| 1 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 230 | CY |
$125.00 |
$28.00 |
$48.10 |
$50.00 |
$72.77 |
| 2 | 311(B) 0152 |
PROCESSING EXISTING BASE & SURFACE, METHOD B | 2,775 | LF |
$11.00 |
$4.70 |
$7.10 |
$2.00 |
$11.72 |
| 3 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 500 | TON |
$45.00 |
$25.50 |
$24.05 |
$25.00 |
$41.78 |
| 4 | 407(B) 0250 |
TACK COAT | 1,400 | GAL |
$5.00 |
$0.0100 |
$2.85 |
$2.00 |
$4.02 |
| 5 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,200 | TON |
$92.00 |
$64.90 |
$68.70 |
$80.00 |
$93.17 |
| 6 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 2,100 | TON |
$95.00 |
$85.90 |
$86.85 |
$110.00 |
$122.62 |
| 7 | 411(H) 6210 |
SUPERPAVE, TYPE S3(PATCH)(PG64-22OK) | 30 | TON |
$350.00 |
$423.05 |
$162.85 |
$90.00 |
$383.93 |
| 8 | 412 5267 |
COLD MILLING PAVEMENT | 11,550 | SY |
$6.00 |
$1.30 |
$0.8000 |
$2.00 |
$1.72 |
| 9 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 14,600 | LF |
$0.8000 |
$0.5500 |
$0.6000 |
$0.5400 |
$0.6600 |
| 10 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$10,000.00 |
$11,500.00 |
$10,000.00 |
$4,000.00 |
$14,002.50 |
| 11 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$50,000.00 |
$10,000.00 |
$27,000.00 |
$18,000.00 |
$30,744.77 |