| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$15,868.76 |
$15,000.00 |
$15,000.00 |
$10,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 117 | CY |
$16.33 |
$23.60 |
$60.00 |
$50.00 |
$100.00 |
| 3 | 202(E) 0186 |
SELECT BORROW | 117 | CY |
$21.80 |
$33.39 |
$70.00 |
$50.00 |
$100.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,000.00 |
$15,870.12 |
$30,000.00 |
$75,000.00 |
$5,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,000 | LF |
$1.74 |
$1.87 |
$4.25 |
$5.00 |
$5.00 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 5,239 | SY |
$2.39 |
$2.25 |
$4.25 |
$5.00 |
$5.00 |
| 7 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 92 | CY |
$75.04 |
$91.53 |
$133.90 |
$100.00 |
$135.00 |
| 8 | 307(J) 4290 |
MODIFIED SUBGRADE | 5,069 | SY |
$4.95 |
$9.88 |
$10.20 |
$11.00 |
$18.00 |
| 9 | 407(D) 0401 |
(SP) NT TACK MATERIAL | 4,645 | GAL |
$3.14 |
$4.25 |
$3.30 |
$5.00 |
$7.25 |
| 10 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 729 | TON |
$90.79 |
$95.85 |
$99.00 |
$88.00 |
$120.00 |
| 11 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 3,469 | TON |
$91.13 |
$97.15 |
$89.50 |
$108.00 |
$113.00 |
| 12 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 3,469 | TON |
$80.53 |
$77.73 |
$73.75 |
$92.00 |
$104.00 |
| 13 | 411(H) 6210 |
SUPERPAVE, TYPE S3(PATCH)(PG64-22OK) | 407 | TON |
$96.92 |
$129.90 |
$124.75 |
$135.00 |
$260.00 |
| 14 | 412 5267 |
COLD MILLING PAVEMENT | 30,970 | SY |
$2.95 |
$3.92 |
$3.20 |
$2.70 |
$4.30 |
| 15 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 4,392 | SY |
$27.26 |
$23.38 |
$24.00 |
$50.00 |
$39.00 |
| 16 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 1,209 | CY |
$153.11 |
$164.10 |
$145.00 |
$170.00 |
$169.00 |
| 17 | 509(C) 0322 |
CLASS A CONCRETE, SMALL STRUCTURES | 20 | CY |
$1,082.28 |
$103.72 |
$501.60 |
$800.00 |
$1,300.00 |
| 18 | 510(C) 6134 |
SLOPE WALL (4") | 8 | SY |
$111.31 |
$252.28 |
$336.55 |
$150.00 |
$450.00 |
| 19 | 602(B) 5860 |
REVETMENT MATTRESSES | 22 | SY |
$55.00 |
$145.60 |
$111.80 |
$350.00 |
$92.00 |
| 20 | 609(A) 0300 |
CONCRETE CURB (6" BARRIER-INTEGRAL) | 1,436 | LF |
$10.48 |
$8.72 |
$6.00 |
$30.00 |
$13.00 |
| 21 | 609(B) 1513 |
1'-8" COMB. CURB & GUTTER (6" BARRIER) | 1,348 | LF |
$19.32 |
$31.55 |
$21.95 |
$35.00 |
$35.00 |
| 22 | 610(A) 0602 |
4" CONCRETE SIDEWALK | 3,461 | SY |
$55.49 |
$55.67 |
$74.85 |
$55.00 |
$64.50 |
| 23 | 610(B) 0399 |
6" CONCRETE DRIVEWAY (H.E.S.) | 92 | SY |
$57.74 |
$74.12 |
$119.05 |
$100.00 |
$135.00 |
| 24 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 733 | SY |
$64.60 |
$59.80 |
$82.75 |
