‹ May 2020 results
BRIDGE AND APPROACHES COUNTY ROAD (DRAKE ROAD/EW-1805): OVER OIL CREEK , 0.4 MILES WEST OF THE US -177 JUNCTION NEAR MILL CREEK . PROJECT LENGTH = 0.208 MILE
Let date Thursday, May 14, 2020
Contract 200201
J/P numbers 29391(04) District Division 7
County Murray
Highway
Limits BRIDGE AND APPROACHES COUNTY ROAD (DRAKE ROAD/EW-1805): OVER OIL CREEK , 0.4 MILES WEST OF THE US -177 JUNCTION NEAR MILL CREEK . PROJECT LENGTH = 0.208 MILE Project number STP-250D(027)CI
Bidders 10
# Contractor Total bid vs estimate vs low
EE Engineer's estimate $1,166,686
1
Redlands Contracting, LLC Low bidder
$984,333
-15.6%
2
Treas Construction Inc
$1,024,578
-12.2%
+4.1%
3
Silver Star Construction Company, Inc.
$1,111,900
-4.7%
+13.0%
4
BRIDGECO CONTRACTORS, INC.
$1,117,277
-4.2%
+13.5%
5
Wyatt Contracting
$1,178,645
+1.0%
+19.7%
6
KLAVER CONSTRUCTION COMPANY, INC.
$1,192,316
+2.2%
+21.1%
7
HUB Construction, Inc.
$1,205,768
+3.3%
+22.5%
8
Built Right Construction, LLC
$1,298,104
+11.3%
+31.9%
9
BREWER CONSTRUCTION OKLAHOMA, LLC
$1,314,028
+12.6%
+33.5%
10
DOWNEY CONTRACTING, LLC
$1,394,139
+19.5%
+41.6%
Bid tab: unit prices 46 items ExcelCSV Print
Seq Bid code Description Qty Unit Estimate
#1 Redlands Contra… #2 Treas Construct… #3 Silver Star Con… #4 BRIDGECO CONTRA… #5 Wyatt Contracti… #6 KLAVER CONSTRUC… #7 HUB Constructio… #8 Built Right Con…
1 201(A) 0102
CLEARING AND GRUBBING 1 LSUM
$20,000.00
$12,430.00
$7,725.00
$35,800.00
$23,805.00
$27,300.00
$20,000.00
$6,500.00
$12,000.00
2 202(A) 0183
UNCLASSIFIED EXCAVATION 3,982 CY
$10.00
$10.85
$4.12
$14.00
$10.35
$15.75
$9.85
$9.22
$12.00
3 202(D) 0184
UNCLASSIFIED BORROW 99 CY
$18.00
$19.80
$15.45
$1.00
$25.00
$63.00
$18.00
$20.00
$18.00
4 205(A) 4229
TYPE A-SALVAGED TOPSOIL 1 LSUM
$10,000.00
$6,950.00
$4,377.50
$35,000.00
$7,245.00
$15,750.00
$6,300.00
$5,000.00
$7,500.00
5 221(C) 2801
TEMPORARY SILT FENCE 730 LF
$5.00
$3.20
$2.98
$3.00
$4.00
$3.03
$2.89
$7.00
$5.00
6 221(F) 0100
TEMPORARY SILT DIKE 294 LF
$18.00
$10.90
$10.17
$10.00
$11.00
$22.97
$9.88
$13.00
$10.00
7 221(G) 0152
TEMPORARY ROCK FILTER DAM TYPE 3 53 CY
$125.00
$54.00
$128.75
$172.00
$87.00
$125.00
$125.00
$125.00
$160.00
8 230(A) 2806
SOLID SLAB SODDING 12,603 SY
$3.50
$2.70
$2.57
$2.60
$2.85
$3.13
$2.49
$4.00
$5.00
9 233(A) 2817
VEGETATIVE MULCHING 2.6 AC
