| 10 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 54,000 | CY |
$8.00 |
$11.45 |
$7.35 |
$14.30 |
$15.25 |
| 20 | 202(D) 0184 |
UNCLASSIFIED BORROW | 2,203 | CY |
$12.00 |
$16.30 |
$10.50 |
$14.30 |
$15.25 |
| 30 | 221(C) 2801 |
TEMPORARY SILT FENCE | 100 | LF |
$3.00 |
$4.04 |
$4.39 |
$14.00 |
$4.14 |
| 40 | 221(K) 0600 |
TEMPORARY FIBER LOG | 26,400 | LF |
$5.00 |
$3.63 |
$3.95 |
$8.48 |
$7.50 |
| 50 | 230(A) 2806 |
SOLID SLAB SODDING | 49,334 | SY |
$2.00 |
$2.41 |
$2.62 |
$2.77 |
$2.47 |
| 60 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 25,581 | CY |
$50.00 |
$46.74 |
$43.16 |
$42.35 |
$48.00 |
| 70 | 307(K) 4300 |
STABILIZED SUBGRADE | 128,793 | SY |
$5.00 |
$5.46 |
$5.25 |
$3.74 |
$5.80 |
| 80 | 326(A) 0100 |
GEOTEXTILE REINFORCEMENT | 140,395 | SY |
$4.00 |
$3.68 |
$3.76 |
$4.55 |
$4.30 |
| 90 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 30,735 | TON |
$30.00 |
$22.44 |
$24.82 |
$19.93 |
$28.00 |
| 100 | 408 5774 |
PRIME COAT | 79,336.93 | GAL |
$3.50 |
$0.2600 |
$4.52 |
$1.00 |
$1.00 |
| 110 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 17,376 | TON |
$75.00 |
$77.08 |
$71.26 |
$70.53 |
$74.00 |
| 120 | 412 5267 |
COLD MILLING PAVEMENT | 9,891 | SY |
$2.00 |
$3.59 |
$4.30 |
$3.04 |
$3.00 |
| 130 | 414(A) 0210 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 39,759 | SY |
$15.00 |
$7.33 |
$11.99 |
$14.78 |
$12.50 |
| 140 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 63,929 | SY |
$22.00 |
$10.72 |
$16.00 |
$16.40 |
$22.49 |
| 150 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 33,114 | CY |
$115.00 |
$96.65 |
$91.31 |
$91.29 |
$119.00 |
| 160 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 250 | LF |
$35.00 |
$46.47 |
$58.72 |
$42.66 |
$45.32 |
| 170 | 613(J) 5915 |
EDGE DRAIN CONDUIT-PERFORATED | 44,400 | LF |
$7.50 |
$3.84 |
$5.42 |
$6.19 |
$9.75 |
| 180 | 613(K) 5916 |
EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 1,807 | LF |
$8.00 |
$13.06 |
$5.42 |
$17.38 |
$9.75 |
| 190 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 2 | EA |
$1,300.00 |
$1,387.29 |
$953.98 |
$2,149.07 |
$2,656.61 |
| 200 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 148 | EA |
$314.00 |
$614.61 |
$289.83 |
$367.49 |
$366.18 |
| 210 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 10,520 | SY |
$8.00 |
$8.03 |
$4.68 |
$4.26 |
$10.00 |
| 220 | 619(B) 4763 |
REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY | 93,734 | SY |
$7.00 |
$3.19 |
$4.87 |
$4.97 |
$10.00 |
| 230 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 4,479 | LF |
$3.00 |
$4.00 |
$4.36 |
$4.61 |
$5.00 |
| 240 | 619(C) 0924 |
SAWING PAVEMENT | 2,540 | LF |
$4.50 |
$1.41 |
$3.39 |
$2.41 |
$3.23 |
| 250 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 3,725 | LF |
$20.00 |
$21.30 |
$23.19 |
$24.51 |
$21.88 |
| 260 | 623(F) 8300 |
GUARDRAIL TRAIL END TURNDOWN (31") | 5 | EA |
$1,000.00 |
$1,244.59 |
$1,354.59 |
$1,431.89 |
$1,278.00 |
| 270 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 11 | EA |
$2,500.00 |
$3,059.62 |
$3,330.04 |
$3,520.07 |
$3,141.75 |
| 280 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 6 | EA |
