| 10 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$8,000.00 |
$10,000.00 |
$25,000.00 |
$16,250.00 |
$12,500.00 |
$4,186.65 |
| 20 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 873 | CY |
$15.00 |
$20.00 |
$15.00 |
$16.00 |
$25.00 |
$16.75 |
| 30 | 202(D) 0184 |
UNCLASSIFIED BORROW | 100 | CY |
$12.00 |
$25.00 |
$40.00 |
$15.00 |
$35.00 |
$16.75 |
| 40 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,000.00 |
$7,000.00 |
$3,500.00 |
$8,681.00 |
$6,000.00 |
$6,977.75 |
| 50 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,621 | LF |
$3.00 |
$4.00 |
$2.48 |
$2.65 |
$2.72 |
$3.46 |
| 60 | 221(F) 0100 |
TEMPORARY SILT DIKE | 42 | LF |
$12.00 |
$11.00 |
$19.89 |
$21.10 |
$22.00 |
$27.76 |
| 70 | 230(A) 2806 |
SOLID SLAB SODDING | 5,075 | SY |
$3.00 |
$7.00 |
$2.59 |
$2.75 |
$2.98 |
$3.61 |
| 80 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.86 | AC |
$1,200.00 |
$500.00 |
$2,150.00 |
$2,279.00 |
$1,000.00 |
$3,000.43 |
| 90 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 536 | CY |
$75.00 |
$77.00 |
$80.00 |
$93.60 |
$85.00 |
$139.56 |
| 100 | 307(K) 4300 |
STABILIZED SUBGRADE | 3,799 | SY |
$6.50 |
$7.00 |
$7.00 |
$13.60 |
$7.70 |
$20.10 |
| 110 | 325 5271 |
SEPARATOR FABRIC | 2,978 | SY |
$2.50 |
$1.50 |
$1.50 |
$3.00 |
$2.00 |
$4.47 |
| 120 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 153 | TON |
$40.00 |
$47.00 |
$47.00 |
$88.30 |
$52.00 |
$42.74 |
| 130 | 407(B) 0250 |
TACK COAT | 478 | GAL |
$3.50 |
$4.00 |
$4.00 |
$3.55 |
$4.40 |
$5.30 |
| 140 | 408 5774 |
PRIME COAT | 2,149 | GAL |
$4.00 |
$6.00 |
$6.00 |
$6.60 |
$6.60 |
$5.93 |
| 150 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 779 | TON |
$80.00 |
$78.00 |
$78.00 |
$76.40 |
$89.70 |
$140.95 |
| 160 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 375 | TON |
$100.00 |
$100.00 |
$100.00 |
$97.00 |
$115.00 |
$166.07 |
| 170 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$375.00 |
$500.00 |
$275.00 |
$483.50 |
$350.00 |
$575.20 |
| 180 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 99 | SY |
$75.00 |
$92.00 |
$92.00 |
$116.50 |
$125.00 |
$81.05 |
| 190 | 613(EE) 5610 |
(SP) 18" CORRUGATED POLYPROPYLENE PIPE | 98 | LF |
$50.00 |
$52.50 |
$50.00 |
$49.70 |
$40.00 |
$93.43 |
| 200 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$1,000.00 |
$779.50 |
$250.00 |
$418.50 |
$285.00 |
$291.44 |
| 210 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$20,000.00 |
$3,000.00 |
$7,618.00 |
$3,750.00 |
$5,372.87 |
| 220 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 1,966 | SY |
$8.00 |
$7.00 |
$8.00 |
$6.95 |
$10.00 |
$6.98 |
| 230 | 619(C) 0924 |
SAWING PAVEMENT | 277 | LF |
$7.00 |
$6.00 |
$6.00 |
$6.70 |
$8.00 |
$5.58 |
| 240 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 1 | EA |
$300.00 |
$500.00 |
$350.00 |
$1,155.00 |
$165.00 |
$174.45 |
| 250 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 110 | LF |
$90.00 |
$75.00 |
$145.00 |
$154.00 |
$188.00 |
$189.00 |
| 260 | 508 6359 |
PRECAST ARCH CULVERT | 36 | LF |
$11,650.00 |
$14,000.00 |
$15,740.00 |
$15,195.00 |
$17,100.00 |
$16,943.07 |
| 270 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 355 | TON |
$60.00 |
$42.00 |
$50.00 |
$59.40 |
$56.50 |
$62.92 |
| 280 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 35 | TON |
$60.00 |
$38.00 |
$42.00 |
$53.80 |
$44.50 |
$46.63 |
| 290 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 72 | LF |
$30.00 |
$65.00 |
$35.00 |
$55.30 |
$30.00 |
$13.82 |
| 300 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 32 | LF |
$30.00 |
$65.00 |
$35.00 |
$26.40 |
$45.00 |
$19.47 |
| 310 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$15,000.00 |
$9,500.00 |
$14,210.00 |
$11,500.00 |
$9,071.07 |
| 320 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 62.5 | LF |
$20.00 |
$50.00 |
$17.50 |
$18.60 |
$19.25 |
$24.42 |
| 330 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 3 | EA |
$3,000.00 |
$2,550.00 |
$2,225.00 |
$2,358.00 |
$2,447.50 |
$3,105.10 |
| 340 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$2,200.00 |
$1,850.00 |
$1,800.00 |
$1,908.00 |
$1,980.00 |
$2,511.99 |
| 350 | 853 9030 |
DELINEATORS(TYPE 1, CODE 3) | 4 | EA |
$20.00 |
$25.00 |
$18.00 |
$19.10 |
$19.80 |
$25.12 |
| 360 | 853 9033 |
DELINEATORS(TYPE 2, CODE 1) | 12 | EA |
$15.00 |
$25.00 |
$13.00 |
$13.80 |
$14.30 |
$18.14 |
| 370 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 15 | LF |
$6.00 |
$6.00 |
$3.00 |
$2.55 |
$2.64 |
$3.35 |
| 380 | 855(A) 8840 |
TRAFFIC STRIPE(PLASTIC)(THIN LINE)(4" WIDE) | 4,251 | LF |
$0.4000 |
$0.8000 |
$0.5500 |
$0.5400 |
$0.5600 |
$0.7100 |
| 390 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 900 | SD |
$0.6500 |
$0.5000 |
$0.2200 |
$0.2100 |
$0.2200 |
$0.2800 |
| 400 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 600 | SD |
$0.9000 |
$2.00 |
$1.89 |
$1.85 |
$1.93 |
$2.44 |
| 410 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 1,500 | SD |
$0.6000 |
$1.00 |
$0.3800 |
$0.3700 |
$0.3900 |
$0.4900 |
| 420 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 3,600 | SD |
$2.00 |
$0.1000 |
$0.0500 |
$0.0500 |
$0.0600 |
$0.0700 |
| 430 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$8,500.00 |
$5,200.00 |
$5,466.00 |
$3,900.00 |
$7,256.86 |
| 440 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$4,000.00 |
$1,275.00 |
$2,320.00 |
$5,300.00 |
$2,093.32 |
| 450 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$64,300.00 |
$80,427.19 |
$72,000.00 |
$47,514.51 |
$61,500.00 |
$94,074.03 |