| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$12,500.00 |
$30,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 3,210 | CY |
$10.00 |
$7.00 |
$18.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 4,297 | CY |
$12.00 |
$10.00 |
$30.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$8,000.00 |
$7,500.00 |
$15,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,803 | LF |
$2.00 |
$2.99 |
$2.00 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 203 | LF |
$10.00 |
$18.95 |
$10.75 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 13,339 | SY |
$1.50 |
$6.95 |
$8.00 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 4.19 | AC |
$400.00 |
$5,950.00 |
$9,000.00 |
| 9 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 801 | CY |
$60.00 |
$48.00 |
$55.00 |
| 10 | 310(B) 0149 |
SUBGRADE, METHOD B | 5,060 | SY |
$3.00 |
$2.00 |
$5.50 |
| 11 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 226 | TON |
$40.00 |
$35.00 |
$40.00 |
| 12 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,106 | TON |
$80.00 |
$95.86 |
$100.00 |
| 13 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 548 | TON |
$90.00 |
$107.01 |
$120.00 |
| 14 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 19 | CY |
$60.00 |
$50.00 |
$30.00 |
| 15 | 509(A) 0319 |
CLASS AA CONCRETE | 79 | CY |
$650.00 |
$900.00 |
$800.00 |
| 16 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$400.00 |
$300.00 |
$750.00 |
| 17 | 511(A) 0332 |
REINFORCING STEEL | 11,512 | LB |
$1.50 |
$2.00 |
$1.40 |
| 18 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 56 | TON |
$55.00 |
$60.00 |
$60.00 |
| 19 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 24 | TON |
$50.00 |
$50.00 |
$75.00 |
| 20 | 613(EE) 5610 |
(SP) 18" CORRUGATED POLYPROPYLENE PIPE | 284 | LF |
$40.00 |
$50.00 |
$20.00 |
| 21 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 10 | EA |
$1,150.00 |
$1,700.00 |
$5,000.00 |
| 22 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$5,000.00 |
$20,000.00 |
| 23 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 3,066 | SY |
$4.00 |
$4.00 |
$10.00 |
| 24 | 624(A) 4281 |
FENCE-STYLE WWF | 139 | LF |
$7.00 |
$6.00 |
$10.00 |
| 25 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 1,240 | LF |
$7.00 |
$5.00 |
$5.50 |
| 26 | 624(D) 4470 |
GATE, GALVANIZED STEEL | 1 | EA |
$1,000.00 |
$500.00 |
$2,000.00 |
| 27 | 624(E) 4290 |
FENCE-STYLE CLF (5'HIGH, CLASS A) | 152 | LF |
$25.00 |
$20.00 |
$55.00 |
| 28 | 624(F) 5898 |
GATES-STYLE CLF (5'HIGH X 16'LONG) | 1 | EA |
$1,000.00 |
$1,000.00 |
$2,000.00 |
| 29 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 3 | EA |
$150.00 |
$100.00 |
$100.00 |
| 30 | 629(C) 4960 |
MAILBOX | 3 | EA |
$40.00 |
$30.00 |
$30.00 |
| 31 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 3 | EA |
$25.00 |
$10.00 |
$10.00 |
| 32 | 501(G) 6309 |
CLSM BACKFILL | 290 | CY |
$140.00 |
$125.00 |
$150.00 |
| 33 | 508 6359 |
PRECAST ARCH CULVERT | 117 | LF |
$6,000.00 |
$8,500.00 |
$9,000.00 |
| 34 | 509(A) 1326 |
CLASS AA CONCRETE | 116.3 | CY |
$600.00 |
$800.00 |
$800.00 |
| 35 | 510(A) 6334 |
RETAINING WALL | 183.6 | SY |
$900.00 |
$800.00 |
$700.00 |
| 36 | 511(A) 1332 |
REINFORCING STEEL | 5,780 | LB |
$1.00 |
$4.00 |
$1.40 |
| 37 | 516(A) 6094 |
DRILLED SHAFTS 48" DIAMETER | 132 | LF |
$1,100.00 |
$800.00 |
$2,500.00 |
| 38 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,456 | TON |
$40.00 |
$55.00 |
$60.00 |
| 39 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 186 | TON |
$25.00 |
$45.00 |
$75.00 |
| 40 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$30,000.00 |
$35,000.00 |
| 41 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 275 | LF |
$20.00 |
$18.00 |
$20.00 |
| 42 | 623(F) 8300 |
GUARDRAIL TRAIL END TURNDOWN (31") | 2 | EA |
$800.00 |
$650.00 |
$2,800.00 |
| 43 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 2 | EA |
$2,500.00 |
$2,550.00 |
$1,200.00 |
| 44 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 29 | SF |
$25.00 |
$25.00 |
$29.00 |
| 45 | 851(C) 8324 |
2" SQUARE TUBE POST | 44 | LF |
$9.00 |
$10.00 |
$10.00 |
| 46 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 5,964 | LF |
$0.5000 |
$0.8500 |
$0.8500 |
| 47 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$3,000.00 |
$3,000.00 |
$10,000.00 |
| 48 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,000.00 |
$7,500.00 |
$10,000.00 |
| 49 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$4,000.00 |
$6,000.00 |
| 50 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$105,000.00 |
$162,000.00 |
$100,000.00 |