$100.00 |
$89.00 |
| 25 | 610(C) 0609 |
6" CONCRETE DIVIDING STRIP | 44 | SY |
$68.41 |
$80.56 |
$104.20 |
$100.00 |
$245.00 |
| 26 | 610(I) 4610 |
TACTILE WARNING DEVICE-NEW | 250 | SF |
$29.51 |
$28.55 |
$15.70 |
$20.00 |
$38.00 |
| 27 | 611(G) 5101 |
INLET CI DES. 1 (A) | 1 | EA |
$4,725.00 |
$2,935.60 |
$3,727.45 |
$2,600.00 |
$3,800.00 |
| 28 | 611(G) 5112 |
INLET CI DES. 2 (STD) | 2 | EA |
$3,987.82 |
$3,370.42 |
$4,233.30 |
$3,300.00 |
$4,350.00 |
| 29 | 611(G) 5113 |
INLET CI DES. 2 (B) | 8 | EA |
$4,801.64 |
$4,240.55 |
$5,218.45 |
$4,300.00 |
$5,350.00 |
| 30 | 611(G) 5115 |
INLET CI DES. 2 (D) | 2 | EA |
$5,591.97 |
$5,216.18 |
$6,709.40 |
$5,100.00 |
$6,400.00 |
| 31 | 611(H) 5325 |
ADD'L DEPTH IN INLET CI DES. 2 | 28.4 | VF |
$334.92 |
$320.42 |
$255.60 |
$1,100.00 |
$535.00 |
| 32 | 611(L) 0487 |
JUNCTION BOXES | 742 | CF |
$66.23 |
$69.11 |
$64.95 |
$55.00 |
$89.00 |
| 33 | 612(A) 0641 |
MANHOLES ADJUST TO GRADE | 5 | EA |
$821.92 |
$639.39 |
$1,065.00 |
$750.00 |
$1,300.00 |
| 34 | 612(C) 0645 |
INLET ADJUST TO GRADE | 1 | EA |
$1,000.00 |
$1,201.52 |
$1,491.00 |
$450.00 |
$1,525.00 |
| 35 | 612(E) 0647 |
VALVE BOXES ADJUST TO GRADE | 5 | EA |
$371.76 |
$293.43 |
$798.75 |
$1,900.00 |
$765.00 |
| 36 | 612(F) 0648 |
METER BOXES ADJUST TO GRADE | 5 | EA |
$236.47 |
$362.08 |
$798.75 |
$650.00 |
$915.00 |
| 37 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 250 | LF |
$67.41 |
$102.68 |
$170.40 |
$150.00 |
$160.00 |
| 38 | 613(EE) 5610 |
(SP) 18" CORRUGATED POLYPROPYLENE PIPE | 20 | LF |
$83.50 |
$57.04 |
$94.40 |
$85.00 |
$112.00 |
| 39 | 613(EE) 5620 |
(SP) 24" CORRUGATED POLYPROPYLENE PIPE | 500 | LF |
$84.20 |
$60.60 |
$79.85 |
$70.00 |
$125.00 |
| 40 | 613(EE) 5630 |
(SP) 30" CORRUGATED POLYPROPYLENE PIPE | 475 | LF |
$85.00 |
$85.56 |
$90.50 |
$95.00 |
$142.00 |
| 41 | 613(EE) 5640 |
(SP) 36" CORRUGATED POLYPROPYLENE PIPE | 400 | LF |
$86.40 |
$99.28 |
$109.70 |
$100.00 |
$162.00 |
| 42 | 613(EE) 5650 |
(SP) 42" CORRUGATED POLYPROPYLENE PIPE | 260 | LF |
$96.50 |
$110.95 |
$133.10 |
$130.00 |
$180.00 |
| 43 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$690.44 |
$800.58 |
$1,214.10 |
$1,100.00 |
$1,100.00 |
| 44 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 3 | EA |
$1,294.53 |
$961.76 |
$1,059.65 |
$4,000.00 |
$1,300.00 |
| 45 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$24,334.59 |
$22,863.02 |
$45,000.00 |
$25,000.00 |
$11,000.00 |
| 46 | 619(B) 0291 |
REMOVAL OF HEADWALL | 2 | EA |
$2,094.31 |
$2,286.31 |
$1,600.00 |
$1,100.00 |
$2,500.00 |
| 47 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 111 | SY |
