Bid tab 210171

Let Jun 17, 2021 · Division 5 · Dewey Sign up free

‹ Jun 2021 results

BRIDGE AND APPROACHES SH-34: OVER CANADIAN RIVER, 10.5 MILES SOUTH OF THE US-60/SH-51 JUNCTION NEAR CAMARGO. PROJECT LENGTH = 1.344 MILES

Let date
Thursday, June 17, 2021
Contract
210171
J/P numbers
30333(04)
District
Division 5
County
Dewey
Highway
Limits
BRIDGE AND APPROACHES SH-34: OVER CANADIAN RIVER, 10.5 MILES SOUTH OF THE US-60/SH-51 JUNCTION NEAR CAMARGO. PROJECT LENGTH = 1.344 MILES
Project number
STP-222B(039)PM

Bidders 7

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$17,975,395
1 Frontier Bridge, Inc. Low bidder $14,927,181 -17.0%
2 SEWELL BROS., INC. $15,555,584 -13.5% +4.2%
3 OBC, INC. $16,811,003 -6.5% +12.6%
4 MANHATTAN ROAD & BRIDGE COMPANY, LLC $17,892,370 -0.5% +19.9%
5 H & H Bridge Company/Crossland Const. Co. $18,959,178 +5.5% +27.0%
6 K & R BUILDERS, INC. $19,597,149 +9.0% +31.3%
7 HASKELL LEMON CONSTRUCTION CO. $19,791,823 +10.1% +32.6%

