| 10 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$14,000.00 |
$15,300.00 |
$65,000.00 |
$50,000.00 |
$12,132.43 |
$5,500.00 |
$75,600.00 |
$75,685.00 |
$10,000.00 |
| 20 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 100 | CY |
$24.00 |
$25.50 |
$45.00 |
$20.00 |
$18.20 |
$18.00 |
$21.00 |
$128.50 |
$30.00 |
| 30 | 202(D) 4781 |
UNCLASSIFIED BORROW (TOPSOIL) | 250 | CY |
$26.00 |
$33.30 |
$25.00 |
$20.00 |
$24.26 |
$23.00 |
$31.50 |
$30.50 |
$60.00 |
| 40 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,320 | LF |
$2.00 |
$3.05 |
$2.75 |
$1.35 |
$2.99 |
$3.20 |
$3.15 |
$3.35 |
$3.00 |
| 50 | 230(A) 2806 |
SOLID SLAB SODDING | 1,960 | SY |
$3.50 |
$3.56 |
$7.00 |
$3.85 |
$3.49 |
$3.83 |
$5.25 |
$5.55 |
$5.00 |
| 60 | 233(A) 2817 |
VEGETATIVE MULCHING | 0.4 | AC |
$960.00 |
$1,014.90 |
$6,500.00 |
$800.00 |
$996.33 |
$1,100.00 |
$2,100.00 |
$2,220.00 |
$2,000.00 |
| 70 | 402(A) 0217 |
TRAFFIC BOUND SURFACE COURSE TYPE A | 20 | TON |
$40.00 |
$67.86 |
$50.00 |
$51.00 |
$45.97 |
$100.00 |
$105.00 |
$246.50 |
$70.00 |
| 80 | 407(B) 0250 |
TACK COAT | 238 | GAL |
$4.50 |
$5.55 |
$7.00 |
$4.40 |
$4.85 |
$5.94 |
$5.71 |
$3.90 |
$4.00 |
| 90 | 408 5774 |
PRIME COAT | 316 | GAL |
$7.10 |
$6.00 |
$7.00 |
$5.50 |
$6.07 |
$6.40 |
$6.17 |
$9.80 |
$5.00 |
| 100 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 354 | TON |
$146.00 |
$122.97 |
$150.00 |
$137.50 |
$151.66 |
$130.00 |
$126.58 |
$116.00 |
$125.00 |
| 110 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 202 | TON |
$142.00 |
$135.25 |
$150.00 |
$137.50 |
$151.66 |
$135.00 |
$139.23 |
$138.00 |
$125.00 |
| 120 | 412 5267 |
COLD MILLING PAVEMENT | 2,000 | SY |
$7.00 |
$5.20 |
$7.00 |
$16.00 |
$8.49 |
$7.50 |
$3.25 |
$8.60 |
$20.00 |
| 130 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$9,500.00 |
$10,200.00 |
$10,000.00 |
$5,000.00 |
$5,095.62 |
$7,500.00 |
$5,250.00 |
$17,800.00 |
$8,000.00 |
| 140 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 120 | LF |
$20.00 |
$20.40 |
$30.00 |
$26.25 |
$20.03 |
$28.00 |
$21.00 |
$28.30 |
$25.50 |
| 150 | 625(D) 1254 |
REMOVE AND RECONSTRUCT GUARDRAIL | 1,140 | LF |
$25.00 |
$30.09 |
$40.00 |
$38.00 |
$29.54 |
$38.00 |
$30.97 |
$38.30 |
$34.50 |
| 160 | 501(G) 6309 |
CLSM BACKFILL | 36 | CY |
$275.00 |
$137.38 |
$125.00 |
$205.00 |
$183.66 |
$200.00 |
$250.57 |
$296.00 |
$325.00 |
| 170 | 502 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$300,000.00 |
$57,200.00 |
$100,000.00 |
$100,000.00 |
$151,655.32 |
$60,000.00 |
$152,250.00 |
$120,290.00 |
$250,000.00 |
| 180 | 504(A) 1304 |
APPROACH SLAB | 305.2 | SY |
$250.00 |
$207.96 |
$245.00 |
$240.00 |
$188.29 |
$215.00 |
$212.09 |
$264.50 |
$250.00 |
| 190 | 504(B) 1305 |
SAW-CUT GROOVING | 3,382.4 | SY |
$5.00 |
$3.95 |
$5.00 |
$4.18 |
$4.61 |
$4.37 |
$4.20 |
$4.20 |
$3.85 |
| 200 | 504(C) 6250 |
SEALED EXPANSION JOINT | 280.6 | LF |
$350.00 |
$265.27 |
$395.62 |
$285.00 |
$246.24 |
$275.00 |
$304.36 |
$363.50 |
$400.00 |
| 210 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 1,397 | LF |
