| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 30 | CY |
$40.00 |
$51.50 |
$30.90 |
$33.59 |
$45.00 |
$14.75 |
$101.50 |
| 2 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,573 | CY |
$15.00 |
$24.21 |
$15.45 |
$26.34 |
$19.00 |
$10.45 |
$33.80 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$2,000.00 |
$3,605.00 |
$4,120.00 |
$4,361.69 |
$3,000.00 |
$1,721.18 |
$32,500.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 567 | LF |
$2.50 |
$2.06 |
$2.06 |
$5.48 |
$5.00 |
$2.46 |
$2.15 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 798 | SY |
$3.00 |
$5.15 |
$5.15 |
$4.87 |
$12.50 |
$6.15 |
$5.40 |
| 6 | 233(A) 2817 |
VEGETATIVE MULCHING | 0.16 | AC |
$2,000.00 |
$772.50 |
$772.50 |
$12,176.05 |
$4,100.00 |
$922.06 |
$810.00 |
| 7 | 241 2832 |
MOWING | 4.16 | AC |
$150.00 |
$82.40 |
$82.40 |
$365.29 |
$315.00 |
$98.35 |
$86.40 |
| 8 | 307(K) 4300 |
STABILIZED SUBGRADE | 920 | SY |
$6.00 |
$13.39 |
$12.36 |
$8.65 |
$10.00 |
$9.22 |
$29.50 |
| 9 | 407(B) 0250 |
TACK COAT | 178 | GAL |
$3.00 |
$5.15 |
$3.97 |
$4.69 |
$4.00 |
$4.73 |
$3.75 |
| 10 | 408 5774 |
PRIME COAT | 360 | GAL |
$3.50 |
$7.21 |
$6.18 |
$7.31 |
$6.25 |
$7.38 |
$9.25 |
| 11 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 354 | TON |
$105.00 |
$108.15 |
$149.87 |
$177.16 |
$150.00 |
$178.88 |
$119.00 |
| 12 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 265 | TON |
$130.00 |
$145.23 |
$194.67 |
$230.13 |
$195.00 |
$232.36 |
$139.50 |
| 13 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 23 | TON |
$95.00 |
$257.50 |
$628.30 |
$742.74 |
$625.00 |
$749.94 |
$602.50 |
| 14 | 412 5267 |
COLD MILLING PAVEMENT | 1,574 | SY |
$2.00 |
$12.36 |
$12.15 |
$14.36 |
$12.25 |
$14.51 |
$11.40 |
| 15 | 609(B) 1525 |
2'-8" COMB. CURB & GUTTER (6" BARRIER) | 443 | LF |
$25.00 |
$37.08 |
$38.37 |
$48.28 |
$32.00 |
$34.12 |
$43.20 |
| 16 | 610(A) 0602 |
4" CONCRETE SIDEWALK | 295 | SY |
$60.00 |
$51.50 |
$68.75 |
$60.33 |
$60.00 |
$66.71 |
$59.40 |
| 17 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 50 | LF |
$100.00 |
$99.61 |
$89.87 |
$159.99 |
$90.00 |
$93.28 |
$164.00 |
| 18 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 4 | EA |
$1,500.00 |
$1,399.73 |
$1,519.25 |
$3,222.55 |
$1,700.00 |
$1,337.07 |
$2,160.00 |
| 19 | 619(B) 4726 |
REMOVAL OF CURB AND GUTTER | 1,341 | LF |
$10.00 |
$5.15 |
$7.21 |
$10.05 |
$3.50 |
$8.57 |
$12.30 |
| 20 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 789 | SY |
$5.00 |
$6.18 |
$26.06 |
$12.31 |
$8.50 |
$5.23 |
$24.70 |
| 21 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 492 | LF |
$4.00 |
$3.09 |
$3.61 |
$4.26 |
$2.50 |
$7.38 |
$6.50 |
| 22 | 619(B) 6132 |
REMOVAL OF 6" CONCRETE DIVIDING STRIP | 136 | SY |
$12.00 |
$12.36 |
$10.30 |
$11.07 |
$10.00 |
$8.61 |
$29.40 |
| 23 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 50 | LF |
$20.00 |
$36.05 |
$36.05 |
$42.61 |
$36.00 |
$30.74 |
$27.00 |
| 24 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 2 | EA |
