Bid tab 200202

Let May 14, 2020 · Division 1 · Muskogee Sign up free

‹ May 2020 results

GRADE, DRAIN, AND BRIDGE COUNTY ROAD (EW-111): OVER SOUTH FORK CREEK, 3.0 MILES EAST OF THE SH -2 JUNCTION NEAR PORUM. PROJECT LENGTH = 0.387 MILE

Let date
Thursday, May 14, 2020
Contract
200202
J/P numbers
33051(04)
District
Division 1
County
Muskogee
Highway
Limits
GRADE, DRAIN, AND BRIDGE COUNTY ROAD (EW-111): OVER SOUTH FORK CREEK, 3.0 MILES EAST OF THE SH -2 JUNCTION NEAR PORUM. PROJECT LENGTH = 0.387 MILE
Project number
STP-251D(108)CI

Bidders 6

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$1,406,437
1 Treas Construction Inc Low bidder $1,205,894 -14.3%
2 BRIDGECO CONTRACTORS, INC. $1,299,278 -7.6% +7.7%
3 Robinson Construction, LLC $1,348,716 -4.1% +11.8%
5 C3 Construction, Inc. $1,418,891 +0.9% +17.7%
6 RRY SERVICES LLC $1,460,515 +3.8% +21.1%
7 BRIGHT LIGHTING, INC. DBA BL TOWER CONSTRUCTION $1,475,176 +4.9% +22.3%