$100.00 |
$66.23 |
$105.00 |
$89.00 |
$82.07 |
$135.00 |
$88.79 |
$104.50 |
$180.00 |
| 220 | 506(A) 1322 |
STRUCTURAL STEEL | 400 | LB |
$20.00 |
$5.71 |
$25.00 |
$7.60 |
$12.17 |
$25.00 |
$21.56 |
$22.90 |
$50.00 |
| 230 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 55 | EA |
$2,250.00 |
$798.18 |
$1,450.00 |
$1,130.00 |
$645.23 |
$950.00 |
$1,877.24 |
$1,553.00 |
$1,000.00 |
| 240 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 55 | EA |
$2,250.00 |
$902.18 |
$1,450.00 |
$1,130.00 |
$645.23 |
$950.00 |
$1,877.24 |
$1,553.00 |
$1,000.00 |
| 250 | 509(A) 1326 |
CLASS AA CONCRETE | 998.8 | CY |
$750.00 |
$639.94 |
$615.00 |
$795.00 |
$654.41 |
$860.00 |
$678.79 |
$748.50 |
$945.00 |
| 260 | 509(D) 1331 |
CLASS C CONCRETE | 12 | CY |
$900.00 |
$416.17 |
$1,900.00 |
$750.00 |
$571.64 |
$735.00 |
$1,743.00 |
$792.50 |
$800.00 |
| 270 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 181,460 | LB |
$1.25 |
$1.04 |
$1.10 |
$1.18 |
$1.01 |
$1.25 |
$1.17 |
$1.80 |
$2.00 |
| 280 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$75,000.00 |
$104,000.00 |
$90,000.00 |
$88,000.00 |
$206,707.11 |
$88,000.00 |
$99,372.00 |
$99,815.00 |
$103,884.00 |
| 290 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$40,000.00 |
$41,600.00 |
$34,000.00 |
$27,500.00 |
$12,132.43 |
$27,500.00 |
$25,872.00 |
$27,355.00 |
$6,632.00 |
| 300 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 2,451 | SY |
$5.00 |
$4.16 |
$3.00 |
$4.20 |
$4.01 |
$4.00 |
$4.20 |
$4.45 |
$4.00 |
| 310 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 80 | LF |
$50.00 |
$43.68 |
$32.00 |
$32.50 |
$42.06 |
$46.00 |
$39.90 |
$46.60 |
$42.00 |
| 320 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 2 | GAL |
$100.00 |
$104.00 |
$80.00 |
$84.00 |
$100.13 |
$110.00 |
$94.50 |
$111.00 |
$100.00 |
| 330 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 150 | SY |
$900.00 |
$832.00 |
$550.00 |
$875.00 |
$801.06 |
$880.00 |
$1,102.50 |
$888.00 |
$800.00 |
| 340 | 523(A) 6550 |
SEALER CRACK PREPARATION | 698.5 | LF |
$5.00 |
$4.16 |
$3.00 |
$4.20 |
$4.01 |
$3.00 |
$4.20 |
$4.45 |
$4.00 |
| 350 | 523(B) 6560 |
SEALER RESIN | 4.7 | GAL |
$150.00 |
$156.00 |
$125.00 |
$165.00 |
$150.20 |
$100.00 |
$210.00 |
$166.50 |
$150.00 |
| 360 | 524(A) 6610 |
(SP)CARBON FIBER-REINFORCED POLYMER | 185 | SF |
$100.00 |
$98.80 |
$50.00 |
$71.00 |
$95.13 |
$105.00 |
$110.25 |
$105.50 |
$95.00 |
| 370 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 27.5 | SY |
$75.00 |
$43.68 |
$32.00 |
$44.00 |
$42.06 |
$46.20 |
$80.85 |
$46.60 |
$42.00 |
| 380 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$40,000.00 |
$15,600.00 |
$20,000.00 |
$44,167.00 |
$18,708.20 |
$25,000.00 |
$68,250.00 |
$55,825.00 |
$30,000.00 |
| 390 | 619(B) 2510 |
REMOVAL OF BRIDGE ITEM (TYPE A) | 1 | LSUM |
$500,000.00 |
$176,800.00 |
$325,000.00 |
$257,000.00 |
$436,804.94 |
$385,000.00 |
$562,800.00 |
$640,150.00 |
$860,000.00 |
| 400 | 619(B) 2520 |