$2,500.00 |
$2,343.25 |
$2,343.25 |
$2,770.05 |
$2,350.00 |
$2,950.60 |
$2,592.00 |
| 25 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 2 | EA |
$3,000.00 |
$1,957.00 |
$1,957.00 |
$2,313.45 |
$2,000.00 |
$2,673.98 |
$2,349.00 |
| 26 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 480 | CY |
$19.68 |
$20.80 |
$30.90 |
$17.17 |
$35.00 |
$14.75 |
$19.90 |
| 27 | 501(G) 6309 |
CLSM BACKFILL | 396 | CY |
$190.00 |
$138.53 |
$237.26 |
$210.72 |
$165.00 |
$151.99 |
$172.50 |
| 28 | 502 1000 |
TEMPORARY EARTH RETAINAGE | 1 | LSUM |
$50,000.00 |
$31,200.00 |
$25,750.00 |
$14,002.46 |
$50,000.00 |
$119,744.91 |
$85,450.00 |
| 29 | 504(A) 1304 |
APPROACH SLAB | 628.6 | SY |
$210.00 |
$250.39 |
$214.67 |
$201.44 |
$190.00 |
$185.57 |
$291.50 |
| 30 | 504(B) 1305 |
SAW-CUT GROOVING | 2,444 | SY |
$5.50 |
$4.21 |
$5.20 |
$4.93 |
$5.00 |
$4.98 |
$4.35 |
| 31 | 504(C) 6250 |
SEALED EXPANSION JOINT | 84.73 | LF |
$280.00 |
$349.85 |
$315.33 |
$262.19 |
$290.00 |
$333.66 |
$349.50 |
| 32 | 504(E) 1381 |
CONCRETE PARAPET | 646 | LF |
$140.00 |
$88.64 |
$86.50 |
$94.02 |
$110.00 |
$97.99 |
$144.00 |
| 33 | 506(A) 1322 |
STRUCTURAL STEEL | 793,450 | LB |
$2.00 |
$1.31 |
$1.50 |
$1.37 |
$1.50 |
$1.52 |
$1.45 |
| 34 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 18 | EA |
$2,500.00 |
$1,743.30 |
$1,982.16 |
$2,101.53 |
$2,500.00 |
$2,169.02 |
$1,910.00 |
| 35 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 18 | EA |
$2,000.00 |
$1,743.30 |
$1,982.41 |
$2,101.53 |
$2,500.00 |
$2,169.02 |
$2,201.00 |
| 36 | 509 5000 |
ELASTOMERIC COATING | 2,175 | SF |
$12.00 |
$14.40 |
$10.30 |
$14.67 |
$8.50 |
$14.81 |
$10.50 |
| 37 | 509 6153 |
SPECIAL CONCRETE FINISH | 1 | LSUM |
$50,000.00 |
$26,577.20 |
$26,321.65 |
$31,115.89 |
$27,500.00 |
$31,417.67 |
$27,600.00 |
| 38 | 509(A) 1326 |
CLASS AA CONCRETE | 665.5 | CY |
$650.00 |
$632.24 |
$680.88 |
$775.47 |
$590.00 |
$549.25 |
$619.00 |
| 39 | 509(B) 1328 |
CLASS A CONCRETE | 381.3 | CY |
$750.00 |
$644.86 |
$680.88 |
$728.68 |
$750.00 |
$513.35 |
$718.50 |
| 40 | 510(C) 6138 |
SLOPE WALL (5") | 1,255 | SY |
$120.00 |
$93.29 |
$84.91 |
$88.99 |
$120.00 |
$146.47 |
$195.50 |
| 41 | 510(D) 0350 |
(SP)GRAFFITI TREATMENT | 11,616 | SF |
$2.20 |
$2.03 |
$2.29 |
$2.38 |
$2.05 |
$2.40 |
$2.10 |
| 42 | 511 6306 |
MECHANICAL SPLICES | 80 | EA |
$50.00 |
$63.73 |
$68.21 |
$101.57 |
$125.00 |
$56.28 |
$155.00 |
| 43 | 511(A) 1332 |
REINFORCING STEEL | 1,370 | LB |
$1.00 |
$1.18 |
$1.53 |
$1.11 |
$1.00 |
$0.9100 |
$5.00 |
| 44 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 175,720 | LB |
$1.20 |
$1.07 |
$1.20 |
$1.11 |
$1.15 |
$1.16 |
$1.50 |
| 45 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 132 | LF |
$40.00 |
$33.75 |
$27.50 |
$27.07 |
$35.00 |
$33.07 |
$45.60 |
| 46 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 638 | LF |
$46.00 |
$38.51 |
$33.08 |
$33.49 |
$35.00 |
$44.69 |
$43.40 |
| 47 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 132 | LF |
$20.00 |
