| 10 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 52,040 | CY |
$8.00 |
$9.51 |
$9.92 |
$6.56 |
$14.53 |
$21.00 |
| 20 | 202(D) 0184 |
UNCLASSIFIED BORROW | 2,285 | CY |
$12.00 |
$12.33 |
$14.00 |
$8.97 |
$11.35 |
$35.00 |
| 30 | 221(K) 0600 |
TEMPORARY FIBER LOG | 67,618 | LF |
$5.00 |
$2.23 |
$2.29 |
$2.15 |
$2.61 |
$2.15 |
| 40 | 230(A) 2806 |
SOLID SLAB SODDING | 74,907 | SY |
$2.00 |
$2.23 |
$2.34 |
$2.15 |
$2.61 |
$2.15 |
| 50 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 41,846 | CY |
$55.00 |
$33.31 |
$35.23 |
$38.61 |
$44.38 |
$59.00 |
| 60 | 307(K) 4300 |
STABILIZED SUBGRADE | 231,071 | SY |
$5.00 |
$4.67 |
$5.14 |
$4.26 |
$4.38 |
$5.50 |
| 70 | 326(A) 0100 |
GEOTEXTILE REINFORCEMENT | 225,140 | SY |
$4.00 |
$3.69 |
$4.02 |
$6.60 |
$6.65 |
$6.00 |
| 80 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 51,456 | TON |
$25.00 |
$17.56 |
$19.26 |
$20.08 |
$20.60 |
$22.00 |
| 90 | 408 5774 |
PRIME COAT | 134,023 | GAL |
$3.50 |
$0.2500 |
$0.2500 |
$1.00 |
$0.2500 |
$1.60 |
| 100 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 33,715 | TON |
$75.00 |
$67.57 |
$67.63 |
$69.89 |
$84.13 |
$65.30 |
| 110 | 412 5267 |
COLD MILLING PAVEMENT | 21,575 | SY |
$2.50 |
$3.42 |
$2.24 |
$1.23 |
$2.29 |
$5.25 |
| 120 | 414(A) 0210 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 103,045 | SY |
$15.00 |
$5.69 |
$6.00 |
$3.41 |
$13.49 |
$14.25 |
| 130 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 99,827 | SY |
$25.00 |
$10.53 |
$10.48 |
$15.61 |
$20.66 |
$16.00 |
| 140 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 61,887 | CY |
$115.00 |
$101.49 |
$92.00 |
$90.85 |
$105.25 |
$105.00 |
| 150 | 513(E) 6030 |
EARLY STRENGTH CONCRETE | 500 | CY |
$32.00 |
$181.08 |
$120.00 |
$348.19 |
$196.86 |
$350.00 |
| 160 | 611(L) 0487 |
JUNCTION BOXES | 24 | CF |
$200.00 |
$268.34 |
$382.91 |
$41.81 |
$177.21 |
$240.00 |
| 170 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 1,448 | LF |
$45.00 |
$50.72 |
$28.99 |
$52.08 |
$48.02 |
$48.00 |
| 180 | 613(J) 5915 |
EDGE DRAIN CONDUIT-PERFORATED | 66,446 | LF |
$7.00 |
$4.10 |
$5.80 |
$5.88 |
$7.33 |
$8.50 |
| 190 | 613(K) 5916 |
EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 2,711 | LF |
$10.00 |
$12.29 |
$8.04 |
$5.62 |
$18.15 |
$14.00 |
| 200 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 5 | EA |
$1,300.00 |
$1,561.38 |
$2,407.60 |
$848.10 |
$2,145.51 |
$2,500.00 |
| 210 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 222 | EA |
$350.00 |
$461.06 |
$435.88 |
$133.70 |
$325.53 |
$375.00 |
| 220 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 37,619 | SY |
$8.00 |
$2.82 |
$8.10 |
$4.65 |
$4.24 |
$7.75 |
| 230 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 59,205 | SY |
$3.00 |
$3.63 |
$5.30 |
$5.16 |
$3.38 |
$6.25 |
| 240 | 619(B) 4763 |
REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY | 88,595 | SY |
$7.00 |
$4.99 |
$8.10 |
$6.34 |
$6.67 |
$12.00 |
| 250 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 3,892 | LF |
$3.00 |
$4.62 |
$3.73 |
$1.40 |
$5.40 |
$3.50 |
| 260 | 619(C) 0924 |
SAWING PAVEMENT | 8,091 | LF |
$4.00 |
$1.93 |
$3.00 |
$2.08 |
$2.51 |
$5.00 |
| 270 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 3,350 | LF |
$20.00 |
$25.00 |
$23.96 |
$24.10 |
$29.23 |
$22.50 |
| 280 | 623(F) 8300 |
GUARDRAIL TRAIL END TURNDOWN (31") | 2 | EA |
$1,000.00 |
$1,768.74 |
$878.63 |
$1,705.31 |
$2,068.39 |
$825.00 |
