| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 2,000 | CY |
$10.00 |
$17.90 |
| 2 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,000 | CY |
$15.00 |
$19.30 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,000.00 |
$16,096.85 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 5,000 | LF |
$3.00 |
$4.25 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 7,000 | SY |
$4.00 |
$8.00 |
| 6 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 2,115 | CY |
$50.00 |
$56.60 |
| 7 | 326(A) 0100 |
GEOTEXTILE REINFORCEMENT | 6,150 | SY |
$3.50 |
$5.80 |
| 8 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,025 | TON |
$35.00 |
$35.70 |
| 9 | 407(D) 0401 |
(SP) NT TACK MATERIAL | 1,400 | GAL |
$5.00 |
$3.40 |
| 10 | 411(B) 5935 |
SUPERPAVE, TYPE S3(PG 76-28 OK) | 775 | TON |
$100.00 |
$113.15 |
| 11 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 2,300 | TON |
$105.00 |
$104.95 |
| 12 | 412 5267 |
COLD MILLING PAVEMENT | 8,600 | SY |
$6.00 |
$5.20 |
| 13 | 609(B) 1513 |
1'-8" COMB. CURB & GUTTER (6" BARRIER) | 400 | LF |
$30.00 |
$61.80 |
| 14 | 613(J) 5915 |
EDGE DRAIN CONDUIT-PERFORATED | 400 | LF |
$20.00 |
$28.85 |
| 15 | 613(K) 5916 |
EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 30 | LF |
$20.00 |
$30.90 |
| 16 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 2 | EA |
$500.00 |
$1,030.00 |
| 17 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 2,500 | SY |
$8.00 |
$11.55 |
| 18 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 610 | LF |
$5.00 |
$8.25 |
| 19 | 619(C) 0924 |
SAWING PAVEMENT | 6,050 | LF |
$5.00 |
$4.15 |
| 20 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 400 | LF |
$25.00 |
$28.60 |
| 21 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$3,000.00 |
$3,296.00 |
| 22 | 853 9066 |
GUARDRAIL DELINEATORS(TYPE 1, CODE 1) | 14 | EA |
$18.00 |
$22.70 |
| 23 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 15 | EA |
$250.00 |
$257.50 |
| 24 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 14,000 | LF |
$1.00 |
$1.00 |
| 25 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 3,000 | LF |
$1.00 |
$2.10 |
| 26 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 65 | LF |
$10.00 |
$8.25 |
| 27 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 6 | EA |
$250.00 |
$154.50 |
| 28 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 10,000 | LF |
$0.2500 |
$0.3000 |
| 29 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 10,000 | LF |
$0.5000 |
$0.3000 |
| 30 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$10,000.00 |
$11,845.00 |
| 31 | 880(M) 8325 |
(PL)SPEED MONITORING DEVICE | 150 | SD |
$25.00 |
$25.75 |
| 32 | 882(A) 8303 |
PORTABLE CHANGEABLE MESSAGE SIGN | 2 | EA |
$20,000.00 |
$19,211.00 |
| 33 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$75,000.00 |
$65,435.00 |