| 10 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$3,157.71 |
$8,994.90 |
$7,500.00 |
$8,277.21 |
$16,805.00 |
$17,500.00 |
| 20 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 100 | CY |
$18.00 |
$25.09 |
$26.43 |
$35.00 |
$26.11 |
$42.50 |
$25.00 |
| 30 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$2,500.00 |
$11,392.11 |
$6,511.60 |
$6,500.00 |
$5,518.14 |
$15,275.00 |
$25.00 |
| 40 | 221(C) 2801 |
TEMPORARY SILT FENCE | 3,751 | LF |
$1.75 |
$3.20 |
$2.59 |
$3.00 |
$1.70 |
$3.35 |
$5.81 |
| 50 | 230(A) 2806 |
SOLID SLAB SODDING | 1,914 | SY |
$4.00 |
$4.78 |
$3.90 |
$5.00 |
$5.63 |
$5.00 |
$8.53 |
| 60 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 195 | CY |
$90.00 |
$89.71 |
$68.42 |
$100.00 |
$126.37 |
$270.50 |
$49.45 |
| 70 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 50 | TON |
$50.00 |
$56.93 |
$56.28 |
$50.00 |
$58.95 |
$59.80 |
$271.25 |
| 80 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 15 | TON |
$300.00 |
$247.24 |
$177.28 |
$600.00 |
$301.29 |
$458.50 |
$271.25 |
| 90 | 509(D) 0325 |
CLASS C CONCRETE | 5 | CY |
$350.00 |
$656.01 |
$437.75 |
$400.00 |
$413.10 |
$500.00 |
$697.50 |
| 100 | 609(B) 1514 |
1'-8" COMB. CURB & GUTTER (8" BARRIER) | 988 | LF |
$28.00 |
$33.85 |
$36.27 |
$35.00 |
$42.70 |
$34.70 |
$31.00 |
| 110 | 610(A) 0602 |
4" CONCRETE SIDEWALK | 2,460 | SY |
$80.00 |
$69.98 |
$59.40 |
$58.00 |
$71.19 |
$71.70 |
$159.65 |
| 120 | 610(A) 0606 |
8" CONCRETE SIDEWALK | 20 | SY |
$150.00 |
$90.05 |
$124.39 |
$115.00 |
$211.11 |
$140.50 |
$184.45 |
| 130 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 431 | SY |
$85.00 |
$85.81 |
$85.46 |
$80.00 |
$90.64 |
$91.20 |
$172.05 |
| 140 | 610(I) 4610 |
TACTILE WARNING DEVICE-NEW | 260 | SF |
$41.00 |
$36.11 |
$25.68 |
$58.00 |
$47.21 |
$34.20 |
$38.75 |
| 150 | 612(E) 0647 |
VALVE BOXES ADJUST TO GRADE | 2 | EA |
$206.00 |
$310.49 |
$716.48 |
$500.00 |
$368.75 |
$1,125.00 |
$736.25 |
| 160 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$1,455.15 |
$8,994.90 |
$6,000.00 |
$5,242.64 |
$9,841.00 |
$20,000.00 |
| 170 | 619(B) 4726 |
REMOVAL OF CURB AND GUTTER | 1,070 | LF |
$6.25 |
$4.75 |
$7.62 |
$15.00 |
$13.41 |
$12.10 |
$12.06 |
| 180 | 619(B) 4766 |
REMOVAL OF CONCRETE DRIVEWAY | 381 | SY |
$10.75 |
$10.42 |
$12.27 |
$21.00 |
$43.59 |
$26.30 |
$14.28 |
| 190 | 619(B) 4792 |
REMOVAL OF SIDEWALK | 1,899 | SY |
$20.00 |
$6.83 |
$9.84 |
$14.00 |
$20.86 |
$17.00 |
$12.14 |
| 200 | 619(C) 0924 |
SAWING PAVEMENT | 2,223 | LF |
$3.25 |
$4.72 |
$3.89 |
$5.00 |
$4.71 |
$10.30 |
$6.59 |
| 210 | 622(A) 4445 |
2" PIPE RAILING | 16 | LF |
$200.00 |
$330.70 |
$275.52 |
$300.00 |
$172.50 |
$361.50 |
$348.75 |
