| 10 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$42,544.89 |
$70,000.00 |
$125,000.00 |
$295,000.00 |
| 20 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 7,091 | CY |
$8.00 |
$7.41 |
$15.00 |
$20.00 |
$15.00 |
| 30 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$2,000.00 |
$7,608.98 |
$4,200.00 |
$5,000.00 |
$29,350.00 |
| 40 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,140 | LF |
$1.90 |
$2.09 |
$2.00 |
$2.00 |
$2.75 |
| 50 | 221(G) 0151 |
TEMPORARY ROCK FILTER DAM TYPE 2 | 11 | CY |
$150.00 |
$138.09 |
$170.00 |
$400.00 |
$135.00 |
| 60 | 230(A) 2806 |
SOLID SLAB SODDING | 6,099 | SY |
$3.00 |
$4.15 |
$4.00 |
$4.00 |
$5.75 |
| 70 | 232(B) 2814 |
SEEDING METHOD B | 1.26 | AC |
$600.00 |
$2,362.50 |
$2,255.00 |
$1,250.00 |
$2,750.00 |
| 80 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.26 | AC |
$300.00 |
$2,362.50 |
$2,255.00 |
$1,250.00 |
$2,750.00 |
| 90 | 241 2832 |
MOWING | 7 | AC |
$100.00 |
$418.95 |
$400.00 |
$450.00 |
$510.00 |
| 100 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 673 | CY |
$50.00 |
$70.10 |
$60.00 |
$45.00 |
$60.00 |
| 110 | 307(K) 4300 |
STABILIZED SUBGRADE | 3,198 | SY |
$10.00 |
$9.52 |
$7.00 |
$6.00 |
$10.50 |
| 120 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 500 | TON |
$35.00 |
$33.31 |
$29.00 |
$30.00 |
$35.00 |
| 130 | 407(B) 0250 |
TACK COAT | 459 | GAL |
$5.00 |
$4.20 |
$2.60 |
$2.00 |
$2.85 |
| 140 | 408 5774 |
PRIME COAT | 788 | GAL |
$6.00 |
$6.30 |
$4.25 |
$2.00 |
$4.85 |
| 150 | 409(A) 4242 |
FABRIC REINFORCEMENT | 3,198 | SY |
$4.00 |
$3.85 |
$5.20 |
$6.00 |
$7.50 |
| 160 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,077 | TON |
$110.00 |
$94.50 |
$88.00 |
$73.00 |
$98.00 |
| 170 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 384 | TON |
$120.00 |
$123.90 |
$119.00 |
$80.00 |
$130.00 |
| 180 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 3,350 | SY |
$6.00 |
$6.30 |
$4.00 |
$5.00 |
$8.00 |
| 190 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 716 | LF |
$3.77 |
$3.15 |
$3.10 |
$3.00 |
$10.00 |
| 200 | 619(C) 0924 |
SAWING PAVEMENT | 68 | LF |
$10.00 |
$11.19 |
$10.00 |
$10.00 |
$4.00 |
| 210 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 425 | LF |
$17.67 |
$24.15 |
$23.50 |
$24.00 |
$33.00 |
| 220 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,260.89 |
$2,782.50 |
$2,750.00 |
$2,700.00 |
$3,450.00 |
| 230 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$1,680.97 |
$2,126.25 |
$3,100.00 |
$2,100.00 |
$2,900.00 |
| 240 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 16 | EA |
$14.13 |
$15.75 |
$15.50 |
$15.00 |
$29.00 |
| 250 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 200 | CY |
$25.00 |
$19.03 |
$80.00 |
$25.00 |
$115.00 |
| 260 | 501(G) 6309 |
CLSM BACKFILL | 295 | CY |
$200.00 |
$130.06 |
$150.00 |
$120.00 |
$145.00 |
| 270 | 504(A) 1304 |
APPROACH SLAB | 281.2 | SY |
$225.00 |
$331.68 |
$212.00 |
$235.00 |
$210.00 |
| 280 | 504(B) 1305 |
SAW-CUT GROOVING | 3,227 | SY |
$5.00 |
$4.25 |
$4.15 |
$4.00 |
$4.75 |
| 290 | 504(C) 6250 |
SEALED EXPANSION JOINT | 84.9 | LF |
$300.00 |
$330.05 |
$300.00 |
$310.00 |
$325.00 |
| 300 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 1,452.2 | LF |
$90.00 |
$97.47 |
$62.00 |
$80.00 |
$98.00 |
| 310 | 506(A) 1322 |
STRUCTURAL STEEL | 1,396,200 | LB |
$1.90 |
$1.92 |
$2.20 |
$2.15 |
$2.46 |
| 320 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 10 | EA |
$2,500.00 |
$4,367.02 |
$4,200.00 |
$4,300.00 |
$1,400.00 |
| 330 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 20 | EA |
$2,500.00 |
$4,176.79 |
$4,200.00 |
$4,300.00 |
$1,600.00 |
| 340 | 509 6152 |
SPECIAL CONCRETE FINISH | 151 | SY |
$120.00 |
$109.07 |
$70.00 |
$140.00 |
$132.00 |