$1,900.00 |
$3,059.62 |
$3,330.05 |
$3,520.07 |
$3,141.75 |
| 290 | 853 9024 |
DELINEATORS(TYPE 1, CODE 1) | 79 | EA |
$11.00 |
$13.74 |
$14.96 |
$15.81 |
$14.11 |
| 292 | 884(B) 8421 |
BRIDGE PARAPET RETROFIT | 20 | LF |
$230.00 |
$415.87 |
$338.79 |
$547.19 |
$1,564.59 |
| 300 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 88,620 | LF |
$0.5500 |
$0.5200 |
$0.5000 |
$0.6000 |
$0.5300 |
| 310 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 59,515 | LF |
$0.8000 |
$0.9300 |
$0.9000 |
$1.07 |
$0.9600 |
| 320 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 156,146 | LF |
$0.2000 |
$0.1500 |
$0.1400 |
$0.1700 |
$0.1500 |
| 330 | 858(A) 8911 |
PAVEMENT MARKERS CLASS A TYPE 2-C | 3,409 | EA |
$8.80 |
$4.93 |
$4.75 |
$5.67 |
$5.06 |
| 340 | 858(A) 8914 |
PAVEMENT MARKERS CLASS A TYPE 2-D | 3,143 | EA |
$6.00 |
$4.93 |
$4.75 |
$5.67 |
$5.06 |
| 350 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 432 | SD |
$7.80 |
$6.22 |
$6.00 |
$7.16 |
$6.39 |
| 360 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 14,550 | LF |
$23.00 |
$14.83 |
$11.38 |
$13.44 |
$42.00 |
| 370 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 19,325 | LF |
$3.00 |
$1.55 |
$2.43 |
$2.43 |
$3.50 |
| 380 | 878(B) 8487 |
MODULAR GLARE SCREEN (TEMPORARY) | 26,880 | SD |
$0.1000 |
$0.2600 |
$0.2800 |
$0.3000 |
$0.2700 |
| 390 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 432 | SD |
$6.15 |
$1.04 |
$1.13 |
$1.19 |
$1.07 |
| 400 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 13,320 | SD |
$0.4000 |
$0.4700 |
$0.5100 |
$0.5400 |
$0.4800 |
| 410 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 12,780 | SD |
$0.7500 |
$0.4700 |
$0.5100 |
$0.5400 |
$0.4800 |
| 420 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 11,016 | SD |
$1.70 |
$0.4700 |
$0.5100 |
$0.5400 |
$0.4800 |
| 430 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 7,344 | SD |
$0.8000 |
$1.24 |
$1.35 |
$1.43 |
$1.28 |
| 440 | 880(C) 8848 |
WING BARRICADES | 864 | SD |
$2.00 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0200 |
| 450 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 19,656 | SD |
$0.3500 |
$0.9300 |
$1.01 |
$1.07 |
$0.9600 |
| 460 | 880(F) 8878 |
DRUMS | 20,736 | SD |
$0.2000 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0200 |
| 470 | 880(G) 8890 |
CHANNELIZER CONES | 8,640 | SD |
$0.3000 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0200 |
| 480 | 880(L) 8920 |
(SP) TRAFFIC SURVEILLANCE, OHP (NON-BIDDABLE) | 1,200 | HOUR |
$69.00 |
$69.00 |
$69.00 |
$69.00 |
$69.00 |
| 490 | 882 8360 |
(SP)SMART WORK ZONE SYSTEM | 180 | SD |
$10.00 |
$601.55 |
$580.13 |
$692.08 |
$325.00 |
| 500 | 882 8370 |
(SP)SMART WORK ZONE SYSTEM-PORTABLE CHANGEABLE MESSAGE SIGN | 7,560 | SD |
$8.40 |
$8.30 |
$8.00 |
$9.55 |
$8.52 |
| 510 | 882 8372 |
(SP)SMART WORK ZONE SYSTEM-PORTABLE TRAFFIC SENSOR (PTS) | 7,380 | SD |
$9.00 |
$8.30 |
$8.00 |
$9.55 |
$8.52 |
| 520 | 882 8374 |
(SP)SMART WORK ZONE SYSTEM-PAN-TILT-ZOOM CAMERA (PTZC) | 360 | SD |
$7.50 |
$12.45 |
$12.00 |
$14.32 |
$12.78 |
| 530 | 882 8376 |
(SP)SMART WORK ZONE SYSTEM-WEBSITE SYSTEM | 180 | SD |