$16.59 |
$11.32 |
$33.00 |
$25.00 |
$36.00 |
| 48 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 395 | SY |
$12.75 |
$7.55 |
$25.00 |
$10.00 |
$36.00 |
| 49 | 619(B) 4741 |
REMOVAL OF DRAINAGE INLETS | 1 | EA |
$479.27 |
$685.93 |
$2,500.00 |
$1,100.00 |
$1,900.00 |
| 50 | 619(B) 4763 |
REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY | 4,194 | SY |
$17.78 |
$14.65 |
$16.00 |
$25.00 |
$17.00 |
| 51 | 619(B) 4766 |
REMOVAL OF CONCRETE DRIVEWAY | 1,237 | SY |
$11.18 |
$15.10 |
$26.00 |
$23.00 |
$19.00 |
| 52 | 619(B) 4767 |
REMOVAL OF ASPHALT DRIVEWAY | 32 | SY |
$17.28 |
$15.07 |
$46.00 |
$20.00 |
$23.00 |
| 53 | 619(B) 4775 |
REMOVAL OF CONCRETE CURB OPENING | 34 | SY |
$12.00 |
$15.08 |
$19.00 |
$17.00 |
$49.00 |
| 54 | 619(B) 4791 |
REMOVAL OF CURB | 871 | LF |
$7.65 |
$3.78 |
$15.00 |
$17.00 |
$15.00 |
| 55 | 619(B) 4792 |
REMOVAL OF SIDEWALK | 238 | SY |
$15.29 |
$15.10 |
$16.00 |
$25.00 |
$32.00 |
| 56 | 619(B) 5150 |
REMOVAL OF BRICK CHATTER MEDIAN | 109 | SY |
$17.30 |
$15.11 |
$21.00 |
$25.00 |
$46.00 |
| 57 | 619(B) 5918 |
REMOVAL OF EXISTING PIPE | 20 | LF |
$9.77 |
$22.86 |
$96.00 |
$40.00 |
$80.00 |
| 58 | 619(B) 6068 |
REMOVAL OF EXISTING RETAINING WALL | 5 | LF |
$83.75 |
$137.19 |
$110.00 |
$1,100.00 |
$250.00 |
| 59 | 619(B) 6132 |
REMOVAL OF 6" CONCRETE DIVIDING STRIP | 38 | SY |
$16.67 |
$15.05 |
$30.00 |
$25.00 |
$50.00 |
| 60 | 619(C) 0924 |
SAWING PAVEMENT | 500 | LF |
$5.48 |
$4.51 |
$2.70 |
$8.00 |
$7.50 |
| 61 | 622(A) 4445 |
2" PIPE RAILING | 25 | LF |
$100.00 |
$277.70 |
$390.00 |
$120.00 |
$190.00 |
| 62 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 1 | EA |
$105.82 |
$217.63 |
$213.00 |
$500.00 |
$380.00 |
| 63 | 629(C) 4960 |
MAILBOX | 1 | EA |
$40.60 |
$108.81 |
$106.50 |
$500.00 |
$45.00 |
| 64 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 2 | EA |
$143.34 |
$217.63 |
$266.25 |
$500.00 |
$130.00 |
| 65 | 802(B) 8344 |
3" PVC SCH.40 PLASTIC CONDUIT BORED | 140 | LF |
$29.40 |
$48.97 |
$79.85 |
$50.00 |
$102.00 |
| 66 | 803(A) 8065 |
PULL BOX(SIZE I) | 1 | EA |
$549.92 |
$821.55 |
$1,065.00 |
$800.00 |
$1,350.00 |
| 67 | 804(A) 2915 |
STRUCTURAL CONCRETE | 1.35 | CY |
$583.52 |
$1,904.24 |
$1,597.50 |
$1,800.00 |
$2,200.00 |
| 68 | 804(B) 2916 |
REINFORCING STEEL | 130.2 | LB |
$2.52 |
$3.26 |
$2.15 |
$4.00 |
$3.00 |
| 69 | 805(A) 8704 |
REMOVAL OF PULL BOX | 6 | EA |
$114.93 |
$92.49 |
$213.00 |
$90.00 |
$270.00 |
| 70 | 805(B) 8728 |
(PL)RESET OF PULL BOX | 4 | EA |
$775.71 |
$544.07 |
$319.50 |
$600.00 |
$400.00 |
| 71 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 5 | EA |