$1,500.00
$1,250.00
$1,223.64
$1,240.00
$1,300.00
$2,087.40
$1,188.00
$800.00
$5,000.00
10 241 2832
MOWING 5.21 AC
$125.00
$520.00
$509.85
$510.00
$600.00
$519.75
$495.00
$500.00
$900.00
11 303(A) 2100
AGGREGATE BASE TYPE A 718 CY
$60.00
$61.00
$55.00
$48.00
$57.60
$65.10
$59.60
$65.00
$56.00
12 307(K) 4300
STABILIZED SUBGRADE 4,428 SY
$7.00
$8.30
$7.83
$7.00
$8.10
$7.35
$9.05
$12.00
$12.00
13 325 5271
SEPARATOR FABRIC 5,455 SY
$1.50
$1.25
$1.13
$1.00
$1.50
$4.20
$1.40
$4.00
$2.95
14 402(E) 0225
TRAFFIC BOUND SURFACE COURSE TYPE E 535 TON
$35.00
$30.00
$29.74
$29.00
$30.00
$43.05
$30.65
$35.00
$30.00
15 407(B) 0250
TACK COAT 243 GAL
$4.50
$3.50
$3.09
$3.00
$10.00
$6.30
$2.85
$3.50
$4.00
16 408 5774
PRIME COAT 2,608 GAL
$6.50
$1.25
$4.12
$3.00
$5.00
$7.35
$4.60
$5.30
$6.00
17 411(B) 5945
SUPERPAVE, TYPE S3(PG 64-22 OK) 735 TON
$115.00
$104.50
$91.67
$79.00
$119.15
$131.25
$96.70
$128.00
$120.00
18 411(C) 5960
SUPERPAVE, TYPE S4(PG 64-22 OK) 362 TON
$130.00
$118.00
$109.18
$94.30
$116.60
$157.50
$105.40
$145.00
$125.00
19 509(C) 0322
CLASS A CONCRETE, SMALL STRUCTURES 1.73 CY
$1,000.00
$650.00
$772.50
$1,270.00
$3,000.00
$1,500.00
$2,000.00
$1,200.00
$1,350.00
20 601(A) 0297
TYPE I PLAIN RIPRAP 669 TON
$55.00
$49.00
$33.74
$53.00
$48.40
$55.00
$44.00
$47.00
$50.00
21 611(L) 0487
JUNCTION BOXES 146 CF
$100.00
$54.00
$95.53
$105.00
$123.30
$150.00
$110.00
$125.00
$100.00
22 613(A) 0492
24" R.C.PIPE CLASS III 70 LF
$75.00
$68.00
$82.04
$125.00
$82.50
$65.00
$75.00
$80.00
$85.00
23 613(A) 4434
73" X 45" R.C.PIPE ARCH CLASS A-III 104 LF
$400.00
$325.00
$377.24
$679.00
$566.50
$330.00
$515.00
$269.05
$550.00
24 613(A) 4500
58" X 36" R.C.PIPE ARCH CLASS A-III 62 LF
$250.00
$225.00
$238.70
$366.00
$327.80
$280.00
$298.00
$211.39
$300.00
25 613(B) 4527
21" X 15" CORR. GALV. STEEL PIPE ARCH 44 LF
$40.00
$41.00
$59.58
$32.00
$31.90
$45.00
$29.00
$50.00
$40.00
26 613(L) 4559
73" X 45" PREFAB. CULVERT END SECTION, ARCH 4 EA
$6,500.00
$5,925.00
$7,004.00
$2,610.00
$9,658.00
$8,000.00
$8,780.00
$6,300.00
$9,500.00
27 613(L) 5730
24" PREFAB. CULVERT END SECTION, ROUND 2 EA
$800.00
$1,200.00
$875.50
$2,089.00
$1,072.50
$1,000.00
$975.00
$1,200.00
$1,500.00
28 613(M) 7186
TYPE A4 CULVERT END TREATMENT 2 EA
$1,500.00
$1,040.00
$1,493.50
$1,045.00
$2,500.00
$2,000.00
$1,500.00
$1,500.00