$29.00 |
$8.30 |
$8.00 |
$9.55 |
$25.00 |
| 540 | 882 8378 |
(PL)SMART WORK ZONE SYSTEM SETUP | 2 | EA |
$190,000.00 |
$8,297.27 |
$8,001.82 |
$9,545.95 |
$8,520.00 |
| 550 | 882 8380 |
(PL)SMART WORK ZONE SYSTEM SPEC. SIGN & DMS | 180 | SD |
$11.00 |
$22.82 |
$22.01 |
$26.25 |
$23.43 |
| 560 | 413(C) 4868 |
RUMBLE STRIP-METHOD PCC-CON | 62,800 | LF |
$0.4500 |
$0.3200 |
$0.3100 |
$0.3700 |
$0.6000 |
| 570 | 804(A) 2915 |
STRUCTURAL CONCRETE | 9 | CY |
$780.00 |
$311.15 |
$300.07 |
$357.97 |
$319.50 |
| 580 | 804(B) 2916 |
REINFORCING STEEL | 2,338 | LB |
$1.55 |
$2.07 |
$2.00 |
$2.39 |
$2.13 |
| 590 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 19 | EA |
$65.00 |
$88.16 |
$85.02 |
$101.42 |
$90.53 |
| 600 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 9 | EA |
$210.00 |
$337.08 |
$325.07 |
$387.81 |
$346.13 |
| 610 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 125.66 | SF |
$25.00 |
$18.67 |
$18.00 |
$21.48 |
$19.17 |
| 620 | 850(B) 8112 |
EXTRUDED ALUMINUM PANEL SIGNS | 778.4 | SF |
$17.00 |
$20.74 |
$20.00 |
$23.86 |
$21.30 |
| 630 | 851(A) 3206 |
4"@13 GALV.STEEL WIDE FLANGE BEAM POST | 64 | LF |
$20.40 |
$24.89 |
$24.01 |
$28.64 |
$25.56 |
| 640 | 851(A) 3210 |
8"@31 GALV.STEEL WIDE FLANGE BEAM POST | 150 | LF |
$40.00 |
$39.41 |
$38.01 |
$45.34 |
$40.47 |
| 650 | 851(B) 3217 |
2 1/2"@5.79 GALV.STEEL PIPE POST | 64 | LF |
$17.00 |
$16.59 |
$16.00 |
$19.09 |
$17.04 |
| 660 | 851(C) 8324 |
2" SQUARE TUBE POST | 258 | LF |
$10.00 |
$7.26 |
$7.00 |
$8.35 |
$7.46 |
| 670 | 853 9024 |
DELINEATORS(TYPE 1, CODE 1) | 40 | EA |
$21.00 |
$18.67 |
$18.00 |
$21.48 |
$19.17 |
| 680 | 853 9027 |
DELINEATORS(TYPE 1, CODE 2) | 16 | EA |
$27.00 |
$22.82 |
$22.01 |
$26.25 |
$23.43 |
| 690 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 69,080 | LF |
$0.5500 |
$0.4700 |
$0.4500 |
$0.5400 |
$0.4800 |
| 700 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 2,800 | LF |
$1.40 |
$1.81 |
$1.75 |
$2.09 |
$1.86 |
| 710 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 2,800 | LF |
$2.15 |
$2.07 |
$2.00 |
$2.39 |
$2.13 |
| 720 | 856(A) 8561 |
RECESSED TRAF STRIPE(MULTI-POLY)(6" W) | 17,270 | LF |
$1.80 |
$1.30 |
$1.25 |
$1.49 |
$1.33 |
| 730 | 509(A) 0319 |
CLASS AA CONCRETE | 21.93 | CY |
$400.00 |
$311.15 |
$337.03 |
$357.97 |
$1,065.00 |
| 740 | 619(B) 5190 |
REMOVAL OF CABLE BARRIER | 15,000 | LF |
$7.50 |
$12.08 |
$10.05 |
$10.68 |
$8.52 |
| 750 | 628 5180 |
INSTALLATION OF CABLE BARRIER SYSTEM | 15,000 | LF |
$19.00 |
$3.11 |
$3.37 |
$3.58 |
$10.65 |
| 760 | 628(C) 5110 |
END ANCHORS | 6 | EA |
$3,500.00 |
$9,853.01 |
$10,672.56 |
$11,335.82 |
$8,520.00 |
| 770 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$175,500.00 |
$83,997.03 |
$79,018.01 |
$32,018.71 |
$50,951.00 |
| 780 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$6,000.00 |
$5,023.11 |
$1,685.14 |
$3,000.00 |
$6,152.00 |
| 790 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$15,000.00 |
$25,115.55 |
$1,200.27 |
$10,000.00 |
$17,207.00 |
| 800 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$612,000.00 |
$552,371.53 |
$730,013.53 |
$583,000.00 |
$699,000.00 |