| 10 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 590 | CY |
$25.00 |
$10.30 |
$10.98 |
$10.30 |
$10.30 |
$15.00 |
$7.85 |
$18.00 |
$25.00 |
| 20 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,550 | CY |
$20.00 |
$12.88 |
$20.87 |
$16.75 |
$19.57 |
$25.00 |
$11.77 |
$57.00 |
$16.00 |
| 30 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$8,000.00 |
$2,060.00 |
$7,139.82 |
$3,000.00 |
$6,695.00 |
$10,000.00 |
$1,369.36 |
$4,000.00 |
$10,000.00 |
| 40 | 221(C) 2801 |
TEMPORARY SILT FENCE | 965 | LF |
$4.00 |
$3.06 |
$3.26 |
$1.20 |
$3.06 |
$2.01 |
$3.13 |
$2.50 |
$5.00 |
| 50 | 221(F) 0100 |
TEMPORARY SILT DIKE | 50 | LF |
$25.00 |
$19.52 |
$20.82 |
$12.80 |
$19.52 |
$10.36 |
$19.96 |
$7.50 |
$20.00 |
| 60 | 230(A) 2806 |
SOLID SLAB SODDING | 2,230 | SY |
$3.50 |
$2.98 |
$3.17 |
$3.18 |
$2.98 |
$2.39 |
$3.04 |
$5.10 |
$6.00 |
| 70 | 307(K) 4300 |
STABILIZED SUBGRADE | 1,633 | SY |
$10.00 |
$6.18 |
$14.17 |
$6.60 |
$6.18 |
$15.00 |
$7.85 |
$6.10 |
$16.00 |
| 80 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 220 | TON |
$40.00 |
$35.27 |
$57.98 |
$37.50 |
$32.15 |
$60.00 |
$25.44 |
$37.50 |
$45.00 |
| 90 | 407(B) 0250 |
TACK COAT | 240 | GAL |
$5.00 |
$5.15 |
$4.59 |
$5.50 |
$5.15 |
$4.00 |
$6.54 |
$5.15 |
$6.00 |
| 100 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 645 | TON |
$125.00 |
$98.88 |
$83.41 |
$105.60 |
$98.88 |
$95.00 |
$125.56 |
$105.00 |
$112.00 |
| 110 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 625 | TON |
$125.00 |
$111.24 |
$101.20 |
$118.80 |
$111.24 |
$120.00 |
$141.25 |
$125.00 |
$130.00 |
| 120 | 412 5267 |
COLD MILLING PAVEMENT | 2,465 | SY |
$15.00 |
$8.24 |
$5.62 |
$11.50 |
$9.78 |
$4.00 |
$11.48 |
$8.25 |
$5.00 |
| 130 | 413(A) 4861 |
RUMBLE STRIP-METHOD HMA-CON | 836 | LF |
$1.50 |
$3.61 |
$1.39 |
$2.75 |
$2.57 |
$5.05 |
$1.34 |
$1.30 |
$1.50 |
| 140 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$375.00 |
$375.22 |
$475.62 |
$300.00 |
$602.55 |
$500.00 |
$399.57 |
$500.00 |
$500.00 |
| 150 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 380 | LF |
$50.00 |
$28.39 |
$23.76 |
$22.00 |
$23.61 |
$35.00 |
$38.95 |
$32.00 |
$25.00 |
| 160 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 2,368 | SY |
$7.00 |
$7.73 |
$11.11 |
$10.00 |
$8.75 |
$6.00 |
$10.04 |
$4.00 |
$7.00 |
| 170 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 947 | LF |
$4.50 |
$2.06 |
$4.39 |
$2.75 |
$2.57 |
$2.66 |
$5.23 |
$3.50 |
$4.50 |
| 180 | 619(C) 0924 |
SAWING PAVEMENT | 850 | LF |
$6.50 |
$4.12 |
$3.69 |
$6.15 |
$8.24 |
$4.00 |
$4.58 |
$3.00 |
$10.00 |
| 190 | 623 0100 |
(PL)GUARDRAIL CURBING | 4 | EA |
$2,000.00 |
$1,558.50 |
$876.34 |
$1,150.00 |
$1,802.50 |
$700.00 |
$29.90 |
$825.00 |
$2,700.00 |
| 200 | 623(A) 1418 |
BEAM GUARDRAIL W-BEAM SINGLE | 550 | LF |
$21.00 |
$20.60 |
$18.67 |
$22.00 |
$20.60 |
$21.30 |
$22.23 |
$20.50 |
$19.00 |
| 210 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,500.00 |
$2,266.00 |
$2,465.98 |
$2,420.00 |
$2,266.00 |
$2,343.00 |
$2,936.26 |
$2,225.00 |
$2,500.00 |
| 220 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$2,200.00 |