| 220 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 60 | SD |
$11.75 |
$10.66 |
$11.00 |
$13.00 |
$13.00 |
$11.10 |
$15.50 |
| 230 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 60 | SD |
$5.10 |
$5.33 |
$5.50 |
$13.00 |
$6.50 |
$11.10 |
$7.75 |
| 240 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 840 | SD |
$0.4500 |
$1.07 |
$1.10 |
$1.00 |
$1.30 |
$1.10 |
$1.55 |
| 250 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 360 | SD |
$0.6000 |
$2.13 |
$2.20 |
$3.00 |
$2.30 |
$2.20 |
$3.10 |
| 260 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 720 | SD |
$1.60 |
$2.13 |
$2.20 |
$4.00 |
$2.60 |
$3.35 |
$3.10 |
| 270 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 240 | SD |
$0.7500 |
$2.13 |
$2.20 |
$3.00 |
$2.60 |
$2.20 |
$3.10 |
| 280 | 880(C) 8848 |
WING BARRICADES | 240 | SD |
$2.00 |
$2.13 |
$2.20 |
$1.00 |
$2.60 |
$1.10 |
$3.10 |
| 290 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 1,080 | SD |
$0.3000 |
$2.13 |
$2.20 |
$1.00 |
$2.60 |
$0.3900 |
$3.10 |
| 300 | 880(F) 8878 |
DRUMS | 600 | SD |
$0.2000 |
$2.13 |
$2.20 |
$2.00 |
$2.60 |
$0.9400 |
$3.10 |
| 310 | 880(G) 8890 |
CHANNELIZER CONES | 960 | SD |
$0.3000 |
$2.13 |
$2.20 |
$2.00 |
$2.60 |
$0.9400 |
$3.10 |
| 320 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 148 | SD |
$9.55 |
$26.65 |
$27.50 |
$32.00 |
$32.49 |
$27.80 |
$38.75 |
| 330 | 836 8425 |
REGULATORY OR WARNING SIGN ASSEMBLY | 8 | EA |
$5,890.00 |
$6,928.59 |
$7,150.00 |
$6,200.00 |
$8,446.75 |
$5,498.00 |
$10,075.00 |
| 340 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 122 | SF |
$23.10 |
$26.65 |
$27.50 |
$25.00 |
$32.49 |
$20.00 |
$38.75 |
| 350 | 851(C) 8324 |
2" SQUARE TUBE POST | 210 | LF |
$9.00 |
$10.66 |
$11.00 |
$10.00 |
$13.00 |
$8.90 |
$15.50 |
| 360 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 1,715 | LF |
$0.4500 |
$2.66 |
$2.75 |
$7.00 |
$3.25 |
$5.55 |
$3.88 |
| 370 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 304 | LF |
$8.60 |
$5.33 |
$5.50 |
$40.00 |
$18.33 |
$33.30 |
$7.75 |
| 380 | 856(B) 8870 |
TRAFFIC STRIPE(MULTI-POLY.)(SYMBOLS) | 1 | EA |
$305.00 |
$373.08 |
$385.00 |
$750.00 |
$454.83 |
$555.50 |
$542.50 |
| 390 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 2,000 | LF |
$0.2000 |
$1.07 |
$1.10 |
$1.00 |
$1.30 |
$0.6100 |
$1.55 |
| 400 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$3,197.81 |
$5,762.19 |
$6,000.00 |
$4,678.00 |
$6,696.00 |
$5,580.00 |
| 410 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$4,500.00 |
$2,951.34 |
$3,487.12 |
$5,500.00 |
$4,490.00 |
$2,429.00 |
$387.50 |
| 420 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$44,700.00 |
$16,962.27 |
$43,877.06 |
$40,000.00 |
$27,248.00 |
$62,125.00 |
$22,481.00 |