| 290 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 8 | EA |
$2,500.00 |
$3,371.51 |
$2,822.25 |
$3,250.59 |
$3,942.68 |
$2,650.00 |
| 300 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 6 | EA |
$1,900.00 |
$2,925.43 |
$1,970.25 |
$2,820.51 |
$3,421.03 |
$1,850.00 |
| 305 | 625(D) 1254 |
REMOVE AND RECONSTRUCT GUARDRAIL | 1,476 | LF |
$30.00 |
$17.52 |
$27.69 |
$16.89 |
$20.49 |
$22.50 |
| 310 | 853 9066 |
GUARDRAIL DELINEATORS(TYPE 1, CODE 1) | 76 | EA |
$11.00 |
$13.75 |
$15.98 |
$13.25 |
$16.07 |
$15.00 |
| 320 | 884(B) 8421 |
BRIDGE PARAPET RETROFIT | 80 | LF |
$230.00 |
$236.96 |
$441.54 |
$87.90 |
$391.43 |
$650.00 |
| 330 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 15,200 | LF |
$0.5500 |
$0.7300 |
$0.7500 |
$0.7000 |
$0.8500 |
$1.50 |
| 340 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 1,000 | LF |
$0.1500 |
$1.24 |
$1.28 |
$1.20 |
$1.46 |
$1.00 |
| 350 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 9,000 | LF |
$0.6000 |
$1.14 |
$1.17 |
$1.10 |
$1.33 |
$2.00 |
| 360 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 4,078 | EA |
$0.5500 |
$0.6400 |
$0.6600 |
$0.6200 |
$0.7500 |
$0.5000 |
| 370 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 12,320 | LF |
$0.1500 |
$0.8800 |
$0.9100 |
$0.8500 |
$1.03 |
$0.5000 |
| 380 | 858(A) 8911 |
PAVEMENT MARKERS CLASS A TYPE 2-C | 1,700 | EA |
$5.75 |
$4.67 |
$4.79 |
$4.50 |
$5.46 |
$7.50 |
| 390 | 858(A) 8914 |
PAVEMENT MARKERS CLASS A TYPE 2-D | 600 | EA |
$5.75 |
$4.67 |
$4.79 |
$4.50 |
$5.46 |
$7.50 |
| 400 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 900 | SD |
$15.00 |
$6.22 |
$6.39 |
$6.00 |
$7.28 |
$10.00 |
| 410 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 24,800 | LF |
$25.00 |
$23.77 |
$14.53 |
$9.62 |
$16.45 |
$40.00 |
| 420 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 32,050 | LF |
$3.00 |
$5.04 |
$2.53 |
$2.41 |
$2.49 |
$5.00 |
| 430 | 878(B) 8487 |
MODULAR GLARE SCREEN (TEMPORARY) | 28,800 | SD |
$0.1000 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.8500 |
| 440 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 600 | SD |
$4.50 |
$1.04 |
$1.07 |
$1.00 |
$1.21 |
$25.00 |
| 450 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 44,100 | SD |
$0.3500 |
$0.2900 |
$0.3000 |
$0.3100 |
$0.3400 |
$0.3500 |
| 460 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 14,400 | SD |
$0.5500 |
$0.2900 |
$0.3000 |
$0.3100 |
$0.3400 |
$0.3500 |
| 470 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 13,200 | SD |
$1.45 |
$8.30 |
$8.52 |
$8.97 |
$9.70 |
$1.00 |
| 475 | 880(B) 8830 |
VARIABLE SPEED LIMIT SIGN | 4,200 | SD |
$10.50 |
$6.22 |
$6.39 |
$6.00 |
$7.28 |
$15.00 |
| 480 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 12,600 | SD |
$0.7500 |
$0.1600 |
$0.1600 |
$0.1500 |
$0.1800 |
$0.5000 |
| 490 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 28,800 | SD |
$0.3500 |
$0.7800 |
$0.8000 |
$0.7500 |
$0.9100 |
$1.00 |
| 500 | 880(F) 8878 |
DRUMS | 67,200 | SD |
$0.2000 |
$0.0500 |
$0.0500 |
$0.0500 |
$0.0600 |
$0.5500 |
| 510 | 880(G) 8890 |
CHANNELIZER CONES | 10,800 | SD |
$0.3000 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.5500 |
| 520 | 880(L) 8920 |
(SP) TRAFFIC SURVEILLANCE, OHP (NON-BIDDABLE) | 2,000 | HOUR |
$69.00 |
$69.00 |
$69.00 |
$69.00 |
$69.00 |
$69.00 |
| 530 | 882 8360 |
(SP)SMART WORK ZONE SYSTEM | 300 | SD |
$10.00 |
$20.75 |
$21.30 |
$20.00 |
$24.26 |
$300.00 |
