| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$25,000.00 |
$41,450.00 |
$55,000.00 |
$141,341.21 |
$90,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 54,160 | CY |
$6.50 |
$7.50 |
$13.00 |
$8.00 |
$8.75 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 250 | CY |
$8.00 |
$8.80 |
$45.00 |
$20.00 |
$15.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$15,000.00 |
$38,725.00 |
$50,000.00 |
$90,683.23 |
$75,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 3,955 | LF |
$2.00 |
$2.45 |
$3.00 |
$2.45 |
$2.50 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 1,430 | LF |
$8.00 |
$15.10 |
$16.00 |
$15.10 |
$15.00 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 66,078.26 | SY |
$1.50 |
$1.60 |
$1.90 |
$1.65 |
$1.50 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 13.71 | AC |
$470.00 |
$972.00 |
$900.00 |
$972.00 |
$900.00 |
| 9 | 307(B) 4210 |
CEMENT KILN DUST | 1,786 | TON |
$85.00 |
$67.60 |
$62.00 |
$66.65 |
$65.00 |
| 10 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 41,327 | SY |
$3.00 |
$1.80 |
$3.75 |
$4.25 |
$3.75 |
| 11 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 141 | TON |
$27.00 |
$36.80 |
$50.00 |
$124.70 |
$40.00 |
| 12 | 407(B) 0250 |
TACK COAT | 6,142 | GAL |
$3.00 |
$3.20 |
$3.00 |
$2.50 |
$3.60 |
| 13 | 408 5774 |
PRIME COAT | 14,467 | GAL |
$3.00 |
$3.20 |
$3.00 |
$2.50 |
$1.35 |
| 14 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 7,426.66 | TON |
$70.00 |
$75.00 |
$65.00 |
$77.90 |
$85.00 |
| 15 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 6,850 | TON |
$65.00 |
$68.50 |
$60.00 |
$67.55 |
$73.00 |
| 16 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 5,038.89 | TON |
$75.00 |
$85.00 |
$85.00 |
$84.40 |
$92.50 |
| 17 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 73.7 | CY |
$26.00 |
$29.50 |
$55.00 |
$70.20 |
$225.00 |
| 18 | 509(A) 0319 |
CLASS AA CONCRETE | 133.93 | CY |
$435.00 |
$602.50 |
$680.00 |
$885.60 |
$700.00 |
| 19 | 509(D) 0325 |
CLASS C CONCRETE | 20 | CY |
$270.00 |
$361.00 |
$385.00 |
$450.00 |
$500.00 |
| 20 | 511(A) 0332 |
REINFORCING STEEL | 18,909.1 | LB |
$1.00 |
$1.30 |
$1.50 |
$0.5000 |
$1.00 |
| 21 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 4,204.2 | TON |
$21.00 |
$48.00 |
$44.00 |
$69.00 |
$52.00 |
| 22 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 201 | LF |
$75.00 |
$89.60 |
$75.00 |
$107.60 |
$120.00 |
| 23 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 161 | LF |
$105.00 |
$152.50 |
$135.00 |
$153.35 |
$130.00 |
| 24 | 613(A) 4404 |
26" X 15" R.C.PIPE ARCH CLASS A-III | 92 | LF |
$95.00 |
$121.00 |
$105.00 |
$166.30 |
$120.00 |
| 25 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 1,687 | LF |
$38.00 |
$41.90 |
$44.00 |
$54.65 |
$78.00 |
| 26 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 8 | EA |
$935.00 |
$1,078.00 |
$1,400.00 |
$1,328.40 |
$2,250.00 |
| 27 | 613(L) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$1,590.00 |
$1,827.00 |
$2,400.00 |
$1,890.00 |
$2,900.00 |
| 28 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 4 | EA |
$1,040.00 |
$1,222.00 |
$1,300.00 |
$1,328.40 |
$1,900.00 |
| 29 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 64 | EA |
$1,225.00 |
$1,333.00 |
$1,100.00 |
$912.60 |
$2,000.00 |
| 30 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$15,000.00 |
$33,815.00 |
$25,000.00 |
$40,800.00 |
$31,000.00 |
| 31 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 70 | SY |
$6.00 |
$7.70 |
$20.00 |
$25.00 |
$20.00 |
| 32 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 1,656 | SY |
$3.60 |
$3.85 |
$10.00 |
$3.00 |
$8.00 |
| 33 | 619(C) 0924 |
SAWING PAVEMENT | 114 | LF |
$3.50 |
$16.30 |
$10.00 |
$2.50 |
$15.00 |
| 34 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 32 | EA |
$120.00 |
$530.00 |
$250.00 |
$108.00 |
$450.00 |
| 35 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 6 | EA |
$400.00 |
$108.00 |
$115.00 |
$108.00 |
$115.00 |
| 36 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 46.36 | SF |
$22.00 |
$16.20 |
$23.00 |
$21.60 |
$25.00 |
| 37 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 90 | LF |
$9.00 |
$10.80 |
$8.00 |
$7.55 |
$7.00 |
| 38 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 41,416 | LF |
$0.5500 |
$0.3800 |
$0.4000 |
$0.4000 |
$0.4000 |
| 39 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 98 | LF |
$7.50 |
$10.80 |
$5.35 |
$5.00 |
$5.00 |
| 40 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$12,000.00 |
$12,960.00 |
$20,000.00 |
$25,850.00 |
$10,000.00 |
| 41 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$25,275.00 |
$40,000.00 |
$33,500.00 |
$60,000.00 |
| 42 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$8,000.00 |
$3,180.00 |
$3,500.00 |
$14,000.00 |
$15,000.00 |
| 43 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$145,000.00 |
$129,451.12 |
$200,000.00 |
$208,700.00 |
$213,000.00 |