| 1 | 407(C) 0301 |
(SP) POLYMER MODIFIED CATIONIC RAPID SET - 1S | 35,560 | GAL |
$3.00 |
$2.10 |
$3.30 |
| 2 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 21,981 | TON |
$80.00 |
$104.80 |
$118.50 |
| 3 | 412 5267 |
COLD MILLING PAVEMENT | 5,759 | SY |
$4.50 |
$4.50 |
$5.20 |
| 4 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 3,275 | LF |
$4.00 |
$5.63 |
$6.75 |
| 5 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 2,900 | LF |
$17.00 |
$19.88 |
$23.90 |
| 6 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 28 | EA |
$2,100.00 |
$4,400.00 |
$5,279.00 |
| 7 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 70 | LF |
$7.00 |
$6.00 |
$7.20 |
| 8 | 855(A) 8840 |
TRAFFIC STRIPE(PLASTIC)(THIN LINE)(4" WIDE) | 138,000 | LF |
$0.4000 |
$0.3400 |
$0.4100 |
| 9 | 855(B) 8818 |
TRAFFIC STRIPE(PLASTIC)(ARROWS) | 2 | EA |
$130.00 |
$95.00 |
$114.00 |
| 10 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$7,500.00 |
$45,715.00 |