| 350 | 509(A) 1326 |
CLASS AA CONCRETE | 729.9 | CY |
$600.00 |
$668.84 |
$650.00 |
$1,100.00 |
$975.00 |
| 360 | 509(B) 1328 |
CLASS A CONCRETE | 250.1 | CY |
$600.00 |
$603.86 |
$850.00 |
$930.00 |
$1,500.00 |
| 370 | 509(D) 1331 |
CLASS C CONCRETE | 18 | CY |
$400.00 |
$1,018.38 |
$590.00 |
$500.00 |
$705.00 |
| 380 | 511(A) 1332 |
REINFORCING STEEL | 1,080 | LB |
$1.20 |
$1.14 |
$1.50 |
$1.10 |
$1.15 |
| 390 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 253,560 | LB |
$1.25 |
$1.22 |
$1.50 |
$1.25 |
$1.35 |
| 400 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 184 | LF |
$35.00 |
$43.52 |
$48.00 |
$42.00 |
$50.00 |
| 410 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 582 | LF |
$40.00 |
$54.17 |
$45.00 |
$53.00 |
$60.00 |
| 420 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 184 | LF |
$20.00 |
$20.68 |
$12.50 |
$10.00 |
$40.00 |
| 430 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 582 | LF |
$20.00 |
$26.15 |
$15.00 |
$10.00 |
$49.00 |
| 440 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 450 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,440 | SY |
$5.00 |
$4.20 |
$4.20 |
$4.00 |
$4.50 |
| 460 | 516(A) 6098 |
DRILLED SHAFTS 72" DIAMETER | 336 | LF |
$1,500.00 |
$1,007.16 |
$1,200.00 |
$1,200.00 |
$1,275.00 |
| 470 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 3 | EA |
$2,500.00 |
$2,523.00 |
$2,000.00 |
$7,500.00 |
$1,650.00 |
| 480 | 523(A) 6550 |
SEALER CRACK PREPARATION | 163 | LF |
$5.00 |
$4.20 |
$4.20 |
$4.00 |
$4.75 |
| 490 | 523(B) 6560 |
SEALER RESIN | 2 | GAL |
$150.00 |
$157.50 |
$155.00 |
$150.00 |
$175.00 |
| 500 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 2,400 | TON |
$45.00 |
$46.15 |
$44.00 |
$40.00 |
$51.00 |
| 510 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 450 | TON |
$35.00 |
$33.22 |
$33.00 |
$25.00 |
$49.00 |
| 520 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$30.00 |
$26.08 |
$18.00 |
$10.00 |
$32.00 |
| 530 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 76 | LF |
$30.00 |
$28.47 |
$18.00 |
$10.00 |
$32.00 |
| 540 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$150,000.00 |
$126,134.67 |
$565,000.00 |
$610,240.00 |
$795,000.00 |
| 550 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 18,500 | SD |
$0.2000 |
$0.2600 |
$0.2700 |
$0.3000 |
$0.2100 |
| 560 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 4,000 | SD |
$0.8000 |
$0.5300 |
$0.5100 |
$0.5500 |
$0.4000 |
| 570 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 2,500 | SD |
$1.00 |
$0.2600 |
$0.2700 |
$0.3000 |
$1.75 |
| 580 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 2,000 | SD |
$0.8000 |
$1.05 |
$1.05 |
$2.00 |
$3.50 |
| 590 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 2,000 | SD |
$0.7000 |
$1.05 |
$1.05 |
$1.00 |
$0.5800 |
| 600 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 28 | SD |
$25.00 |
$21.00 |
$21.00 |
$45.00 |
$28.00 |
| 610 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 3 | EA |
$80.00 |
$52.50 |
$52.00 |
$100.00 |
$12.00 |
| 620 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 29 | SF |
$25.00 |
$21.00 |
$21.00 |
$25.00 |
$15.00 |
| 630 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 70 | LF |
$15.00 |
$12.60 |
$12.50 |
$15.00 |
$6.00 |
| 640 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 6,000 | LF |
$1.17 |
$0.8700 |
$0.8500 |
$1.00 |
$0.6000 |
| 650 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$25,000.00 |
$11,550.00 |
$13,700.00 |
$58,643.00 |
$122,000.00 |
| 660 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,159.00 |
$1,800.85 |
$25,000.00 |
$1,000.00 |
| 670 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$280,000.00 |
$291,241.61 |
$320,000.00 |
$340,000.00 |
$298,200.00 |