| 540 | 882 8370 |
(SP)SMART WORK ZONE SYSTEM-PORTABLE CHANGEABLE MESSAGE SIGN | 10,200 | SD |
$10.50 |
$12.45 |
$12.78 |
$12.00 |
$14.56 |
$6.00 |
| 550 | 882 8372 |
(SP)SMART WORK ZONE SYSTEM-PORTABLE TRAFFIC SENSOR (PTS) | 15,000 | SD |
$9.25 |
$12.45 |
$12.78 |
$12.00 |
$14.56 |
$6.00 |
| 560 | 882 8374 |
(SP)SMART WORK ZONE SYSTEM-PAN-TILT-ZOOM CAMERA (PTZC) | 600 | SD |
$9.50 |
$20.75 |
$21.30 |
$20.00 |
$24.26 |
$10.00 |
| 570 | 882 8376 |
(SP)SMART WORK ZONE SYSTEM-WEBSITE SYSTEM | 300 | SD |
$37.00 |
$20.75 |
$21.30 |
$20.00 |
$24.26 |
$250.00 |
| 580 | 882 8378 |
(PL)SMART WORK ZONE SYSTEM SETUP | 2 | EA |
$275,000.00 |
$31,121.60 |
$31,950.00 |
$30,005.42 |
$36,393.92 |
$2,500.00 |
| 590 | 413(C) 4868 |
RUMBLE STRIP-METHOD PCC-CON | 140,000 | LF |
$0.1500 |
$0.5500 |
$0.6000 |
$1.02 |
$0.4200 |
$0.5300 |
| 600 | 804(A) 2915 |
STRUCTURAL CONCRETE | 17.06 | CY |
$700.00 |
$311.22 |
$319.50 |
$300.05 |
$363.94 |
$400.00 |
| 610 | 804(B) 2916 |
REINFORCING STEEL | 4,380 | LB |
$1.50 |
$2.07 |
$2.13 |
$2.00 |
$2.43 |
$2.00 |
| 620 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 61 | EA |
$60.00 |
$88.18 |
$90.53 |
$85.02 |
$103.12 |
$50.00 |
| 630 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 30 | EA |
$185.00 |
$274.91 |
$282.23 |
$265.05 |
$321.48 |
$500.00 |
| 640 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 415.72 | SF |
$23.00 |
$20.75 |
$21.30 |
$20.00 |
$24.26 |
$18.00 |
| 650 | 850(B) 8112 |
EXTRUDED ALUMINUM PANEL SIGNS | 1,901 | SF |
$18.00 |
$22.82 |
$23.43 |
$22.00 |
$26.69 |
$45.00 |
| 660 | 851(A) 3206 |
4"@13 GALV.STEEL WIDE FLANGE BEAM POST | 190 | LF |
$21.00 |
$22.82 |
$23.43 |
$22.00 |
$26.69 |
$45.00 |
| 670 | 851(A) 3207 |
6"@15 GALV.STEEL WIDE FLANGE BEAM POST | 160 | LF |
$23.00 |
$24.90 |
$25.56 |
$24.00 |
$29.11 |
$55.00 |
| 680 | 851(A) 3212 |
8"@40 GALV.STEEL WIDE FLANGE BEAM POST | 186 | LF |
$50.00 |
$43.57 |
$44.73 |
$42.01 |
$50.95 |
$65.00 |
| 690 | 851(B) 3218 |
3"@7.58 GALV.STEEL PIPE POST | 56 | LF |
$27.00 |
$16.60 |
$17.04 |
$16.00 |
$19.41 |
$25.00 |
| 700 | 851(C) 8324 |
2" SQUARE TUBE POST | 807 | LF |
$9.40 |
$8.30 |
$8.52 |
$8.00 |
$9.70 |
$10.00 |
| 710 | 853 9024 |
DELINEATORS(TYPE 1, CODE 1) | 64 | EA |
$17.00 |
$29.05 |
$29.82 |
$28.01 |
$33.96 |
$15.00 |
| 720 | 853 9027 |
DELINEATORS(TYPE 1, CODE 2) | 80 | EA |
$25.00 |
$31.12 |
$31.95 |
$30.01 |
$36.39 |
$15.00 |
| 730 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 153,700 | LF |
$0.5500 |
$0.5700 |
$0.5900 |
$0.5500 |
$0.6300 |
$0.3500 |
| 740 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 3,000 | LF |
$1.20 |
$0.9100 |
$0.9400 |
$0.8800 |
$1.03 |
$2.00 |
| 750 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 1,200 | LF |
$2.45 |
$1.04 |
$1.07 |
$1.00 |
$1.21 |
$4.00 |
| 760 | 856(A) 8561 |
RECESSED TRAF STRIPE(MULTI-POLY)(6" W) | 38,400 | LF |
$1.30 |
$1.09 |
$1.12 |
$1.05 |
$1.21 |
$1.00 |
| 770 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$55,000.00 |
$114,688.88 |
$51,964.00 |
$168,263.34 |
$74,000.97 |
$116,000.00 |
| 780 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$6,000.00 |
$5,021.57 |
$5,288.61 |
$3,365.27 |
$3,032.82 |
$7,500.00 |
| 790 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$15,000.00 |
$25,107.85 |
$17,961.00 |
$1,200.22 |
$10,000.00 |
$15,000.00 |
| 800 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$1,200,000.00 |
$846,449.95 |
$795,902.52 |
$797,299.02 |
|
|