| 10 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$40,000.00 |
$30,000.00 |
$20,000.00 |
$28,351.41 |
$42,700.00 |
$48,500.00 |
$85,260.00 |
| 20 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 19,784 | CY |
$10.00 |
$7.00 |
$11.50 |
$10.99 |
$12.40 |
$13.90 |
$6.09 |
| 30 | 202(D) 0184 |
UNCLASSIFIED BORROW | 200 | CY |
$15.00 |
$15.00 |
$18.00 |
$24.20 |
$25.00 |
$28.00 |
$18.27 |
| 40 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$40,000.00 |
$20,000.00 |
$20,000.00 |
$37,168.59 |
$36,450.00 |
$60,000.00 |
$46,588.50 |
| 50 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,467 | LF |
$3.00 |
$4.00 |
$5.00 |
$3.85 |
$4.00 |
$4.50 |
$3.65 |
| 60 | 221(F) 0100 |
TEMPORARY SILT DIKE | 2,410 | LF |
$15.00 |
$14.00 |
$8.85 |
$16.50 |
$14.00 |
$15.70 |
$18.27 |
| 70 | 230(A) 2806 |
SOLID SLAB SODDING | 32,651 | SY |
$5.50 |
$3.75 |
$3.00 |
$3.58 |
$3.75 |
$4.20 |
$3.65 |
| 80 | 233(A) 2817 |
VEGETATIVE MULCHING | 13.5 | AC |
$1,750.00 |
$1,000.00 |
$1,200.00 |
$1,540.00 |
$1,000.00 |
$1,120.00 |
$1,461.60 |
| 90 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 7,916 | CY |
$65.00 |
$65.00 |
$50.00 |
$55.60 |
$51.00 |
$57.10 |
$57.73 |
| 100 | 307(A) 4200 |
FLY ASH | 1,326 | TON |
$85.00 |
$125.00 |
$95.00 |
$121.00 |
$125.00 |
$86.50 |
$146.16 |
| 110 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 35,054 | SY |
$5.00 |
$2.50 |
$3.00 |
$4.79 |
$2.60 |
$4.00 |
$7.00 |
| 120 | 325 5271 |
SEPARATOR FABRIC | 35,054 | SY |
$1.50 |
$1.50 |
$1.50 |
$2.14 |
$1.78 |
$2.00 |
$2.70 |
| 130 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 2,963 | TON |
$38.50 |
$28.00 |
$31.00 |
$30.23 |
$30.40 |
$34.10 |
$43.85 |
| 140 | 407(B) 0250 |
TACK COAT | 1,956 | GAL |
$3.00 |
$3.50 |
$4.00 |
$3.92 |
$3.25 |
$3.50 |
$4.87 |
| 150 | 408 5774 |
PRIME COAT | 20,512 | GAL |
$4.50 |
$3.50 |
$8.00 |
$4.20 |
$3.25 |
$5.00 |
$8.17 |
| 160 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 4,368 | TON |
$92.00 |
$73.90 |
$95.00 |
$86.91 |
$67.45 |
$95.50 |
$106.07 |
| 170 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 4,654 | TON |
$90.00 |
$85.60 |
$110.00 |
$106.16 |
$78.15 |
$99.50 |
$121.70 |
| 180 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 34 | CY |
$30.00 |
$35.00 |
$35.00 |
$33.00 |
$50.00 |
$5.60 |
$24.36 |
| 190 | 509(A) 0319 |
CLASS AA CONCRETE | 59 | CY |
$500.00 |
$850.00 |
$700.00 |
$579.49 |
$1,050.00 |
$910.00 |
$669.90 |
| 200 | 509(D) 0325 |
CLASS C CONCRETE | 15 | CY |
$400.00 |
$450.00 |
$500.00 |
$385.00 |
$700.00 |
$467.50 |
$365.40 |
| 210 | 511(A) 0332 |
REINFORCING STEEL | 9,796 | LB |
$1.15 |
$1.25 |
$1.30 |
$1.32 |
$1.40 |
$1.00 |
$1.22 |
| 220 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 64 | TON |
$65.00 |
$34.00 |
$60.00 |
$89.65 |
$52.00 |
$58.20 |
$51.16 |
| 230 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 119 | LF |
$85.00 |
$50.00 |
$65.00 |
$87.93 |
$66.00 |
$45.90 |
$57.25 |
| 240 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 80 | LF |
$125.00 |
$60.00 |
$95.00 |
$95.64 |
$96.00 |
$51.50 |
$57.25 |
| 250 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 324 | LF |
$45.00 |
$32.00 |
$35.00 |
$65.63 |
$32.00 |
$42.00 |
$46.29 |
| 260 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 106 | LF |
$40.00 |
$35.00 |
$60.00 |
$59.51 |
$56.00 |
$50.40 |
$53.98 |
| 270 | 613(B) 0692 |
36" CORR. GALV. STEEL PIPE | 48 | LF |
$68.00 |
$60.00 |
$85.00 |
$111.10 |
$86.00 |
$76.20 |
$73.08 |
| 280 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 28 | EA |
$545.00 |
$225.00 |
$300.00 |
$454.73 |
$269.00 |
$280.00 |
$620.00 |
| 290 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 10 | EA |
$800.00 |
$600.00 |
$800.00 |
$1,043.07 |
$730.00 |
$840.00 |
$750.00 |
| 300 | 613(L) 5732 |
30" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$1,200.00 |
$1,100.00 |
$1,300.00 |
$1,729.96 |
$1,270.00 |
$1,344.00 |
$950.00 |
| 310 | 613(L) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$1,500.00 |
$650.00 |