Bid tab: unit prices 55 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 Treas Construct…#2 BRIDGECO CONTRA…#3 Robinson Constr…#5 C3 Construction…#6 RRY SERVICES LLC#7 BRIGHT LIGHTING…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $30,000.00 $19,467.00 $27,500.00 $30,000.00 $30,982.19 $35,000.00 $10,000.00
2202(A) 0183 UNCLASSIFIED EXCAVATION8,700CY $10.00 $8.03 $5.62 $6.80 $14.13 $10.00 $15.00
3202(D) 0184 UNCLASSIFIED BORROW18,602CY $10.00 $7.14 $8.72 $8.00 $9.15 $12.00 $23.50
4205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $10,000.00 $7,725.00 $8,500.00 $30,000.00 $10,074.91 $16,500.00 $5,000.00
5221(C) 2801 TEMPORARY SILT FENCE1,150LF $4.36 $4.07 $4.95 $4.00 $3.69 $4.50 $2.50
6221(F) 0100 TEMPORARY SILT DIKE217LF $20.45 $19.52 $20.95 $13.80 $12.65 $21.00 $15.00
7230(A) 2806 SOLID SLAB SODDING16,720SY $4.25 $3.86 $5.39 $3.57 $3.43 $4.10 $3.80
8233(A) 2817 VEGETATIVE MULCHING6.58AC $2,000.00 $3,038.50 $3,150.00 $1,150.00 $1,054.08 $4,400.00 $4,400.00
9402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E1,850TON $25.00 $22.17 $35.06 $31.25 $25.18 $32.00 $30.00
10501(A) 0313 STRUCTURAL EXCAVATION UNCLASSIFIED77.4CY $31.59 $15.45 $18.00 $23.00 $22.53 $15.00 $20.00
11509(A) 0319 CLASS AA CONCRETE145.1CY $527.00 $398.61 $535.00 $522.50 $550.63 $750.00 $400.00
12509(D) 0325 CLASS C CONCRETE10CY $441.25 $540.75 $300.00 $385.00 $408.19 $250.00 $350.00
13511(A) 0332 REINFORCING STEEL19,102LB $1.10 $1.18 $1.08 $1.04 $0.9400 $1.00 $1.10
14613(A) 0492 24" R.C.PIPE CLASS III78LF $90.00 $77.51 $93.97 $74.18 $89.17 $85.00 $85.00
15613(B) 0689 18" CORR. GALV. STEEL PIPE192LF $35.00 $34.05 $28.00 $33.62 $52.13 $45.00 $30.00
16613(L) 5726 18" PREFAB. CULVERT END SECTION, ROUND8EA $851.03 $448.05 $300.00 $60.00 $802.54 $365.00 $250.00
17613(L) 5730 24" PREFAB. CULVERT END SECTION, ROUND2EA $1,352.03 $1,174.20 $978.72 $327.50 $1,437.29 $1,000.00 $1,500.00
18619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $10,000.00 $7,107.00 $8,500.00 $15,000.00 $10,562.11 $18,000.00 $8,000.00
19623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE87.5LF $20.75 $16.48 $21.50 $18.40 $16.87 $16.00 $25.00
20623(F) 5686 GUARDRAIL ANCHOR UNIT (TYPE D-BF)4EA $1,545.14 $2,575.00 $2,850.00 $2,875.00 $2,635.20 $2,500.00 $2,000.00
21623(G) 8571 GUARDRAIL END TREATMENT (GET)4EA $2,627.99 $1,442.00 $1,850.00 $1,610.00 $1,475.72 $1,400.00 $1,500.00
22624(A) 4281 FENCE-STYLE WWF1,240LF $9.47 $7.00 $6.72 $6.90 $6.32 $6.80 $12.00
23624(C) 4458 FENCE-STYLE SWF (4 BARBED WIRE)1,840LF $5.58 $6.48 $5.60 $5.75 $5.27 $6.30 $6.00
24624(C) 4459 FENCE-STYLE SWF (5 BARBED WIRE)215LF $14.01 $6.59 $7.50 $6.04 $5.53 $6.40 $8.00
25624(D) 4470 GATE, GALVANIZED STEEL1EA $901.23 $1,112.40 $1,250.00 $1,000.00 $843.27 $1,080.00 $2,500.00
26629(A) 4958 MAILBOX INSTALLATION-SINGLE1EA $187.05 $103.00 $125.00 $115.00 $105.41 $100.00 $50.00
27629(C) 4960 MAILBOX1EA $41.54 $51.50 $65.00 $57.50 $52.70 $50.00 $50.00
28880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $15,000.00 $3,399.00 $4,000.00 $5,000.00 $3,478.47 $3,300.00 $4,000.00
29501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON190CY $24.64 $30.90 $14.00 $34.50 $23.59 $15.00 $20.00
30501(F) 6352 GRANULAR BACKFILL76CY $65.56 $72.73 $84.00 $69.00 $59.13 $85.00 $65.00
31503(A) 1311 PRESTRESSED CONCRETE BEAMS (TYPE II)417LF $201.77 $239.75 $234.14 $269.50 $290.20 $240.00 $235.00
32504(B) 1305 SAW-CUT GROOVING346.7SY $7.26 $9.74 $9.00 $6.90 $10.98 $7.80 $8.50
33504(C) 6250 SEALED EXPANSION JOINT33.06LF $290.38 $304.16 $311.77 $13.80 $304.88 $380.00 $350.00
34504(D) 6239 CONCRETE RAIL (TR3)348.2LF $84.48 $81.77 $84.00 $165.00 $97.19 $85.00 $80.00
35506(A) 1322 STRUCTURAL STEEL1,220LB $5.59 $2.70 $4.10 $4.60 $6.45 $3.50 $3.50
36507(A) 6172 WEATHERING STEEL FIXED BEARING ASSEMBLY12EA $1,200.00 $922.91 $750.00 $920.00 $1,497.73 $1,000.00 $850.00
37507(B) 6176 WEATHERING STEEL EXPANSION BEARING ASSEMBLY6EA $2,355.95 $922.91 $750.00 $805.00 $1,497.73 $1,000.00 $850.00
38509(A) 1326 CLASS AA CONCRETE113.2CY $900.00 $712.90 $675.00 $577.50 $652.67 $750.00 $775.00
39509(B) 1328 CLASS A CONCRETE118.6CY $900.00 $712.90 $675.00 $550.00 $767.62 $750.00 $725.00
40511(A) 1332 REINFORCING STEEL54,018LB $1.16 $1.50 $1.10 $1.04 $0.9400 $1.15 $1.10
41514(A) 6010 PILES, FURNISHED (HP 10X42)106LF $38.77 $30.39 $31.08 $46.00 $37.41 $45.00 $55.00
42514(A) 6011 PILES, FURNISHED (HP 12X53)315LF $47.51 $35.76 $34.29 $51.75 $64.61 $55.00 $65.00
43514(B) 6292 PILES, DRIVEN (HP 10X42)106LF $18.04 $15.45 $25.00 $28.75 $20.88 $10.00 $10.00
44514(B) 6294 PILES, DRIVEN (HP 12X53)315LF $29.83 $15.45 $20.00 $28.75 $21.59 $10.00 $10.00
45514(L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00
46516(A) 6094 DRILLED SHAFTS 48" DIAMETER80LF $881.96 $1,008.44 $1,141.56 $1,210.00 $1,393.31 $1,100.00 $250.00
47516(C) 6200 CROSSHOLE SONIC LOGGING2EA $1,798.45 $1,905.50 $2,850.00 $2,300.00 $2,605.32 $2,500.00 $2,500.00
48601(B) 1353 TYPE I-A PLAIN RIPRAP1,194TON $44.09 $44.57 $49.50 $58.50 $37.70 $48.00 $45.00
49601(C) 1355 TYPE I-A FILTER BLANKET241TON $37.77 $35.25 $44.50 $30.50 $26.67 $40.00 $35.00
50613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND60LF $28.94 $22.44 $30.00 $24.00 $20.97 $35.00 $30.00
51613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.32LF $26.67 $22.44 $25.00 $20.00 $24.53 $35.00 $25.00
52619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $20,000.00 $15,450.00 $15,000.00 $10,000.00 $19,715.94 $10,000.00 $15,000.00
53642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $30,000.00 $6,695.00 $14,500.00 $10,000.00 $12,533.70 $10,000.00 $11,000.00
54220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $5,000.00 $2,575.00 $3,500.00 $4,500.00 $2,112.42 $1,275.00 $5,000.00
55641 1552 MOBILIZATION1LSUM $90,000.00 $70,923.32 $82,000.00 $140,625.00 $118,718.11 $96,000.00 $25,000.00