Bid tab 200185

Let Apr 16, 2020 · Division 4 · Oklahoma Sign up free

‹ Apr 2020 results

BRIDGE REHABILITATION SH -77H (SOONER ROAD): OVER I-240, 4.0 MILES EAST OF THE I -35 INTERCHANGE IN OKLAHOMA CITY . PROJECT LENGTH = 0.131 MILE

Let date
Thursday, April 16, 2020
Contract
200185
J/P numbers
27107(04)
District
Division 4
County
Oklahoma
Highway
Limits
BRIDGE REHABILITATION SH -77H (SOONER ROAD): OVER I-240, 4.0 MILES EAST OF THE I -35 INTERCHANGE IN OKLAHOMA CITY . PROJECT LENGTH = 0.131 MILE
Project number
SBR-255N(517)SB

Bidders 6

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$4,538,083
1 Frontier Bridge, Inc. Low bidder $3,664,145 -19.3%
2 Treas Construction Inc $3,920,386 -13.6% +7.0%
3 SHERWOOD CONSTRUCTION CO., INC. $4,024,375 -11.3% +9.8%
4 MANHATTAN ROAD & BRIDGE COMPANY, LLC $4,039,923 -11.0% +10.3%
5 C3 Construction, Inc. $4,241,734 -6.5% +15.8%
6 HASKELL LEMON CONSTRUCTION CO. $4,817,287 +6.2% +31.5%

