| 10 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 5,289 | CY |
$12.00 |
$10.00 |
$10.98 |
$6.00 |
| 20 | 202(D) 0184 |
UNCLASSIFIED BORROW | 7,244 | CY |
$14.00 |
$10.00 |
$16.30 |
$14.00 |
| 30 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,000.00 |
$35,000.00 |
$16,553.74 |
$74,970.75 |
| 40 | 221(C) 2801 |
TEMPORARY SILT FENCE | 3,120 | LF |
$2.50 |
$3.50 |
$3.30 |
$3.20 |
| 50 | 221(F) 0100 |
TEMPORARY SILT DIKE | 175 | LF |
$13.00 |
$8.00 |
$16.50 |
$16.00 |
| 60 | 230(A) 2806 |
SOLID SLAB SODDING | 33,322 | SY |
$3.00 |
$3.00 |
$2.42 |
$2.35 |
| 70 | 233(A) 2817 |
VEGETATIVE MULCHING | 6.88 | AC |
$1,500.00 |
$2,000.00 |
$1,320.00 |
$1,285.00 |
| 80 | 241 2832 |
MOWING | 13.76 | AC |
$150.00 |
$2,100.00 |
$330.00 |
$320.00 |
| 90 | 303(A) 2200 |
(SP)AGGREGATE BASE TYPE A, PLANT MIXED | 1,464 | CY |
$55.00 |
$52.00 |
$53.03 |
$69.00 |
| 100 | 307(K) 4300 |
STABILIZED SUBGRADE | 7,330 | SY |
$7.00 |
$8.25 |
$6.26 |
$6.00 |
| 110 | 326(A) 0100 |
GEOTEXTILE REINFORCEMENT | 8,019 | SY |
$5.00 |
$2.50 |
$2.19 |
$2.30 |
| 120 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 980 | TON |
$45.00 |
$28.50 |
$39.41 |
$27.00 |
| 130 | 407(B) 0250 |
TACK COAT | 917 | GAL |
$3.00 |
$3.00 |
$3.98 |
$2.50 |
| 140 | 408 5774 |
PRIME COAT | 4,556 | GAL |
$3.00 |
$3.65 |
$4.35 |
$2.50 |
| 150 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 2,048 | TON |
$85.00 |
$76.00 |
$86.28 |
$73.50 |
| 160 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 671 | TON |
$110.00 |
$85.00 |
$107.25 |
$96.60 |
| 170 | 509(D) 0325 |
CLASS C CONCRETE | 366 | CY |
$350.00 |
$395.00 |
$360.71 |
$275.00 |
| 180 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 164 | LF |
$100.00 |
$126.00 |
$134.03 |
$160.00 |
| 190 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 3 | EA |
$1,700.00 |
$2,000.00 |
$2,592.61 |
$2,140.00 |
| 200 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 3 | EA |
$1,800.00 |
$2,000.00 |
$2,934.21 |
$2,700.00 |
| 210 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$8,000.00 |
$7,500.00 |
$6,633.48 |
$35,000.00 |
| 220 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 3,865 | SY |
$7.00 |
$2.50 |
$2.83 |
$4.50 |
| 230 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 344 | LF |
$6.50 |
$6.10 |
$11.00 |
$11.10 |
| 240 | 624(C) 7181 |
FENCE-STYLE SWF (6 BARBED WIRE) | 1,688 | LF |
$7.50 |
$6.50 |
$13.20 |
$11.10 |
| 250 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 1 | EA |
$120.00 |
$100.00 |
$110.00 |
$107.00 |
| 260 | 629(C) 4960 |
MAILBOX | 1 | EA |
$45.00 |
$50.00 |
$55.00 |
$54.00 |
| 270 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 1 | EA |
$40.00 |
$25.00 |
$27.50 |
$27.00 |
| 280 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 648 | SD |
$0.4000 |
$2.00 |
$2.20 |
$2.15 |
| 290 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,080 | SD |
$0.7500 |
$1.00 |
$1.10 |
$1.10 |
| 300 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 1,296 | SD |
$0.9000 |
$1.00 |
$1.10 |
$1.10 |
| 310 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 3,240 | SD |
$0.3500 |
$0.2500 |
$0.2800 |
$0.3000 |
| 320 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 208 | SD |
$15.00 |
$20.00 |
$22.00 |
$21.50 |
| 330 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 2 | EA |
$55.00 |
$50.00 |
$55.00 |
$54.00 |
| 340 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 11.25 | SF |
$35.00 |
$30.00 |
$33.00 |
$32.00 |
| 350 | 851(C) 8324 |
2" SQUARE TUBE POST | 27.5 | LF |
$12.00 |
$15.00 |
$16.50 |
$16.00 |
| 360 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 5,525 | LF |
$0.6000 |
$1.25 |
$1.38 |
$1.45 |
| 370 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$12,000.00 |
$8,500.00 |
$10,764.31 |
$24,500.00 |
| 380 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$4,000.00 |
$5,000.00 |
$2,874.18 |
$18,500.00 |
| 390 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$75,000.00 |
$50,000.00 |
$48,981.78 |
$74,000.00 |