| 1 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 295 | CY |
$45.00 |
$40.00 |
$25.00 |
$60.00 |
| 2 | 407(A) 4659 |
FOG SEAL | 798 | GAL |
$3.00 |
$1.90 |
$3.00 |
$3.10 |
| 3 | 407(B) 0250 |
TACK COAT | 4,350 | GAL |
$2.50 |
$1.90 |
$2.00 |
$2.00 |
| 4 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 6,539 | TON |
$68.00 |
$71.75 |
$65.00 |
$77.00 |
| 5 | 411(H) 6210 |
SUPERPAVE, TYPE S3(PATCH)(PG64-22OK) | 446 | TON |
$58.00 |
$60.00 |
$55.00 |
$105.00 |
| 6 | 412 5267 |
COLD MILLING PAVEMENT | 58,000 | SY |
$3.00 |
$1.00 |
$1.30 |
$1.25 |
| 7 | 413(B) 4862 |
RUMBLE STRIP-METHOD HMA-CYC GROUP | 3 | EAGP |
$800.00 |
$1,700.00 |
$805.00 |
$775.00 |
| 8 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 63,900 | LF |
$0.8500 |
$0.3500 |
$0.3500 |
$0.3500 |
| 9 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 284 | LF |
$6.00 |
$1.00 |
$1.00 |
$1.05 |
| 10 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$15,000.00 |
$10,200.00 |
$17,352.00 |
$2,650.00 |
| 11 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$20,000.00 |
$15,536.55 |
$57,150.00 |
$41,782.00 |