REMOVAL OF BRIDGE ITEM (TYPE B) | 1 | LSUM |
$40,000.00 |
$20,800.00 |
$20,000.00 |
$37,000.00 |
$34,710.87 |
$30,000.00 |
$79,464.00 |
$54,135.00 |
$35,000.00 |
| 410 | 823 8478 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 210 | SD |
$100.00 |
$158.10 |
$92.00 |
$102.00 |
$155.20 |
$101.00 |
$162.75 |
$102.00 |
$92.00 |
| 420 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 4,600 | LF |
$0.8500 |
$0.9200 |
$0.8700 |
$0.9600 |
$0.9000 |
$0.9600 |
$0.9400 |
$0.9700 |
$0.8700 |
| 430 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 8,622 | LF |
$0.2000 |
$0.2000 |
$0.2800 |
$0.3100 |
$0.2000 |
$0.3200 |
$0.2100 |
$0.3100 |
$0.2800 |
| 440 | 857(E) 8890 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | 1,455 | EA |
$0.5000 |
$0.5100 |
$0.8500 |
$0.9400 |
$0.5000 |
$0.9400 |
$0.5200 |
$0.9400 |
$0.8500 |
| 450 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 10,712 | LF |
$0.3500 |
$0.1400 |
$0.5500 |
$0.6100 |
$0.1400 |
$0.6000 |
$0.1400 |
$0.6100 |
$0.5500 |
| 460 | 870(A) 8485 |
SAND FILLED IMPACT ATTENUATION MODULE | 7,980 | SD |
$2.00 |
$0.5100 |
$1.75 |
$1.93 |
$0.5000 |
$1.92 |
$0.5300 |
$1.95 |
$1.75 |
| 470 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 2,675 | LF |
$20.00 |
$15.30 |
$32.00 |
$18.00 |
$38.82 |
$14.50 |
$21.00 |
$28.00 |
$13.20 |
| 480 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 2,675 | LF |
$3.75 |
$3.06 |
$2.60 |
$2.80 |
$3.15 |
$1.90 |
$3.15 |
$1.95 |
$1.75 |
| 490 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 5,460 | SD |
$0.3500 |
$0.1500 |
$0.0200 |
$0.0300 |
$0.1800 |
$0.0300 |
$0.1600 |
$0.0200 |
$0.0200 |
| 500 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,520 | SD |
$0.6000 |
$0.1500 |
$0.0200 |
$0.0300 |
$0.1800 |
$0.0300 |
$0.1600 |
$0.0200 |
$0.0200 |
| 510 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,570 | SD |
$2.00 |
$2.04 |
$2.70 |
$3.00 |
$2.43 |
$3.00 |
$2.10 |
$3.00 |
$2.70 |
| 520 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 420 | SD |
$2.25 |
$0.2600 |
$2.00 |
$2.20 |
$0.2500 |
$2.22 |
$0.2600 |
$2.20 |
$2.00 |
| 530 | 880(C) 8848 |
WING BARRICADES | 840 | SD |
$1.75 |
$0.5100 |
$0.5000 |
$0.2800 |
$0.5000 |
$0.2800 |
$0.3200 |
$0.2800 |
$0.2500 |
| 540 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 3,990 | SD |
$0.2500 |
$1.02 |
$1.00 |
$0.5500 |
$1.00 |
$0.5500 |
$1.05 |
$0.5600 |
$0.5000 |
| 550 | 880(F) 8878 |
DRUMS | 9,870 | SD |
$0.1500 |
$0.1000 |
$0.1000 |
$0.0300 |
$0.1000 |
$0.0300 |
$0.1100 |
$0.0200 |
$0.0200 |
| 560 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,000.00 |
$9,975.00 |
$8,500.00 |
$18,500.00 |
$11,525.81 |
$18,000.00 |
$15,750.00 |
$42,925.00 |
$9,500.00 |
| 570 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$11,500.00 |
$9,270.00 |
$11,500.00 |
$6,500.00 |
$242.64 |
$9,000.00 |
$5,775.00 |
$5,551.00 |
$5,000.00 |
| 580 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$179,000.00 |
$135,757.82 |
$155,000.00 |
$159,150.00 |
$274,192.82 |
$287,000.00 |
$173,945.59 |
$458,520.00 |
$300,000.00 |