Bid tab 200201

Let May 14, 2020 · Division 7 · Murray Sign up free

‹ May 2020 results

BRIDGE AND APPROACHES COUNTY ROAD (DRAKE ROAD/EW-1805): OVER OIL CREEK , 0.4 MILES WEST OF THE US -177 JUNCTION NEAR MILL CREEK . PROJECT LENGTH = 0.208 MILE

Let date
Thursday, May 14, 2020
Contract
200201
J/P numbers
29391(04)
District
Division 7
County
Murray
Highway
Limits
BRIDGE AND APPROACHES COUNTY ROAD (DRAKE ROAD/EW-1805): OVER OIL CREEK , 0.4 MILES WEST OF THE US -177 JUNCTION NEAR MILL CREEK . PROJECT LENGTH = 0.208 MILE
Project number
STP-250D(027)CI

Bidders 10

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$1,166,686
1 Redlands Contracting, LLC Low bidder $984,333 -15.6%
2 Treas Construction Inc $1,024,578 -12.2% +4.1%
3 Silver Star Construction Company, Inc. $1,111,900 -4.7% +13.0%
4 BRIDGECO CONTRACTORS, INC. $1,117,277 -4.2% +13.5%
5 Wyatt Contracting $1,178,645 +1.0% +19.7%
6 KLAVER CONSTRUCTION COMPANY, INC. $1,192,316 +2.2% +21.1%
7 HUB Construction, Inc. $1,205,768 +3.3% +22.5%
8 Built Right Construction, LLC $1,298,104 +11.3% +31.9%
9 BREWER CONSTRUCTION OKLAHOMA, LLC $1,314,028 +12.6% +33.5%
10 DOWNEY CONTRACTING, LLC $1,394,139 +19.5% +41.6%