$16.64 |
$15.45 |
$38.89 |
$12.50 |
$18.26 |
$66.00 |
| 48 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 638 | LF |
$20.00 |
$16.64 |
$15.45 |
$41.41 |
$12.50 |
$18.26 |
$27.30 |
| 49 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 50 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,493 | SY |
$5.00 |
$4.16 |
$4.12 |
$4.87 |
$4.15 |
$4.92 |
$4.30 |
| 51 | 516(A) 6098 |
DRILLED SHAFTS 72" DIAMETER | 110 | LF |
$1,200.00 |
$1,116.44 |
$1,096.65 |
$1,479.63 |
$1,500.00 |
$1,333.15 |
$1,429.00 |
| 52 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 2 | EA |
$2,500.00 |
$2,600.00 |
$2,626.50 |
$2,191.69 |
$1,525.00 |
$1,905.59 |
$5,210.00 |
| 53 | 523(A) 6550 |
SEALER CRACK PREPARATION | 511 | LF |
$6.00 |
$4.16 |
$4.12 |
$4.87 |
$5.25 |
$4.92 |
$4.30 |
| 54 | 523(B) 6560 |
SEALER RESIN | 5.2 | GAL |
$210.00 |
$156.00 |
$154.50 |
$182.64 |
$205.00 |
$184.41 |
$162.00 |
| 55 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 348 | LF |
$36.00 |
$24.13 |
$30.90 |
$23.09 |
$17.50 |
$19.59 |
$57.20 |
| 56 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 57 | LF |
$36.00 |
$26.39 |
$30.90 |
$13.22 |
$15.00 |
$20.83 |
$65.30 |
| 57 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 2 | EA |
$1,000.00 |
$980.88 |
$1,236.00 |
$335.41 |
$350.00 |
$1,040.08 |
$1,830.00 |
| 58 | 619(B) 2515 |
REMOVAL OF BRIDGE ITEM (TYPE A) | 1 | EA |
$5,000.00 |
$5,200.00 |
$7,725.00 |
$5,250.00 |
$6,815.00 |
$6,454.42 |
$22,980.00 |
| 59 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$260,000.00 |
$187,158.40 |
$185,700.76 |
$150,158.45 |
$242,000.00 |
$261,956.97 |
$407,740.00 |
| 60 | 802(B) 8334 |
1" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 50 | LF |
$9.60 |
$15.75 |
$10.30 |
$12.18 |
$16.00 |
$18.44 |
$16.20 |
| 61 | 802(B) 8338 |
1 1/2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 555 | LF |
$11.00 |
$21.00 |
$12.36 |
$14.61 |
$20.50 |
$24.59 |
$21.60 |
| 62 | 803(A) 8065 |
PULL BOX(SIZE I) | 7 | EA |
$600.00 |
$1,047.90 |
$1,133.00 |
$1,339.36 |
$1,025.00 |
$1,226.96 |
$1,078.00 |
| 63 | 805(A) 8704 |
REMOVAL OF PULL BOX | 5 | EA |
$180.00 |
$467.25 |
$206.00 |
$243.52 |
$455.00 |
$547.09 |
$480.50 |
| 64 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 7 | EA |
$85.00 |
$105.00 |
$103.00 |
$121.76 |
$105.00 |
$116.80 |
$102.50 |
| 65 | 828(A) 8142 |
VEHICLE LOOP DETECTOR | 10 | EA |
$280.00 |
$1,260.00 |
$2,317.50 |
$2,739.61 |
$1,250.00 |
$1,475.30 |
$1,296.00 |
| 66 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 53 | SF |
$22.00 |
$23.10 |
$22.66 |
$26.79 |
$22.50 |
$27.05 |
$23.80 |
| 67 | 850(B) 8114 |
EXTRUDED ALUMINUM PANEL SIGNS(OVERHEAD SIGNS) | 182 | SF |
$25.00 |
$39.90 |
$39.14 |
$46.27 |
$40.00 |
$29.51 |
$25.90 |
| 68 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 30 | LF |
$11.00 |
$12.60 |
$12.36 |
$14.61 |
$12.50 |
$12.29 |
$10.80 |
| 69 | 853 9066 |
GUARDRAIL DELINEATORS(TYPE 1, CODE 1) | 4 | EA |
$15.00 |
$26.25 |
$25.75 |
$30.44 |
$26.00 |
$16.60 |
