| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$30,000.00 |
$53,000.00 |
$21,600.00 |
$30,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 12,376 | CY |
$8.00 |
$8.50 |
$7.50 |
$14.00 |
$8.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 2,188 | CY |
$15.00 |
$16.50 |
$12.00 |
$19.15 |
$15.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,000.00 |
$27,500.00 |
$15,000.00 |
$23,650.00 |
$27,500.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 10,778 | LF |
$3.00 |
$2.99 |
$2.99 |
$1.90 |
$2.99 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 910 | LF |
$10.00 |
$18.95 |
$18.95 |
$6.25 |
$18.95 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 32,896 | SY |
$2.00 |
$3.95 |
$3.95 |
$3.45 |
$3.95 |
| 8 | 232(B) 2814 |
SEEDING METHOD B | 10.46 | AC |
$1,200.00 |
$2,750.00 |
$800.00 |
$3,505.00 |
$2,750.00 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 10.46 | AC |
$400.00 |
$2,250.00 |
$400.00 |
$2,867.00 |
$2,250.00 |
| 10 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 6,073 | TON |
$25.00 |
$25.61 |
$26.00 |
$26.25 |
$25.61 |
| 11 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$300.00 |
$150.00 |
$250.00 |
$446.10 |
$400.00 |
| 12 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 919 | TON |
$40.00 |
$43.84 |
$48.00 |
$66.65 |
$43.84 |
| 13 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 919 | TON |
$30.00 |
$28.41 |
$35.00 |
$82.00 |
$28.41 |
| 14 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 46 | LF |
$80.00 |
$85.00 |
$95.00 |
$71.50 |
$85.00 |
| 15 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 160 | LF |
$30.00 |
$56.00 |
$55.00 |
$49.75 |
$56.00 |
| 16 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 404 | LF |
$40.00 |
$58.12 |
$45.00 |
$51.75 |
$58.12 |
| 17 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$1,250.00 |
$1,000.00 |
$750.00 |
$811.35 |
$927.50 |
| 18 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 22 | EA |
$1,400.00 |
$2,000.00 |
$1,500.00 |
$769.60 |
$2,000.00 |
| 19 | 613(T) 1187 |
STANDARD BEDDING MATERIAL, CLASS C | 27 | CY |
$50.00 |
$75.28 |
$75.00 |
$56.20 |
$75.28 |
| 20 | 613(V) 1180 |
TRENCH EXCAVATION | 18 | CY |
$10.00 |
$20.00 |
$15.00 |
$16.90 |
$20.00 |
| 21 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$10,000.00 |
$5,000.00 |
$12,750.00 |
$12,500.00 |
| 22 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 200 | CY |
$15.00 |
$100.00 |
$15.00 |
$15.30 |
$60.00 |
| 23 | 501(G) 6309 |
CLSM BACKFILL | 88 | CY |
$120.00 |
$250.00 |
$150.00 |
$424.15 |
$185.00 |
| 24 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 627 | LF |
$230.00 |
$175.00 |
$220.00 |
$227.75 |
$400.00 |
| 25 | 504(C) 6250 |
SEALED EXPANSION JOINT | 33 | LF |
$250.00 |
$10.00 |
$380.00 |
$172.00 |
$300.00 |
| 26 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 493.4 | LF |
$80.00 |
$50.00 |
$85.00 |
$86.75 |
$150.00 |
| 27 | 506(A) 1322 |
STRUCTURAL STEEL | 1,320 | LB |
$3.00 |
$1.00 |
$3.00 |
$2.55 |
$10.00 |
| 28 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 6 | EA |
$1,200.00 |
$2,000.00 |
$900.00 |
$611.80 |
$1,000.00 |
| 29 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 12 | EA |
$1,200.00 |
$2,000.00 |
$900.00 |
$688.25 |
$1,000.00 |
| 30 | 509(A) 1326 |
CLASS AA CONCRETE | 165.8 | CY |
$650.00 |
$500.00 |
$625.00 |
$451.05 |
$600.00 |
| 31 | 509(B) 1328 |
CLASS A CONCRETE | 128.2 | CY |
$660.00 |
$700.00 |
$625.00 |
$466.70 |
$600.00 |
| 32 | 511(A) 1332 |
REINFORCING STEEL | 68,670 | LB |
$1.00 |
$0.8500 |
$1.05 |
$0.8500 |
$1.00 |
| 33 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 130 | LF |
$30.00 |
$27.00 |
$42.00 |
$37.40 |
$35.00 |
| 34 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 290 | LF |
$35.00 |
$33.00 |
$52.00 |
$39.55 |
$42.00 |
| 35 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 130 | LF |
$10.00 |
$5.00 |
$10.00 |
$20.90 |
$17.50 |
| 36 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 290 | LF |
$10.00 |
$5.00 |
$10.00 |
$20.90 |
$21.00 |
| 37 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 38 | 516(A) 6094 |
DRILLED SHAFTS 48" DIAMETER | 56 | LF |
$700.00 |
$1,200.00 |
$1,300.00 |
$961.65 |
$1,200.00 |
| 39 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$3,000.00 |
$1,500.00 |
$3,200.00 |
$3,250.00 |
$7,500.00 |
| 40 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,776 | TON |
$35.00 |
$38.24 |
$47.00 |
$65.40 |
$50.00 |
| 41 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 410 | TON |
$30.00 |
$30.42 |
$34.00 |
$74.00 |
$40.00 |
| 42 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 60 | LF |
$40.00 |
$65.00 |
$25.00 |
$14.45 |
$60.00 |
| 43 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 40 | LF |
$35.00 |
$75.00 |
$25.00 |
$14.10 |
$60.00 |
| 44 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$20,000.00 |
$15,000.00 |
$20,000.00 |
$18,625.00 |
$12,250.00 |
| 45 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,800.00 |
$1,175.00 |
$2,100.00 |
$2,230.50 |
$1,175.00 |
| 46 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 50 | LF |
$20.00 |
$20.00 |
$24.00 |
$25.50 |
$20.00 |
| 47 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,500.00 |
$2,500.00 |
$2,275.00 |
$3,568.85 |
$2,500.00 |
| 48 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$3,250.00 |
$2,800.00 |
$4,142.50 |
$3,250.00 |
| 49 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$8,900.00 |
$23,959.00 |
$16,950.00 |
$8,900.00 |
| 50 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$1,000.00 |
$1,275.00 |
$4,461.00 |
$3,000.00 |
| 51 | 640(A) 1398 |
FIELD OFFICE | 1 | EA |
$8,500.00 |
$2,500.00 |
$2,000.00 |
$637.30 |
$5,000.00 |
| 52 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$83,787.00 |
$100,000.00 |
$102,000.00 |
$23,585.00 |
$102,900.00 |