Bid tab: unit prices 96 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 Frontier Bridge…#2 SEWELL BROS., I…#3 OBC, INC.#4 MANHATTAN ROAD …#5 H & H Bridge Co…#6 K & R BUILDERS,…#7 HASKELL LEMON C…
10201(A) 0102 CLEARING AND GRUBBING1LSUM $30,000.00 $25,500.00 $30,000.00 $34,000.00 $170,000.00 $50,000.00 $115,000.00 $326,380.00
20202(A) 0183 UNCLASSIFIED EXCAVATION19,561CY $7.00 $5.71 $5.00 $7.00 $5.25 $7.00 $7.00 $6.10
30202(B) 0105 MUCK EXCAVATION1,311CY $20.00 $6.12 $12.00 $12.00 $13.00 $15.00 $8.00 $6.45
40202(D) 0184 UNCLASSIFIED BORROW131,862CY $8.00 $5.71 $6.00 $7.30 $6.00 $9.00 $7.40 $6.10
50205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $25,000.00 $10,200.00 $21,500.00 $30,000.00 $28,100.00 $50,000.00 $35,500.00 $81,405.00
60221(C) 2801 TEMPORARY SILT FENCE7,427LF $3.00 $2.67 $4.25 $4.14 $4.00 $3.89 $3.89 $3.10
70221(F) 0100 TEMPORARY SILT DIKE462LF $7.00 $8.73 $22.00 $21.45 $21.00 $20.14 $20.14 $20.70
80221(K) 0600 TEMPORARY FIBER LOG462LF $10.00 $10.20 $7.85 $7.60 $7.25 $7.14 $7.14 $8.25
90229 4318 DITCH LINER PROTECTION729LF $3.00 $2.04 $2.30 $2.24 $2.75 $2.10 $2.31 $2.05
100230(A) 2806 SOLID SLAB SODDING74,153SY $3.00 $1.90 $2.38 $2.24 $2.15 $2.10 $2.31 $4.15
110233(A) 2817 VEGETATIVE MULCHING15.34AC $400.00 $408.00 $1,099.00 $1,063.93 $1,025.00 $999.00 $999.00 $1,548.00
120241 2832 MOWING30.68AC $90.00 $102.00 $93.00 $90.53 $90.00 $85.00 $85.00 $103.00
130307(K) 4300 STABILIZED SUBGRADE32,951SY $9.00 $6.38 $7.00 $6.66 $6.75 $6.25 $7.00 $6.45
140402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E740TON $40.00 $34.94 $43.00 $51.00 $38.00 $39.00 $41.50 $35.50
150407(B) 0250 TACK COAT6,648GAL $5.00 $4.59 $4.75 $4.46 $4.65 $4.50 $4.20 $4.35
160408 5774 PRIME COAT12,615GAL $7.00 $5.61 $5.75 $0.5000 $5.50 $5.50 $6.40 $6.55
170411(B) 5935 SUPERPAVE, TYPE S3(PG 76-28 OK)2,241TON $75.00 $92.82 $97.00 $89.10 $94.00 $91.00 $92.00 $86.40
180411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)12,871TON $80.00 $83.64 $86.00 $88.38 $85.00 $82.00 $92.00 $85.70
190411(C) 5950 SUPERPAVE, TYPE S4(PG 76-28 OK)1,935TON $95.00 $96.90 $101.00 $94.47 $98.00 $95.00 $98.00 $91.60
200411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)2,000TON $80.00 $86.70 $91.00 $106.66 $88.00 $85.00 $110.00 $103.50
210412 5267 COLD MILLING PAVEMENT4,149SY $6.00 $3.30 $7.35 $6.02 $7.25 $7.00 $7.00 $5.60
220509(D) 0325 CLASS C CONCRETE115CY $400.00 $219.38 $425.00 $750.00 $300.00 $300.00 $375.00 $396.50
230613(B) 0689 18" CORR. GALV. STEEL PIPE374LF $30.00 $45.90 $40.00 $50.00 $44.00 $30.00 $40.00 $30.90
240613(B) 0690 24" CORR. GALV. STEEL PIPE180LF $40.00 $59.16 $43.00 $65.00 $54.00 $40.00 $54.00 $43.90
250613(B) 0693 42" CORR. GALV. STEEL PIPE132LF $55.00 $79.56 $64.00 $100.00 $83.00 $60.00 $75.00 $82.80
260613(B) 4530 42" X 29" CORR. GALV. STEEL PIPE ARCH132LF $65.00 $107.10 $100.00 $100.00 $87.00 $65.00 $75.00 $85.00
270613(M) 7196 TYPE A6 CULVERT END TREATMENT4EA $1,500.00 $1,378.59 $3,300.00 $2,400.00 $1,100.00 $1,500.00 $1,355.00 $1,286.00
280613(M) 7197 TYPE B6 CULVERT END TREATMENT6EA $1,300.00 $1,777.27 $3,750.00 $2,600.00 $1,400.00 $1,500.00 $2,420.00 $1,915.00
290613(M) 7204 TYPE DD6 CULVERT END TREATMENT4EA $2,000.00 $4,893.99 $7,825.00 $7,000.00 $4,500.00 $3,000.00 $9,300.00 $3,977.00
300619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $15,000.00 $25,627.01 $12,000.00 $20,000.00 $12,250.00 $10,000.00 $16,500.00 $74,660.00
310619(B) 4728 REMOVAL OF ASPHALT PAVEMENT24,165SY $5.00 $3.88 $6.30 $4.53 $6.25 $6.65 $6.50 $8.30
320619(C) 0924 SAWING PAVEMENT1,207LF $5.00 $5.16 $5.00 $5.00 $5.35 $5.00 $5.55 $5.45