$14.60 |
| 70 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 8,353 | LF |
$0.5000 |
$0.9200 |
$0.9100 |
$1.07 |
$0.9000 |
$1.05 |
$0.9200 |
| 71 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 282 | LF |
$2.50 |
$5.25 |
$5.15 |
$6.09 |
$5.20 |
$2.46 |
$2.15 |
| 72 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 75 | LF |
$5.00 |
$5.25 |
$5.15 |
$6.09 |
$5.20 |
$9.84 |
$8.65 |
| 73 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 8,353 | LF |
$0.2500 |
$0.3200 |
$0.3100 |
$0.3700 |
$0.3500 |
$0.7000 |
$0.6200 |
| 74 | 870(C) 8011 |
SAND FILLED IMPACT ATTENUATION MODULE REMOVAL | 1 | LSUM |
$2,500.00 |
$1,575.00 |
$1,545.00 |
$1,826.41 |
$1,550.00 |
$3,073.53 |
$2,700.00 |
| 75 | 871(A) 8325 |
(SP)IMPACT ATTENUATOR | 2 | EA |
$25,000.00 |
$36,120.00 |
$35,432.00 |
$41,885.61 |
$35,000.00 |
$43,681.08 |
$38,375.00 |
| 76 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 1,747 | EA |
$0.7500 |
$1.05 |
$1.03 |
$1.22 |
$1.05 |
$1.23 |
$1.10 |
| 77 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 1,644 | SD |
$7.00 |
$8.40 |
$8.24 |
$9.74 |
$8.25 |
$12.29 |
$10.80 |
| 78 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 4,595.5 | LF |
$25.00 |
$23.10 |
$15.45 |
$11.51 |
$19.50 |
$23.05 |
$21.60 |
| 79 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 17,988 | LF |
$4.00 |
$0.3500 |
$3.61 |
$4.17 |
$1.85 |
$1.23 |
$1.10 |
| 80 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 92 | SD |
$5.00 |
$21.00 |
$20.60 |
$24.35 |
$20.50 |
$3.69 |
$3.25 |
| 81 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 14,236 | SD |
$0.5000 |
$0.0800 |
$0.0700 |
$0.0900 |
$0.1000 |
$0.0600 |
$0.0500 |
| 82 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 4,292 | SD |
$0.7500 |
$1.58 |
$1.54 |
$1.83 |
$1.55 |
$6.15 |
$5.40 |
| 83 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 5,984 | SD |
$1.50 |
$3.15 |
$3.09 |
$3.65 |
$3.10 |
$6.15 |
$5.40 |
| 84 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 7,606 | SD |
$1.00 |
$0.5300 |
$0.5100 |
$0.6100 |
$0.5500 |
$0.0600 |
$0.0500 |
| 85 | 880(C) 8848 |
WING BARRICADES | 2,252 | SD |
$2.00 |
$1.05 |
$1.03 |
$1.22 |
$1.05 |
$0.3700 |
$0.3200 |
| 86 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 18,018 | SD |
$0.5000 |
$0.2600 |
$0.2600 |
$0.3000 |
$0.3000 |
$0.0600 |
$0.0500 |
| 87 | 880(F) 8878 |
DRUMS | 31,136 | SD |
$0.2500 |
$0.0500 |
$0.0500 |
$0.0600 |
$0.0600 |
$0.0600 |
$0.0500 |
| 88 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 1,275 | SD |
$12.00 |
$10.50 |
$10.30 |
$12.18 |
$10.25 |
$7.38 |
$6.50 |
| 89 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$40,000.00 |
$5,070.00 |
$8,034.00 |
$51,230.72 |
$19,000.00 |
$4,794.71 |
$32,885.00 |
| 90 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,710.00 |
$3,090.00 |
$3,044.01 |
$1,800.00 |
$1,844.12 |
$5,618.00 |
| 91 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$230,000.00 |
$211,180.46 |
$171,915.11 |
$181,069.86 |
$207,000.00 |
$346,196.79 |
$402,131.45 |