$1,699.50 |
$2,372.62 |
$1,815.00 |
$1,699.50 |
$1,757.25 |
$2,825.09 |
$1,700.00 |
$2,400.00 |
| 222 | 625(D) 1254 |
REMOVE AND RECONSTRUCT GUARDRAIL | 40 | LF |
$48.00 |
$20.60 |
$18.67 |
$22.00 |
$20.60 |
$21.30 |
$22.23 |
$20.50 |
$17.00 |
| 230 | 853 9066 |
GUARDRAIL DELINEATORS(TYPE 1, CODE 1) | 12 | EA |
$20.00 |
$10.30 |
$14.55 |
$11.00 |
$10.30 |
$10.65 |
$17.33 |
$10.25 |
$15.00 |
| 250 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 360 | CY |
$45.00 |
$18.72 |
$18.30 |
$10.00 |
$36.05 |
$40.00 |
$18.31 |
$16.00 |
$20.00 |
| 260 | 501(G) 6309 |
CLSM BACKFILL | 300 | CY |
$200.00 |
$140.24 |
$133.08 |
$140.00 |
$237.26 |
$190.00 |
$124.66 |
$160.00 |
$150.00 |
| 270 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 3,002.9 | LF |
$245.00 |
$197.96 |
$196.05 |
$199.00 |
$238.77 |
$220.00 |
$251.74 |
$232.00 |
$245.00 |
| 280 | 504(A) 1304 |
APPROACH SLAB | 331.7 | SY |
$250.00 |
$218.73 |
$189.17 |
$215.00 |
$214.07 |
$220.00 |
$200.18 |
$190.00 |
$250.00 |
| 290 | 504(B) 1305 |
SAW-CUT GROOVING | 3,511.9 | SY |
$5.00 |
$4.21 |
$4.45 |
$4.40 |
$5.20 |
$4.31 |
$5.30 |
$4.10 |
$5.00 |
| 300 | 504(C) 6250 |
SEALED EXPANSION JOINT | 253.8 | LF |
$300.00 |
$227.23 |
$240.56 |
$270.00 |
$196.60 |
$270.00 |
$263.15 |
$242.00 |
$300.00 |
| 310 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 1,328.5 | LF |
$100.00 |
$79.72 |
$93.54 |
$85.00 |
$81.55 |
$95.00 |
$91.51 |
$55.00 |
$110.00 |
| 320 | 506(A) 1322 |
STRUCTURAL STEEL | 3,550 | LB |
$10.00 |
$2.49 |
$3.03 |
$2.75 |
$1.98 |
$2.50 |
$1.80 |
$2.00 |
$5.00 |
| 330 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 30 | EA |
$2,200.00 |
$1,587.00 |
$1,647.38 |
$1,500.00 |
$1,907.56 |
$2,300.00 |
$2,047.35 |
$2,500.00 |
$2,500.00 |
| 340 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 30 | EA |
$2,200.00 |
$1,587.00 |
$1,647.38 |
$1,500.00 |
$1,907.56 |
$2,300.00 |
$2,047.35 |
$2,500.00 |
$3,000.00 |
| 350 | 509 5000 |
ELASTOMERIC COATING | 1,912.9 | SF |
$15.00 |
$14.50 |
$14.28 |
$14.30 |
$13.39 |
$13.84 |
$17.66 |
$8.00 |
$12.00 |
| 360 | 509(A) 1326 |
CLASS AA CONCRETE | 811.7 | CY |
$650.00 |
$570.34 |
$511.15 |
$600.00 |
$691.61 |
$546.00 |
$661.34 |
$585.00 |
$700.00 |
| 370 | 509(B) 1328 |
CLASS A CONCRETE | 362 | CY |
$700.00 |
$540.86 |
$599.56 |
$617.50 |
$691.61 |
$800.00 |
$598.49 |
$850.00 |
$700.00 |
| 380 | 509(D) 1331 |
CLASS C CONCRETE | 30 | CY |
$700.00 |
$387.58 |
$498.61 |
$500.00 |
$602.55 |
$1,500.00 |
$503.25 |
$500.00 |
$500.00 |
| 390 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 325,160 | LB |
$1.30 |
$0.9800 |
$1.04 |
$1.11 |
$1.23 |
$1.25 |
$1.13 |
$1.15 |
$1.25 |
| 400 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 40 | LF |
$60.00 |
$131.26 |
$344.51 |
$115.00 |
$152.67 |
$200.00 |
$275.84 |
$180.00 |
$55.00 |
| 410 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 2,321.3 | SY |
$5.00 |
$4.16 |
$4.39 |
$4.40 |
$4.12 |
$4.26 |
$4.21 |
$4.10 |
$4.00 |
| 420 | 545 4800 |
(PL)REPLACE BRIDGE ITEMS | 1 | LSUM |
$10,000.00 |
$5,200.00 |
$1,957.80 |