330623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE350LF $20.00 $22.44 $24.00 $23.43 $22.50 $20.00 $24.20 $30.50
340623(G) 8590 GUARDRAIL END TREATMENT (31")4EA $2,200.00 $2,856.00 $3,080.00 $2,982.00 $2,850.00 $2,525.00 $3,080.00 $3,097.00
350623(I) 8700 GUARDRAIL BRIDGE CONN-THRIE BEAM (31")4EA $19,000.00 $2,295.00 $2,475.00 $2,396.25 $3,150.00 $2,400.00 $2,475.00 $2,736.00
360624(A) 4281 FENCE-STYLE WWF439LF $8.00 $8.16 $12.00 $8.52 $11.00 $11.00 $11.00 $10.50
370624(B) 4467 GATES-STYLE WWF (4.5'HIGH X 18' LONG)2EA $1,000.00 $1,530.00 $1,100.00 $1,597.50 $1,300.00 $1,000.00 $1,375.00 $1,290.00
380624(C) 4459 FENCE-STYLE SWF (5 BARBED WIRE)649LF $6.00 $7.14 $11.00 $7.46 $8.75 $10.00 $10.00 $8.65
390501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON222CY $14.00 $25.02 $10.00 $30.00 $75.00 $10.00 $12.50 $27.40
400501(G) 6309 CLSM BACKFILL327.4CY $200.00 $138.85 $160.00 $190.00 $165.00 $175.00 $184.35 $171.50
410503(A) 6290 PRESTRESSED CONCRETE BEAMS (TYPE J BT)10,773.36LF $280.00 $255.23 $261.00 $250.00 $295.00 $300.00 $267.00 $256.50
420504(A) 1304 APPROACH SLAB281.2SY $300.00 $262.40 $275.00 $270.00 $285.00 $175.00 $274.00 $270.00
430504(B) 1305 SAW-CUT GROOVING9,875SY $4.00 $3.26 $3.50 $3.41 $3.30 $3.20 $3.52 $3.30
440504(C) 6250 SEALED EXPANSION JOINT345.34LF $300.00 $238.28 $325.00 $300.00 $310.00 $10.00 $310.00 $297.00
450504(D) 6245 CONCRETE RAIL (TR4)4,443.4LF $85.00 $90.46 $85.00 $60.00 $62.00 $40.00 $93.00 $101.50
460506(A) 1322 STRUCTURAL STEEL20,640LB $3.00 $2.54 $2.50 $3.00 $2.50 $1.00 $3.00 $2.75
470507(A) 6170 STAINLESS STEEL FIXED BEARING ASSEMBLY80EA $2,000.00 $1,892.08 $2,000.00 $2,500.00 $2,800.00 $1,000.00 $2,335.00 $2,442.00
480507(B) 6174 STAINLESS STEEL EXPANSION BEARING ASSEMBLY80EA $2,000.00 $1,892.08 $2,000.00 $2,500.00 $2,800.00 $1,000.00 $2,335.00 $2,442.00
490509(A) 1326 CLASS AA CONCRETE2,793.2CY $600.00 $508.38 $450.00 $520.00 $600.00 $500.00 $620.00 $574.00
500509(B) 1328 CLASS A CONCRETE970.7CY $650.00 $466.86 $500.00 $550.00 $850.00 $1,000.00 $645.00 $558.50
510509(D) 1331 CLASS C CONCRETE38.9CY $400.00 $644.37 $425.00 $1,150.00 $575.00 $400.00 $655.00 $453.00
520511(A) 1332 REINFORCING STEEL6,870LB $1.00 $1.01 $1.00 $1.20 $1.50 $1.00 $1.27 $1.10
530511(B) 6010 EPOXY COATED REINFORCING STEEL852,750LB $1.10 $1.15 $1.20 $1.25 $1.50 $1.60 $1.40 $1.15
540513(B) 6019 CLASS B BRIDGE DECK REPAIR200SY $350.00 $229.42 $275.00 $468.60 $260.00 $440.00 $462.00 $125.00
550513(C) 6020 CLASS C BRIDGE DECK REPAIR200SY $500.00 $320.63 $350.00 $684.80 $315.00 $643.00 $675.00 $200.00
560514(A) 6010 PILES, FURNISHED (HP 10X42)322LF $35.00 $38.30 $35.00 $45.00 $45.00 $36.00 $37.10 $48.30
570514(A) 6011 PILES, FURNISHED (HP 12X53)1,646LF $40.00 $48.19 $45.00 $50.00 $58.00 $44.00 $43.40 $51.10
580514(B) 6292 PILES, DRIVEN (HP 10X42)322LF $15.00 $17.25 $15.00 $28.00 $11.00 $5.00 $15.90 $25.50
590514(B) 6294 PILES, DRIVEN (HP 12X53)1,646LF $15.00 $11.25 $15.00 $28.00 $11.00 $9.00 $18.60 $12.50
600514(L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00
610515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)9,643SY $3.50 $3.47 $3.50 $3.62 $3.50 $3.40 $3.74 $3.50
620516(A) 6098 DRILLED SHAFTS 72" DIAMETER4,059LF $1,100.00 $869.57 $900.00 $1,100.00 $1,125.00 $1,339.50 $1,355.00 $1,584.00
630516(C) 6200 CROSSHOLE SONIC LOGGING8EA $4,000.00 $4,337.50 $4,000.00 $3,993.75 $4,000.00 $20,000.00 $2,450.00 $5,445.00
640523(A) 6550 SEALER CRACK PREPARATION286LF $5.00 $4.08 $4.00 $4.26 $4.20 $4.00 $4.00 $4.15
650523(B) 6560 SEALER RESIN3.5GAL $150.00 $153.00 $200.00 $159.75 $155.00 $150.00 $150.00 $155.00