$2,000.00
29 613(M) 7189
TYPE D4 CULVERT END TREATMENT 1 EA
$2,500.00
$3,200.00
$2,703.75
$2,089.00
$2,800.00
$3,500.00
$2,000.00
$2,735.00
$3,000.00
30 619(A) 0920
REMOVAL OF STRUCTURES & OBSTRUCTIONS 1 LSUM
$15,000.00
$10,800.00
$3,244.50
$30,000.00
$10,800.00
$13,500.00
$15,000.00
$7,000.00
$12,000.00
31 619(B) 4728
REMOVAL OF ASPHALT PAVEMENT 2,180 SY
$7.50
$7.25
$5.15
$2.00
$7.35
$8.00
$7.20
$8.00
$10.00
32 624(C) 4459
FENCE-STYLE SWF (5 BARBED WIRE) 1,893 LF
$7.00
$10.00
$8.24
$5.50
$6.00
$8.19
$20.00
$9.00
$7.00
33 629(A) 4958
MAILBOX INSTALLATION-SINGLE 2 EA
$150.00
$450.00
$103.00
$235.00
$250.00
$105.00
$100.00
$122.59
$200.00
34 202(A) 1301
UNCLASSIFIED EXCAVATION 980 CY
$12.00
$12.00
$29.87
$16.00
$12.00
$10.00
$9.85
$7.74
$18.00
35 501(B) 1307
SUBSTRUCTURE EXCAVATION COMMON 245 CY
$17.00
$40.00
$30.90
$26.00
$18.00
$30.00
$5.00
$18.69
$20.00
36 509(A) 1326
CLASS AA CONCRETE 540.9 CY
$600.00
$410.00
$558.40
$470.00
$460.00
$481.80
$623.14
$650.00
$550.00
37 511(A) 1332
REINFORCING STEEL 102,560 LB
$1.00
$1.16
$1.10
$1.15
$1.10
$1.00
$0.9000
$1.10
$1.50
38 619(D) 1397
REMOVAL OF EXISTING BRIDGE STRUCTURE 1 LSUM
$35,000.00
$15,000.00
$13,081.00
$20,000.00
$29,000.00
$9,000.00
$30,000.00
$12,000.00
$12,000.00
39 850(A) 8110
SHEET ALUMINUM SIGNS 13.68 SF
$28.00
$28.60
$18.54
$27.20
$60.00
$18.90
$18.00
$22.07
$50.00
40 851(C) 8324
2" SQUARE TUBE POST 30 LF
$11.00
$8.00
$10.30
$7.30
$15.00
$10.50
$10.00
$12.26
$12.00
41 855(A) 8812
TRAFFIC STRIPE(PLASTIC)(4" WIDE) 2,643 LF
$2.60
$1.45
$1.54
$1.40
$1.75
$1.58
$1.50
$1.84
$2.00
42 855(A) 8825
TRAFFIC STRIPE(PLASTIC)(24" WIDE) 13 LF
$15.00
$16.50
$10.30
$16.00
$15.00
$10.50
$10.00
$12.26
$12.00
43 880(J) 8905
CONSTRUCTION TRAFFIC CONTROL 1 LSUM
$5,000.00
$5,150.00
$6,180.00
$10,500.00
$7,300.00
$6,300.00
$6,000.00
$7,355.37
$7,500.00
44 642(B) 0096
CONSTRUCTION STAKING LEVEL II 1 LSUM
$10,800.00
$5,800.00
$5,150.00
$13,160.00
$9,200.00
$8,400.00
$5,000.00
$8,000.00
$10,000.00
45 220 2800
SWPPP DOCUMENTATION AND MANAGEMENT 1 LSUM
$4,000.00
$7,500.00
$2,575.00
$12,500.00
$4,000.00
$5,500.00
$5,500.00
$3,000.00
$3,500.00
46 641 1399
MOBILIZATION 1 LSUM
$79,400.00
$70,000.00
$80,254.36
$69,808.60
$80,000.00
$82,000.00
$117,779.46
$95,000.00
$115,000.00
Showing the first 8 bidders. The Excel and CSV downloads include all 10.