$7,000.00 |
$12,875.00 |
$7,500.00 |
$19,618.66 |
$20,000.00 |
$18,000.00 |
| 430 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 98 | LF |
$30.00 |
$18.97 |
$37.71 |
$27.50 |
$31.78 |
$30.00 |
$9.15 |
$22.00 |
$35.00 |
| 440 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 34 | LF |
$30.00 |
$13.57 |
$34.78 |
$43.00 |
$31.78 |
$30.00 |
$13.42 |
$35.00 |
$50.00 |
| 450 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$120,000.00 |
$130,000.00 |
$141,461.16 |
$192,000.00 |
$104,327.15 |
$130,000.00 |
$109,864.53 |
$250,000.00 |
$300,000.00 |
| 460 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 2,520 | LF |
$2.25 |
$1.55 |
$3.30 |
$1.65 |
$1.54 |
$1.60 |
$3.16 |
$1.55 |
$3.00 |
| 470 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 8,500 | LF |
$0.7500 |
$0.1100 |
$0.2400 |
$0.1200 |
$0.1100 |
$0.1200 |
$0.2300 |
$0.1200 |
$0.2200 |
| 480 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 8,500 | LF |
$1.00 |
$0.1100 |
$0.4600 |
$0.1200 |
$0.1100 |
$0.1200 |
$0.4400 |
$0.1200 |
$0.4200 |
| 490 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 60 | SD |
$65.00 |
$25.75 |
$8.79 |
$27.50 |
$25.75 |
$26.63 |
$8.43 |
$25.50 |
$8.00 |
| 500 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 2,800 | LF |
$30.00 |
$13.39 |
$19.06 |
$25.00 |
$23.69 |
$23.00 |
$18.28 |
$40.00 |
$22.00 |
| 510 | 878(B) 8487 |
MODULAR GLARE SCREEN (TEMPORARY) | 75,000 | SD |
$0.2000 |
$0.0600 |
$0.0200 |
$0.0700 |
$0.0600 |
$0.0600 |
$0.0200 |
$0.0700 |
$0.0200 |
| 520 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 600 | SD |
$6.00 |
$5.15 |
$8.79 |
$5.50 |
$5.15 |
$5.33 |
$8.43 |
$5.20 |
$8.00 |
| 530 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 6,000 | SD |
$0.1000 |
$0.1600 |
$0.3800 |
$0.1700 |
$0.1500 |
$0.1600 |
$0.4600 |
$0.2000 |
$0.3500 |
| 540 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,400 | SD |
$0.1000 |
$1.03 |
$2.20 |
$1.10 |
$1.03 |
$1.07 |
$2.62 |
$1.05 |
$2.00 |
| 550 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 4,800 | SD |
$0.5000 |
$0.5200 |
$2.20 |
$0.5500 |
$0.5100 |
$0.5300 |
$2.62 |
$0.5500 |
$2.00 |
| 560 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 3,900 | SD |
$1.00 |
$0.2600 |
$0.6600 |
$0.2800 |
$0.2500 |
$0.2700 |
$0.7800 |
$0.3000 |
$0.6000 |
| 570 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 7,500 | SD |
$0.5000 |
$2.68 |
$0.5500 |
$3.38 |
$2.68 |
$2.77 |
$0.5300 |
$2.65 |
$0.5000 |
| 580 | 880(F) 8878 |
DRUMS | 42,000 | SD |
$0.2000 |
$0.0500 |
$0.2700 |
$0.0400 |
$0.0500 |
$0.0500 |
$0.2600 |
$0.0600 |
$0.2500 |
| 590 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 600 | SD |
$10.00 |
$10.30 |
$16.48 |
$11.00 |
$10.30 |
$10.65 |
$15.80 |
$10.40 |
$15.00 |
| 600 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,000.00 |
$5,875.00 |
$15,816.69 |
$10,000.00 |
$4,841.00 |
$14,700.00 |
$6,147.18 |
$17,500.00 |
$20,000.00 |
| 610 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$190,000.00 |
$150,810.21 |
$154,508.37 |
$125,000.00 |
$141,003.80 |
$183,000.00 |
$256,873.73 |
$182,250.00 |
$325,000.00 |