Bid tab: unit prices 91 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 Frontier Bridge…#2 Treas Construct…#3 SHERWOOD CONSTR…#4 MANHATTAN ROAD …#5 C3 Construction…#6 HASKELL LEMON C…
1202(A) 0183 UNCLASSIFIED EXCAVATION30CY $40.00 $51.50 $30.90 $33.59 $45.00 $14.75 $101.50
2202(D) 0184 UNCLASSIFIED BORROW1,573CY $15.00 $24.21 $15.45 $26.34 $19.00 $10.45 $33.80
3205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $2,000.00 $3,605.00 $4,120.00 $4,361.69 $3,000.00 $1,721.18 $32,500.00
4221(C) 2801 TEMPORARY SILT FENCE567LF $2.50 $2.06 $2.06 $5.48 $5.00 $2.46 $2.15
5230(A) 2806 SOLID SLAB SODDING798SY $3.00 $5.15 $5.15 $4.87 $12.50 $6.15 $5.40
6233(A) 2817 VEGETATIVE MULCHING0.16AC $2,000.00 $772.50 $772.50 $12,176.05 $4,100.00 $922.06 $810.00
7241 2832 MOWING4.16AC $150.00 $82.40 $82.40 $365.29 $315.00 $98.35 $86.40
8307(K) 4300 STABILIZED SUBGRADE920SY $6.00 $13.39 $12.36 $8.65 $10.00 $9.22 $29.50
9407(B) 0250 TACK COAT178GAL $3.00 $5.15 $3.97 $4.69 $4.00 $4.73 $3.75
10408 5774 PRIME COAT360GAL $3.50 $7.21 $6.18 $7.31 $6.25 $7.38 $9.25
11411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)354TON $105.00 $108.15 $149.87 $177.16 $150.00 $178.88 $119.00
12411(C) 5955 SUPERPAVE, TYPE S4(PG 70-28 OK)265TON $130.00 $145.23 $194.67 $230.13 $195.00 $232.36 $139.50
13411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)23TON $95.00 $257.50 $628.30 $742.74 $625.00 $749.94 $602.50
14412 5267 COLD MILLING PAVEMENT1,574SY $2.00 $12.36 $12.15 $14.36 $12.25 $14.51 $11.40
15609(B) 1525 2'-8" COMB. CURB & GUTTER (6" BARRIER)443LF $25.00 $37.08 $38.37 $48.28 $32.00 $34.12 $43.20
16610(A) 0602 4" CONCRETE SIDEWALK295SY $60.00 $51.50 $68.75 $60.33 $60.00 $66.71 $59.40
17613(A) 0492 24" R.C.PIPE CLASS III50LF $100.00 $99.61 $89.87 $159.99 $90.00 $93.28 $164.00
18613(M) 7187 TYPE B4 CULVERT END TREATMENT4EA $1,500.00 $1,399.73 $1,519.25 $3,222.55 $1,700.00 $1,337.07 $2,160.00
19619(B) 4726 REMOVAL OF CURB AND GUTTER1,341LF $10.00 $5.15 $7.21 $10.05 $3.50 $8.57 $12.30
20619(B) 4728 REMOVAL OF ASPHALT PAVEMENT789SY $5.00 $6.18 $26.06 $12.31 $8.50 $5.23 $24.70
21619(B) 4780 REMOVAL OF GUARDRAIL492LF $4.00 $3.09 $3.61 $4.26 $2.50 $7.38 $6.50
22619(B) 6132 REMOVAL OF 6" CONCRETE DIVIDING STRIP136SY $12.00 $12.36 $10.30 $11.07 $10.00 $8.61 $29.40
23623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE50LF $20.00 $36.05 $36.05 $42.61 $36.00 $30.74 $27.00
24623(G) 8590 GUARDRAIL END TREATMENT (31")2EA $2,500.00 $2,343.25 $2,343.25 $2,770.05 $2,350.00 $2,950.60 $2,592.00
25623(I) 8700 GUARDRAIL BRIDGE CONN-THRIE BEAM (31")2EA $3,000.00 $1,957.00 $1,957.00 $2,313.45 $2,000.00 $2,673.98 $2,349.00
26501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON480CY $19.68 $20.80 $30.90 $17.17 $35.00 $14.75 $19.90
27501(G) 6309 CLSM BACKFILL396CY $190.00 $138.53 $237.26 $210.72 $165.00 $151.99 $172.50
28502 1000 TEMPORARY EARTH RETAINAGE1LSUM $50,000.00 $31,200.00 $25,750.00 $14,002.46 $50,000.00 $119,744.91 $85,450.00
29504(A) 1304 APPROACH SLAB628.6SY $210.00 $250.39 $214.67 $201.44 $190.00 $185.57 $291.50
30504(B) 1305 SAW-CUT GROOVING2,444SY $5.50 $4.21 $5.20 $4.93 $5.00 $4.98 $4.35