$218.99 |
$136.02 |
$133.10 |
$150.00 |
$190.00 |
| 72 | 806(B) 8894 |
10' MTG.HT.TS PED.POLE(G.STL.) | 3 | EA |
$1,115.75 |
$1,207.84 |
$1,065.00 |
$1,200.00 |
$1,400.00 |
| 73 | 809(A) 8090 |
ROADWAY LUMINAIRE | 5 | EA |
$875.02 |
$1,686.62 |
$692.25 |
$1,600.00 |
$900.00 |
| 74 | 825(A) 8559 |
SIGNAL SYSTEM CONTROLLER UPGRADE | 3 | EA |
$1,118.13 |
$21,218.73 |
$7,987.40 |
$22,000.00 |
$10,000.00 |
| 75 | 828 8132 |
(PL)DETECTION SYSTEM (VIDEO) | 1 | LSUM |
$67,729.35 |
$117,519.12 |
$71,673.50 |
$120,000.00 |
$91,000.00 |
| 76 | 830 8000 |
PEDESTRIAN PUSH BUTTON | 12 | EA |
$1,128.66 |
$1,572.36 |
$2,129.95 |
$1,600.00 |
$2,700.00 |
| 77 | 831 8280 |
1WAY 4SEC. ADJ. SIG. HD.S-13 | 20 | EA |
$837.83 |
$1,022.85 |
$852.00 |
$1,000.00 |
$1,100.00 |
| 78 | 831 8295 |
1WAY 2SEC. ADJ. PED. SIG. HD. S-20 | 12 | EA |
$565.22 |
$669.21 |
$532.50 |
$700.00 |
$675.00 |
| 79 | 833 3030 |
BACKPLATE | 20 | EA |
$365.35 |
$217.63 |
$159.75 |
$225.00 |
$200.00 |
| 80 | 834(A) 8207 |
5/C TRAFFIC SIGNAL ELECTRICAL CABLE | 50 | LF |
$2.15 |
$21.76 |
$21.30 |
$25.00 |
$25.00 |
| 81 | 834(B) 8220 |
2/C SHIELDED LOOP DETECTOR LEAD-IN CABLE | 90 | LF |
$2.13 |
$10.88 |
$5.30 |
$12.00 |
$13.00 |
| 82 | 840(B) 8593 |
E.P.S. OPTICAL DETECTOR | 4 | EA |
$948.94 |
$1,085.96 |
$1,597.50 |
$1,250.00 |
$2,000.00 |
| 83 | 840(C) 8594 |
E.P.S. OPTICAL DETECTOR CABLE | 1,020 | LF |
$1.78 |
$3.26 |
$2.15 |
$3.50 |
$3.00 |
| 84 | 840(D) 8595 |
E.P.S. 2 CHANNEL PHASE SELECTOR | 2 | EA |
$1,944.83 |
$3,808.49 |
$3,461.20 |
$4,000.00 |
$4,500.00 |
| 85 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 77 | SF |
$25.14 |
$15.23 |
$14.90 |
$45.00 |
$25.00 |
| 86 | 850(C) 8118 |
MAST ARM MOUNTED SIGNS(ALUMINUM) | 7.5 | SF |
$54.98 |
$63.11 |
$106.50 |
$70.00 |
$74.00 |
| 87 | 851(B) 3216 |
2"@3.65 GALV.STEEL PIPE POST | 36 | LF |
$24.07 |
$17.41 |
$17.05 |
$20.00 |
$20.00 |
| 88 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 15,733 | LF |
$0.7500 |
$0.7400 |
$0.7200 |
$0.7500 |
$1.25 |
| 89 | 855(A) 8814 |
TRAFFIC STRIPE(PLASTIC)(8" WIDE) | 192 | LF |
$2.31 |
$2.18 |
$2.15 |
$2.25 |
$2.00 |
| 90 | 855(A) 8818 |
TRAFFIC STRIPE(PLASTIC)(12" WIDE) | 760 | LF |
$2.41 |
$2.18 |
$2.15 |
$3.50 |
$3.80 |
| 91 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 62 | LF |
$7.40 |
$5.44 |
$5.35 |
$13.00 |
$11.00 |
| 92 | 855(B) 8818 |
TRAFFIC STRIPE(PLASTIC)(ARROWS) | 10 | EA |
$102.79 |
$163.22 |
$159.75 |
$180.00 |
$190.00 |
| 93 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 6,112 | LF |
$1.25 |
$1.36 |
$1.35 |
$1.00 |
$1.25 |
| 94 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 2,048 | LF |