660601(B) 1353 TYPE I-A PLAIN RIPRAP4,130TON $55.00 $54.85 $55.00 $55.00 $59.00 $52.00 $60.75 $53.60
670601(C) 1355 TYPE I-A FILTER BLANKET820TON $45.00 $45.48 $45.00 $45.00 $47.00 $42.00 $45.50 $39.90
680613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND86LF $35.00 $20.47 $30.00 $30.00 $27.00 $75.00 $30.00 $84.00
690613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.50LF $35.00 $16.92 $35.00 $30.00 $27.00 $75.00 $30.00 $38.10
700619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $700,000.00 $46,441.23 $400,000.00 $348,800.00 $36,500.00 $275,000.00 $725,000.00 $402,250.00
710623 0100 (PL)GUARDRAIL CURBING4EA $1,200.00 $1,213.86 $1,000.00 $1,600.00 $1,200.00 $500.00 $1,750.00 $3,262.00
720626(A) 1257 MONUMENTS2EA $5,000.00 $7,406.65 $2,000.00 $8,000.00 $1,500.00 $7,500.00 $7,250.00 $1,957.00
730857(A) 8839 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE)13,512LF $0.5000 $0.1400 $0.1600 $0.1500 $0.1600 $0.2100 $0.1600 $0.4600
740857(C) 8851 REMOVABLE PAVEMENT MARKING TAPE(4" WIDE)500LF $2.00 $1.02 $1.05 $1.07 $1.05 $6.00 $1.10 $2.05
750857(E) 8890 (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2500EA $2.00 $1.02 $1.05 $1.07 $1.05 $1.25 $1.20 $1.05
760857(F) 8006 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE)13,512LF $0.5000 $0.1200 $0.1400 $0.1300 $0.1300 $0.4400 $0.1400 $0.2600
770880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF7,200SD $0.5000 $0.1000 $0.1200 $0.1100 $0.1100 $0.7500 $0.1100 $0.3600
780880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF4,320SD $1.00 $0.2600 $0.2700 $0.2700 $0.2700 $0.7500 $0.2800 $1.05
790880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF4,320SD $2.00 $0.2600 $0.2700 $0.2700 $0.2700 $0.7500 $0.2800 $2.05
800880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)1,440SD $1.00 $2.55 $2.65 $2.66 $2.60 $5.00 $2.75 $1.55
810880(C) 8848 WING BARRICADES720SD $0.7000 $0.1000 $0.1400 $0.1100 $0.1100 $0.0200 $0.1100 $3.10
820880(E) 8860 WARNING LIGHTS(TYPE A)3,600SD $0.5000 $2.04 $2.10 $2.13 $2.10 $0.3500 $2.20 $0.1000
830880(F) 8878 DRUMS5,400SD $0.3000 $0.1000 $0.1200 $0.1100 $0.1100 $0.5000 $0.1100 $0.3600
840880(G) 8890 CHANNELIZER CONES24,570SD $0.3000 $0.1000 $0.1200 $0.1100 $0.1100 $0.2500 $0.1100 $0.3600
850882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN748SD $15.00 $13.26 $15.00 $13.85 $13.35 $12.00 $14.30 $15.50
860413(A) 4870 RUMBLE STRIP-CENTERLINE HMA-CON5,994LF $0.4000 $0.4100 $0.8000 $0.4300 $0.5000 $0.5200 $0.4400 $0.8800
870413(B) 4863 RUMBLE STRIP-METHOD HMA-CYC11,987LF $0.8000 $0.2800 $0.5500 $0.2900 $0.3500 $0.3500 $0.3000 $0.8800
880805(A) 8724 (PL)REMOVAL OF EXISTING SIGNS10EA $70.00 $51.00 $55.00 $53.25 $100.00 $95.00 $55.00 $51.60
890805(D) 8756 (PL)REMOVE & RESET EXISTING SIGNS1EA $120.00 $357.00 $400.00 $372.75 $365.00 $250.00 $367.50 $258.00
900850(A) 8110 SHEET ALUMINUM SIGNS56SF $25.00 $20.40 $21.00 $21.30 $21.00 $39.00 $22.00 $18.60
910851(C) 8324 2" SQUARE TUBE POST84LF $15.00 $10.20 $12.00 $10.65 $11.00 $8.00 $11.00 $10.30
920853 9069 GUARDRAIL DELINEATORS(TYPE 2, CODE 1)14EA $20.00 $12.24 $14.00 $12.78 $12.50 $13.25 $13.20 $25.80
930855(A) 8812 TRAFFIC STRIPE(PLASTIC)(4" WIDE)21,367LF $0.6000 $0.5100 $0.5200 $0.5300 $0.5500 $0.4400 $0.5500 $0.6700
940642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $100,000.00 $51,000.00 $50,000.00 $53,250.00 $81,000.00 $46,500.00 $75,000.00 $127,800.00
950220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $7,000.00 $3,587.50 $5,000.00 $6,000.00 $1,909.32 $3,000.00 $10,000.00 $15,325.00
960641 1399 MOBILIZATION1LSUM $755,000.00 $667,310.62 $500,000.00 $498,000.00 $775,000.00 $900,000.00 $845,500.00 $874,520.00