31504(C) 6250 SEALED EXPANSION JOINT84.73LF $280.00 $349.85 $315.33 $262.19 $290.00 $333.66 $349.50
32504(E) 1381 CONCRETE PARAPET646LF $140.00 $88.64 $86.50 $94.02 $110.00 $97.99 $144.00
33506(A) 1322 STRUCTURAL STEEL793,450LB $2.00 $1.31 $1.50 $1.37 $1.50 $1.52 $1.45
34507(A) 6170 STAINLESS STEEL FIXED BEARING ASSEMBLY18EA $2,500.00 $1,743.30 $1,982.16 $2,101.53 $2,500.00 $2,169.02 $1,910.00
35507(B) 6174 STAINLESS STEEL EXPANSION BEARING ASSEMBLY18EA $2,000.00 $1,743.30 $1,982.41 $2,101.53 $2,500.00 $2,169.02 $2,201.00
36509 5000 ELASTOMERIC COATING2,175SF $12.00 $14.40 $10.30 $14.67 $8.50 $14.81 $10.50
37509 6153 SPECIAL CONCRETE FINISH1LSUM $50,000.00 $26,577.20 $26,321.65 $31,115.89 $27,500.00 $31,417.67 $27,600.00
38509(A) 1326 CLASS AA CONCRETE665.5CY $650.00 $632.24 $680.88 $775.47 $590.00 $549.25 $619.00
39509(B) 1328 CLASS A CONCRETE381.3CY $750.00 $644.86 $680.88 $728.68 $750.00 $513.35 $718.50
40510(C) 6138 SLOPE WALL (5")1,255SY $120.00 $93.29 $84.91 $88.99 $120.00 $146.47 $195.50
41510(D) 0350 (SP)GRAFFITI TREATMENT11,616SF $2.20 $2.03 $2.29 $2.38 $2.05 $2.40 $2.10
42511 6306 MECHANICAL SPLICES80EA $50.00 $63.73 $68.21 $101.57 $125.00 $56.28 $155.00
43511(A) 1332 REINFORCING STEEL1,370LB $1.00 $1.18 $1.53 $1.11 $1.00 $0.9100 $5.00
44511(B) 6010 EPOXY COATED REINFORCING STEEL175,720LB $1.20 $1.07 $1.20 $1.11 $1.15 $1.16 $1.50
45514(A) 6010 PILES, FURNISHED (HP 10X42)132LF $40.00 $33.75 $27.50 $27.07 $35.00 $33.07 $45.60
46514(A) 6011 PILES, FURNISHED (HP 12X53)638LF $46.00 $38.51 $33.08 $33.49 $35.00 $44.69 $43.40
47514(B) 6292 PILES, DRIVEN (HP 10X42)132LF $20.00 $16.64 $15.45 $38.89 $12.50 $18.26 $66.00
48514(B) 6294 PILES, DRIVEN (HP 12X53)638LF $20.00 $16.64 $15.45 $41.41 $12.50 $18.26 $27.30
49514(L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00
50515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)1,493SY $5.00 $4.16 $4.12 $4.87 $4.15 $4.92 $4.30
51516(A) 6098 DRILLED SHAFTS 72" DIAMETER110LF $1,200.00 $1,116.44 $1,096.65 $1,479.63 $1,500.00 $1,333.15 $1,429.00
52516(C) 6200 CROSSHOLE SONIC LOGGING2EA $2,500.00 $2,600.00 $2,626.50 $2,191.69 $1,525.00 $1,905.59 $5,210.00
53523(A) 6550 SEALER CRACK PREPARATION511LF $6.00 $4.16 $4.12 $4.87 $5.25 $4.92 $4.30
54523(B) 6560 SEALER RESIN5.2GAL $210.00 $156.00 $154.50 $182.64 $205.00 $184.41 $162.00
55613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND348LF $36.00 $24.13 $30.90 $23.09 $17.50 $19.59 $57.20
56613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.57LF $36.00 $26.39 $30.90 $13.22 $15.00 $20.83 $65.30
57613(Q) 5946 OUTLET LATERAL HEADWALL2EA $1,000.00 $980.88 $1,236.00 $335.41 $350.00 $1,040.08 $1,830.00
58619(B) 2515 REMOVAL OF BRIDGE ITEM (TYPE A)1EA $5,000.00 $5,200.00 $7,725.00 $5,250.00 $6,815.00 $6,454.42 $22,980.00
59619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $260,000.00 $187,158.40 $185,700.76 $150,158.45 $242,000.00 $261,956.97 $407,740.00
60802(B) 8334 1" PVC SCH.40 PLASTIC CONDUIT TRENCHED50LF $9.60 $15.75 $10.30 $12.18 $16.00 $18.44 $16.20
61802(B) 8338 1 1/2" PVC SCH.40 PLASTIC CONDUIT TRENCHED555LF $11.00 $21.00 $12.36 $14.61 $20.50 $24.59 $21.60
62803(A) 8065 PULL BOX(SIZE I)7EA $600.00 $1,047.90 $1,133.00 $1,339.36 $1,025.00 $1,226.96 $1,078.00
