| 1 | 407(D) 0401 |
(SP) NT TACK MATERIAL | 6,800 | GAL |
$5.00 |
$3.05 |
$0.0100 |
$5.84 |
| 2 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 9,500 | TON |
$85.00 |
$68.25 |
$74.80 |
$107.35 |
| 3 | 412 5267 |
COLD MILLING PAVEMENT | 81,200 | SY |
$4.00 |
$1.55 |
$1.10 |
$1.65 |
| 4 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 109,600 | LF |
$0.5000 |
$0.2600 |
$0.4000 |
$0.2900 |
| 5 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 500 | LF |
$2.00 |
$1.00 |
$0.5500 |
$1.10 |
| 6 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 850 | LF |
$3.00 |
$2.00 |
$1.60 |
$2.20 |
| 7 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 13 | EA |
$200.00 |
$150.00 |
$215.00 |
$165.00 |
| 8 | 858(A) 8914 |
PAVEMENT MARKERS CLASS A TYPE 2-D | 600 | EA |
$3.00 |
$6.10 |
$5.35 |
$6.60 |
| 9 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$15,000.00 |
$11,000.00 |
$3,500.00 |
$4,400.00 |
| 10 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$75,000.00 |
$49,230.00 |
$73,000.00 |
$65,169.78 |