Bid tab: unit prices 46 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 Redlands Contra…#2 Treas Construct…#3 Silver Star Con…#4 BRIDGECO CONTRA…#5 Wyatt Contracti…#6 KLAVER CONSTRUC…#7 HUB Constructio…#8 Built Right Con…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $20,000.00 $12,430.00 $7,725.00 $35,800.00 $23,805.00 $27,300.00 $20,000.00 $6,500.00 $12,000.00
2202(A) 0183 UNCLASSIFIED EXCAVATION3,982CY $10.00 $10.85 $4.12 $14.00 $10.35 $15.75 $9.85 $9.22 $12.00
3202(D) 0184 UNCLASSIFIED BORROW99CY $18.00 $19.80 $15.45 $1.00 $25.00 $63.00 $18.00 $20.00 $18.00
4205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $10,000.00 $6,950.00 $4,377.50 $35,000.00 $7,245.00 $15,750.00 $6,300.00 $5,000.00 $7,500.00
5221(C) 2801 TEMPORARY SILT FENCE730LF $5.00 $3.20 $2.98 $3.00 $4.00 $3.03 $2.89 $7.00 $5.00
6221(F) 0100 TEMPORARY SILT DIKE294LF $18.00 $10.90 $10.17 $10.00 $11.00 $22.97 $9.88 $13.00 $10.00
7221(G) 0152 TEMPORARY ROCK FILTER DAM TYPE 353CY $125.00 $54.00 $128.75 $172.00 $87.00 $125.00 $125.00 $125.00 $160.00
8230(A) 2806 SOLID SLAB SODDING12,603SY $3.50 $2.70 $2.57 $2.60 $2.85 $3.13 $2.49 $4.00 $5.00
9233(A) 2817 VEGETATIVE MULCHING2.6AC $1,500.00 $1,250.00 $1,223.64 $1,240.00 $1,300.00 $2,087.40 $1,188.00 $800.00 $5,000.00
10241 2832 MOWING5.21AC $125.00 $520.00 $509.85 $510.00 $600.00 $519.75 $495.00 $500.00 $900.00
11303(A) 2100 AGGREGATE BASE TYPE A718CY $60.00 $61.00 $55.00 $48.00 $57.60 $65.10 $59.60 $65.00 $56.00
12307(K) 4300 STABILIZED SUBGRADE4,428SY $7.00 $8.30 $7.83 $7.00 $8.10 $7.35 $9.05 $12.00 $12.00
13325 5271 SEPARATOR FABRIC5,455SY $1.50 $1.25 $1.13 $1.00 $1.50 $4.20 $1.40 $4.00 $2.95
14402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E535TON $35.00 $30.00 $29.74 $29.00 $30.00 $43.05 $30.65 $35.00 $30.00
15407(B) 0250 TACK COAT243GAL $4.50 $3.50 $3.09 $3.00 $10.00 $6.30 $2.85 $3.50 $4.00
16408 5774 PRIME COAT2,608GAL $6.50 $1.25 $4.12 $3.00 $5.00 $7.35 $4.60 $5.30 $6.00
17411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)735TON $115.00 $104.50 $91.67 $79.00 $119.15 $131.25 $96.70 $128.00 $120.00
18411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)362TON $130.00 $118.00 $109.18 $94.30 $116.60 $157.50 $105.40 $145.00 $125.00
19509(C) 0322 CLASS A CONCRETE, SMALL STRUCTURES1.73CY $1,000.00 $650.00 $772.50 $1,270.00 $3,000.00 $1,500.00 $2,000.00 $1,200.00 $1,350.00
20601(A) 0297 TYPE I PLAIN RIPRAP669TON $55.00 $49.00 $33.74 $53.00 $48.40 $55.00 $44.00 $47.00 $50.00
21611(L) 0487 JUNCTION BOXES146CF $100.00 $54.00 $95.53 $105.00 $123.30 $150.00 $110.00 $125.00 $100.00
22613(A) 0492 24" R.C.PIPE CLASS III70LF $75.00 $68.00 $82.04 $125.00 $82.50 $65.00 $75.00 $80.00 $85.00
23613(A) 4434 73" X 45" R.C.PIPE ARCH CLASS A-III104LF $400.00 $325.00 $377.24 $679.00 $566.50 $330.00 $515.00 $269.05 $550.00
24613(A) 4500 58" X 36" R.C.PIPE ARCH CLASS A-III62LF $250.00 $225.00 $238.70 $366.00 $327.80 $280.00 $298.00 $211.39 $300.00
25613(B) 4527 21" X 15" CORR. GALV. STEEL PIPE ARCH44LF $40.00 $41.00 $59.58 $32.00 $31.90 $45.00 $29.00 $50.00 $40.00
26613(L) 4559 73" X 45" PREFAB. CULVERT END SECTION, ARCH4EA $6,500.00 $5,925.00 $7,004.00 $2,610.00 $9,658.00 $8,000.00 $8,780.00 $6,300.00 $9,500.00
27613(L) 5730 24" PREFAB. CULVERT END SECTION, ROUND2EA $800.00 $1,200.00 $875.50 $2,089.00 $1,072.50 $1,000.00 $975.00 $1,200.00 $1,500.00
28613(M) 7186 TYPE A4 CULVERT END TREATMENT2EA $1,500.00 $1,040.00 $1,493.50 $1,045.00 $2,500.00 $2,000.00 $1,500.00 $1,500.00 $2,000.00
29613(M) 7189 TYPE D4 CULVERT END TREATMENT1EA $2,500.00 $3,200.00 $2,703.75 $2,089.00 $2,800.00 $3,500.00 $2,000.00 $2,735.00 $3,000.00
30619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $15,000.00 $10,800.00 $3,244.50 $30,000.00 $10,800.00 $13,500.00 $15,000.00 $7,000.00 $12,000.00
31619(B) 4728 REMOVAL OF ASPHALT PAVEMENT2,180SY $7.50 $7.25 $5.15 $2.00 $7.35 $8.00 $7.20 $8.00 $10.00
32624(C) 4459 FENCE-STYLE SWF (5 BARBED WIRE)1,893LF $7.00 $10.00 $8.24 $5.50 $6.00 $8.19 $20.00 $9.00 $7.00
33629(A) 4958 MAILBOX INSTALLATION-SINGLE2EA $150.00 $450.00 $103.00 $235.00 $250.00 $105.00 $100.00 $122.59 $200.00
34202(A) 1301 UNCLASSIFIED EXCAVATION980CY $12.00 $12.00 $29.87 $16.00 $12.00 $10.00 $9.85 $7.74 $18.00
35501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON245CY $17.00 $40.00 $30.90 $26.00 $18.00 $30.00 $5.00 $18.69 $20.00
36509(A) 1326 CLASS AA CONCRETE540.9CY $600.00 $410.00 $558.40 $470.00 $460.00 $481.80 $623.14 $650.00 $550.00
37511(A) 1332 REINFORCING STEEL102,560LB $1.00 $1.16 $1.10 $1.15 $1.10 $1.00 $0.9000 $1.10 $1.50
38619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $35,000.00 $15,000.00 $13,081.00 $20,000.00 $29,000.00 $9,000.00 $30,000.00 $12,000.00 $12,000.00
39850(A) 8110 SHEET ALUMINUM SIGNS13.68SF $28.00 $28.60 $18.54 $27.20 $60.00 $18.90 $18.00 $22.07 $50.00
40851(C) 8324 2" SQUARE TUBE POST30LF $11.00 $8.00 $10.30 $7.30 $15.00 $10.50 $10.00 $12.26 $12.00
41855(A) 8812 TRAFFIC STRIPE(PLASTIC)(4" WIDE)2,643LF $2.60 $1.45 $1.54 $1.40 $1.75 $1.58 $1.50 $1.84 $2.00
42855(A) 8825 TRAFFIC STRIPE(PLASTIC)(24" WIDE)13LF $15.00 $16.50 $10.30 $16.00 $15.00 $10.50 $10.00 $12.26 $12.00
43880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $5,000.00 $5,150.00 $6,180.00 $10,500.00 $7,300.00 $6,300.00 $6,000.00 $7,355.37 $7,500.00
44642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $10,800.00 $5,800.00 $5,150.00 $13,160.00 $9,200.00 $8,400.00 $5,000.00 $8,000.00 $10,000.00
45220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $4,000.00 $7,500.00 $2,575.00 $12,500.00 $4,000.00 $5,500.00 $5,500.00 $3,000.00 $3,500.00
46641 1399 MOBILIZATION1LSUM $79,400.00 $70,000.00 $80,254.36 $69,808.60 $80,000.00 $82,000.00 $117,779.46 $95,000.00 $115,000.00

Showing the first 8 bidders. The Excel and CSV downloads include all 10.