63805(A) 8704 REMOVAL OF PULL BOX5EA $180.00 $467.25 $206.00 $243.52 $455.00 $547.09 $480.50
64805(A) 8724 (PL)REMOVAL OF EXISTING SIGNS7EA $85.00 $105.00 $103.00 $121.76 $105.00 $116.80 $102.50
65828(A) 8142 VEHICLE LOOP DETECTOR10EA $280.00 $1,260.00 $2,317.50 $2,739.61 $1,250.00 $1,475.30 $1,296.00
66850(A) 8110 SHEET ALUMINUM SIGNS53SF $22.00 $23.10 $22.66 $26.79 $22.50 $27.05 $23.80
67850(B) 8114 EXTRUDED ALUMINUM PANEL SIGNS(OVERHEAD SIGNS)182SF $25.00 $39.90 $39.14 $46.27 $40.00 $29.51 $25.90
68851(C) 8330 2 1/2" SQUARE TUBE POST30LF $11.00 $12.60 $12.36 $14.61 $12.50 $12.29 $10.80
69853 9066 GUARDRAIL DELINEATORS(TYPE 1, CODE 1)4EA $15.00 $26.25 $25.75 $30.44 $26.00 $16.60 $14.60
70856(A) 8530 TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE)8,353LF $0.5000 $0.9200 $0.9100 $1.07 $0.9000 $1.05 $0.9200
71856(A) 8548 TRAFFIC STRIPE(MULTI-POLY)(12" WIDE)282LF $2.50 $5.25 $5.15 $6.09 $5.20 $2.46 $2.15
72856(A) 8555 TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE)75LF $5.00 $5.25 $5.15 $6.09 $5.20 $9.84 $8.65
73857(F) 8006 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE)8,353LF $0.2500 $0.3200 $0.3100 $0.3700 $0.3500 $0.7000 $0.6200
74870(C) 8011 SAND FILLED IMPACT ATTENUATION MODULE REMOVAL1LSUM $2,500.00 $1,575.00 $1,545.00 $1,826.41 $1,550.00 $3,073.53 $2,700.00
75871(A) 8325 (SP)IMPACT ATTENUATOR2EA $25,000.00 $36,120.00 $35,432.00 $41,885.61 $35,000.00 $43,681.08 $38,375.00
76857(E) 8887 (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-11,747EA $0.7500 $1.05 $1.03 $1.22 $1.05 $1.23 $1.10
77871(B) 8705 (SP)CONST.ZONE IMPACT ATTEN.1,644SD $7.00 $8.40 $8.24 $9.74 $8.25 $12.29 $10.80
78877(B) 8484 DELIVER PORTABLE LONGITUDINAL BARRIER4,595.5LF $25.00 $23.10 $15.45 $11.51 $19.50 $23.05 $21.60
79877(C) 8486 RELOCATION OF PORTABLE LONGITUDINAL BARRIER17,988LF $4.00 $0.3500 $3.61 $4.17 $1.85 $1.23 $1.10
80880(A) 8812 ARROW DISPLAY(TYPE C)92SD $5.00 $21.00 $20.60 $24.35 $20.50 $3.69 $3.25
81880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF14,236SD $0.5000 $0.0800 $0.0700 $0.0900 $0.1000 $0.0600 $0.0500
82880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF4,292SD $0.7500 $1.58 $1.54 $1.83 $1.55 $6.15 $5.40
83880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF5,984SD $1.50 $3.15 $3.09 $3.65 $3.10 $6.15 $5.40
84880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)7,606SD $1.00 $0.5300 $0.5100 $0.6100 $0.5500 $0.0600 $0.0500
85880(C) 8848 WING BARRICADES2,252SD $2.00 $1.05 $1.03 $1.22 $1.05 $0.3700 $0.3200
86880(E) 8860 WARNING LIGHTS(TYPE A)18,018SD $0.5000 $0.2600 $0.2600 $0.3000 $0.3000 $0.0600 $0.0500
87880(F) 8878 DRUMS31,136SD $0.2500 $0.0500 $0.0500 $0.0600 $0.0600 $0.0600 $0.0500
88882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN1,275SD $12.00 $10.50 $10.30 $12.18 $10.25 $7.38 $6.50
89642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $40,000.00 $5,070.00 $8,034.00 $51,230.72 $19,000.00 $4,794.71 $32,885.00
90220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $5,000.00 $3,710.00 $3,090.00 $3,044.01 $1,800.00 $1,844.12 $5,618.00
91641 1399 MOBILIZATION1LSUM $230,000.00 $211,180.46 $171,915.11 $181,069.86 $207,000.00 $346,196.79 $402,131.45