| 1 | 202(D) 0184 |
UNCLASSIFIED BORROW | 6,680.18 | CY |
$12.00 |
$12.00 |
$11.75 |
| 2 | 221(C) 2801 |
TEMPORARY SILT FENCE | 500 | LF |
$3.85 |
$3.92 |
$4.25 |
| 3 | 221(F) 0100 |
TEMPORARY SILT DIKE | 427 | LF |
$12.43 |
$12.50 |
$13.65 |
| 4 | 230(A) 2806 |
SOLID SLAB SODDING | 47,672.89 | SY |
$4.00 |
$2.23 |
$4.65 |
| 5 | 233(A) 2817 |
VEGETATIVE MULCHING | 9.85 | AC |
$1,964.05 |
$1,250.00 |
$1,375.00 |
| 6 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 1,000 | CY |
$95.00 |
$90.00 |
$100.00 |
| 7 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 837.66 | TON |
$60.00 |
$64.00 |
$46.50 |
| 8 | 407(B) 0250 |
TACK COAT | 10,591.43 | GAL |
$2.75 |
$2.30 |
$5.00 |
| 9 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 15,489.71 | TON |
$105.00 |
$105.00 |
$131.00 |
| 10 | 411(I) 6310 |
SUPERPAVE, TYPE S4(PATCH)(PG64-22OK) | 550 | TON |
$130.00 |
$185.00 |
$270.00 |
| 11 | 413(B) 4862 |
RUMBLE STRIP-METHOD HMA-CYC GROUP | 3 | EAGP |
$682.13 |
$1,275.00 |
$981.00 |
| 12 | 501(G) 6315 |
CLSM BACKFILL | 2.71 | CY |
$495.00 |
$210.00 |
$545.00 |
| 13 | 509(A) 0319 |
CLASS AA CONCRETE | 70.65 | CY |
$700.00 |
$1,410.00 |
$708.00 |
| 14 | 509(D) 0325 |
CLASS C CONCRETE | 20 | CY |
$483.81 |
$420.00 |
$436.00 |
| 15 | 511(A) 0332 |
REINFORCING STEEL | 7,171.78 | LB |
$1.56 |
$1.85 |
$1.60 |
| 16 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 100 | TON |
$55.66 |
$80.00 |
$54.50 |
| 17 | 611(A) 2657 |
MANHOLE (4' DIAMETER) | 3 | EA |
$3,502.48 |
$14,980.00 |
$10,900.00 |
| 18 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 160 | LF |
$122.12 |
$120.00 |
$119.90 |
| 19 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 960 | LF |
$38.00 |
$26.00 |
$36.00 |
| 20 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 84 | LF |
$44.76 |
$33.60 |
$60.00 |
| 21 | 613(EE) 5630 |
(SP) 30" CORRUGATED POLYPROPYLENE PIPE | 85 | LF |
$135.00 |
$94.00 |
$136.25 |
| 22 | 613(EE) 5640 |
(SP) 36" CORRUGATED POLYPROPYLENE PIPE | 210 | LF |
$100.00 |
$118.25 |
$163.50 |
| 23 | 613(L) 4515 |
28" X 18" PREFAB. CULVERT END SECTION, ARCH | 4 | EA |
$1,037.08 |
$1,440.00 |
$1,090.00 |
| 24 | 613(M) 7150 |
TYPE A3 CULVERT END TREATMENT | 40 | EA |
$1,300.00 |
$1,210.00 |
$1,308.00 |
| 25 | 613(M) 7151 |
TYPE B3 CULVERT END TREATMENT | 8 | EA |
$1,600.00 |
$1,495.00 |
$1,635.00 |
| 26 | 613(M) 7152 |
TYPE C3 CULVERT END TREATMENT | 2 | EA |
$2,500.00 |
$1,850.00 |
$2,561.00 |
| 27 | 613(M) 7153 |
TYPE D3 CULVERT END TREATMENT | 4 | EA |
$2,700.00 |
$2,265.00 |
$2,780.00 |
| 28 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$15,365.22 |
$22,000.00 |
$16,350.00 |
| 29 | 619(C) 0924 |
SAWING PAVEMENT | 102 | LF |
$6.87 |
$2.00 |
$8.75 |
| 30 | 624(C) 7181 |
FENCE-STYLE SWF (6 BARBED WIRE) | 714 | LF |
$7.55 |
$10.00 |
$16.50 |
| 31 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 97.3 | SF |
$21.49 |
$52.00 |
$54.50 |
| 32 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 57,988 | LF |
$0.4200 |
$0.3600 |
$0.3000 |
| 33 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$17,070.81 |
$22,500.00 |
$16,350.00 |
| 34 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,000.00 |
$37,200.00 |
$30,656.00 |
| 35 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,550.00 |
$5,000.00 |
$8,850.00 |
| 36 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$150,000.00 |
$160,000.00 |
$252,230.00 |