$1,000.00 |
$1,196.06 |
$775.00 |
$2,240.00 |
$1,700.00 |
| 320 | 613(S) 1186 |
STANDARD BEDDING MATERIAL, CLASS B | 78 | CY |
$46.00 |
$34.00 |
$50.00 |
$43.56 |
$49.00 |
$56.00 |
$52.37 |
| 330 | 613(V) 1180 |
TRENCH EXCAVATION | 320 | CY |
$8.00 |
$6.50 |
$15.00 |
$8.47 |
$15.00 |
$33.60 |
$29.23 |
| 340 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$25,000.00 |
$12,250.00 |
$30,000.00 |
$17,719.63 |
$28,544.00 |
$31,970.00 |
$8,526.00 |
| 350 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 275 | LF |
$18.00 |
$23.00 |
$22.00 |
$25.30 |
$21.00 |
$23.50 |
$27.41 |
| 360 | 623(F) 6033 |
GUARDRAIL ANCHOR UNIT (TYPE II) | 2 | EA |
$2,400.00 |
$3,000.00 |
$3,000.00 |
$3,300.00 |
$2,000.00 |
$2,240.00 |
$2,569.98 |
| 370 | 623(F) 8300 |
GUARDRAIL TRAIL END TURNDOWN (31") | 2 | EA |
$1,037.03 |
$1,250.00 |
$1,800.00 |
$1,375.00 |
$1,800.00 |
$2,016.00 |
$2,326.38 |
| 375 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 2 | EA |
$2,777.00 |
$2,989.00 |
$2,525.00 |
$3,287.90 |
$2,525.00 |
$2,828.00 |
$3,075.45 |
| 380 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 5 | EA |
$100.00 |
$95.00 |
$150.00 |
$104.50 |
$150.00 |
$168.00 |
$182.70 |
| 390 | 629(B) 4959 |
MAILBOX INSTALLATION-MULTIPLE | 1 | EA |
$200.00 |
$150.00 |
$225.00 |
$165.00 |
$225.00 |
$252.00 |
$274.05 |
| 400 | 629(C) 4960 |
MAILBOX | 7 | EA |
$45.00 |
$40.00 |
$30.00 |
$44.00 |
$30.00 |
$33.60 |
$36.54 |
| 410 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 7 | EA |
$28.37 |
$5.00 |
$35.00 |
$5.50 |
$35.00 |
$39.20 |
$42.63 |
| 415 | 853 9033 |
DELINEATORS(TYPE 2, CODE 1) | 8 | EA |
$20.00 |
$25.00 |
$15.00 |
$27.50 |
$13.25 |
$14.80 |
$16.14 |
| 420 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 880 | CY |
$15.00 |
$10.00 |
$12.00 |
$3.30 |
$15.00 |
$12.80 |
$7.31 |
| 430 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 105 | CY |
$25.00 |
$20.00 |
$20.00 |
$33.00 |
$25.00 |
$5.60 |
$24.36 |
| 440 | 509(A) 1326 |
CLASS AA CONCRETE | 245 | CY |
$600.00 |
$820.00 |
$625.00 |
$579.49 |
$625.00 |
$677.00 |
$504.66 |
| 450 | 511(A) 1332 |
REINFORCING STEEL | 42,820 | LB |
$1.00 |
$1.25 |
$1.25 |
$1.32 |
$1.40 |
$1.00 |
$1.22 |
| 460 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 60 | TON |
$50.00 |
$34.00 |
$60.00 |
$93.20 |
$45.00 |
$58.20 |
$58.46 |
| 470 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$50,000.00 |
$18,000.00 |
$10,000.00 |
$4,400.00 |
$25,000.00 |
$6,384.00 |
$18,270.00 |
| 480 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 27 | SF |
$26.00 |
$22.00 |
$50.00 |
$24.20 |
$45.00 |
$50.40 |
$56.94 |
| 490 | 851(C) 8324 |
2" SQUARE TUBE POST | 55 | LF |
$10.00 |
$12.00 |
$6.00 |
$13.20 |
$6.00 |
$6.70 |
$9.74 |
| 500 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 37,600 | LF |
$0.6000 |
$0.3700 |
$0.5000 |
$0.4100 |
$0.4300 |
$0.4800 |
$0.5800 |
| 510 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 4,000 | SD |
$0.3300 |
$0.3000 |
$0.3500 |
$0.3300 |
$0.3500 |
$0.3900 |
$0.5500 |
| 520 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,600 | SD |
$0.6600 |
$0.5000 |
$1.00 |
$0.5500 |
$1.00 |
$1.10 |
$1.28 |
| 530 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 1,200 | SD |
$1.00 |
$2.00 |
$2.00 |
$2.20 |
$2.00 |
$2.25 |
$2.56 |
| 540 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 2,000 | SD |
$0.7000 |
$0.3000 |
$1.25 |
$0.3300 |
$1.25 |
$1.40 |
$1.64 |
| 550 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 5,200 | SD |
$0.3300 |
$0.1000 |
$0.2000 |
$0.1100 |
$0.2000 |
$0.2200 |
$0.3000 |
| 560 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$25,000.00 |
$18,000.00 |
$33,000.00 |
$18,394.74 |
$35,000.00 |
$60,000.00 |
$21,924.00 |
| 570 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$6,500.00 |
$4,000.00 |
$3,000.00 |
$5,042.37 |
$10,000.00 |
$7,500.00 |
$5,115.60 |
| 580 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$182,000.00 |
$160,000.00 |
$100,000.00 |
$136,649.98 |
$377,860.00 |
$152,112.20 |
$160,776.00 |