1,100.00 |
$250.00 |
| 47 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 2 | EA |
$1,798.45 |
$1,905.50 |
$2,850.00 |
$2,300.00 |
$2,605.32 |
$2,500.00 |
$2,500.00 |
| 48 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,194 | TON |
$44.09 |
$44.57 |
$49.50 |
$58.50 |
$37.70 |
$48.00 |
$45.00 |
| 49 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 241 | TON |
$37.77 |
$35.25 |
$44.50 |
$30.50 |
$26.67 |
$40.00 |
$35.00 |
| 50 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 60 | LF |
$28.94 |
$22.44 |
$30.00 |
$24.00 |
$20.97 |
$35.00 |
$30.00 |
| 51 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 32 | LF |
$26.67 |
$22.44 |
$25.00 |
$20.00 |
$24.53 |
$35.00 |
$25.00 |
| 52 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$20,000.00 |
$15,450.00 |
$15,000.00 |
$10,000.00 |
$19,715.94 |
$10,000.00 |
$15,000.00 |
| 53 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$30,000.00 |
$6,695.00 |
$14,500.00 |
$10,000.00 |
$12,533.70 |
$10,000.00 |
$11,000.00 |
| 54 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$2,575.00 |
$3,500.00 |
$4,500.00 |
$2,112.42 |
$1,275.00 |
$5,000.00 |
| 55 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$90,000.00 |
$70,923.32 |
$82,000.00 |
$140,625.00 |
$118,718.11 |
$96,000.00 |
$25,000.00 |