$1.10 |
$2.18 |
$2.15 |
$2.25 |
$2.50 |
| 95 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 50 | LF |
$4.00 |
$5.44 |
$5.35 |
$3.50 |
$4.00 |
| 96 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 384 | LF |
$7.09 |
$3.26 |
$3.20 |
$9.00 |
$7.00 |
| 97 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 37 | EA |
$188.95 |
$136.02 |
$133.10 |
$150.00 |
$160.00 |
| 98 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 10,000 | LF |
$0.3000 |
$0.2200 |
$0.2100 |
$0.6000 |
$0.5000 |
| 99 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 60 | EA |
$0.4900 |
$1.09 |
$1.05 |
$1.20 |
$2.00 |
| 100 | 857(E) 8890 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | 1,180 | EA |
$0.9100 |
$1.09 |
$1.05 |
$1.20 |
$2.00 |
| 101 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 8,001 | LF |
$0.5000 |
$0.1400 |
$0.1400 |
$1.00 |
$0.6500 |
| 102 | 857(F) 8007 |
PAVEMENT MARKING REMOVAL(ARROWS) | 22 | EA |
$30.36 |
$27.20 |
$26.60 |
$90.00 |
$100.00 |
| 103 | 857(F) 8008 |
PAVEMENT MARKING REMOVAL(WORDS) | 9 | EA |
$47.56 |
$27.20 |
$26.60 |
$90.00 |
$100.00 |
| 104 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 480 | SD |
$3.65 |
$1.09 |
$1.05 |
$9.00 |
$10.00 |
| 105 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 5,770 | SD |
$0.1900 |
$0.5400 |
$0.5300 |
$0.2500 |
$0.3000 |
| 106 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,424 | SD |
$0.7600 |
$0.4400 |
$0.4300 |
$0.7500 |
$0.7500 |
| 107 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 1,440 | SD |
$1.09 |
$5.44 |
$5.30 |
$1.00 |
$1.00 |
| 108 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 1,494 | SD |
$0.8600 |
$1.09 |
$1.05 |
$1.00 |
$1.00 |
| 109 | 880(C) 8848 |
WING BARRICADES | 2,400 | SD |
$0.4400 |
$0.1100 |
$0.1100 |
$0.3000 |
$0.1000 |
| 110 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 5,640 | SD |
$0.3800 |
$0.2700 |
$0.2700 |
$0.2500 |
$0.2000 |
| 111 | 880(F) 8878 |
DRUMS | 5,640 | SD |
$0.2900 |
$0.1100 |
$0.1100 |
$0.6000 |
$0.6500 |
| 112 | 880(G) 8890 |
CHANNELIZER CONES | 35,400 | SD |
$0.2300 |
$0.1100 |
$0.1100 |
$0.1000 |
$0.1500 |
| 113 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 480 | SD |
$10.44 |
$16.32 |
$15.95 |
$15.00 |
$12.00 |
| 114 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$13,310.05 |
$36,771.17 |
$65,000.00 |
$40,000.00 |
$27,500.00 |
| 115 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,923.46 |
$4,955.64 |
$24,500.00 |
$20,000.00 |
$7,500.00 |
| 116 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$92,951.24 |
$153,272.21 |
$158,355.63 |
$140,000.00 |
$188,000.00 |