| 10 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$8,000.00 |
$5,000.00 |
$7,250.00 |
$5,500.00 |
$6,000.00 |
| 20 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 3,707 | CY |
$6.25 |
$6.00 |
$7.15 |
$7.00 |
$8.75 |
| 30 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,465 | CY |
$10.00 |
$10.00 |
$8.65 |
$11.00 |
$11.75 |
| 40 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,000.00 |
$3,500.00 |
$6,000.00 |
$7,500.00 |
$4,000.00 |
| 50 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,000 | LF |
$2.00 |
$2.45 |
$1.30 |
$2.55 |
$2.00 |
| 60 | 221(F) 0100 |
TEMPORARY SILT DIKE | 224 | LF |
$9.50 |
$8.50 |
$5.00 |
$9.00 |
$7.50 |
| 70 | 230(A) 2806 |
SOLID SLAB SODDING | 8,292 | SY |
$3.25 |
$3.95 |
$4.35 |
$4.15 |
$3.00 |
| 80 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.71 | AC |
$1,200.00 |
$495.00 |
$250.00 |
$495.00 |
$250.00 |
| 90 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 880 | TON |
$38.00 |
$33.15 |
$38.55 |
$40.00 |
$38.50 |
| 100 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$300.00 |
$250.00 |
$295.00 |
$300.00 |
$200.00 |
| 110 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 64 | LF |
$36.00 |
$28.00 |
$38.00 |
$65.00 |
$60.00 |
| 120 | 613(B) 4529 |
35" X 24" CORR. GALV. STEEL PIPE ARCH | 192 | LF |
$42.00 |
$44.00 |
$53.00 |
$80.00 |
$85.00 |
| 130 | 613(M) 7150 |
TYPE A3 CULVERT END TREATMENT | 2 | EA |
$1,200.00 |
$2,000.00 |
$1,000.00 |
$1,400.00 |
$2,500.00 |
| 140 | 613(M) 7151 |
TYPE B3 CULVERT END TREATMENT | 6 | EA |
$1,450.00 |
$2,000.00 |
$1,350.00 |
$1,600.00 |
$1,400.00 |
| 150 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$3,800.00 |
$25,000.00 |
$2,750.00 |
$2,500.00 |
$3,500.00 |
| 160 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 292 | CY |
$12.00 |
$10.00 |
$9.25 |
$15.00 |
$25.00 |
| 170 | 501(F) 6352 |
GRANULAR BACKFILL | 148 | CY |
$70.00 |
$50.00 |
$77.00 |
$98.00 |
$78.00 |
| 180 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 213 | LF |
$88.00 |
$40.00 |
$82.00 |
$95.00 |
$85.00 |
| 190 | 506(A) 1322 |
STRUCTURAL STEEL | 6,010 | LB |
$6.00 |
$1.00 |
$7.50 |
$7.00 |
$6.00 |
| 200 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 5 | EA |
$1,050.00 |
$1,000.00 |
$1,292.00 |
$1,500.00 |
$825.00 |
| 210 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 5 | EA |
$1,050.00 |
$1,000.00 |
$1,292.00 |
$1,500.00 |
$825.00 |
| 220 | 509(A) 1326 |
CLASS AA CONCRETE | 47.5 | CY |
$680.00 |
$500.00 |
$692.50 |
$775.00 |
$525.00 |
| 230 | 509(B) 1328 |
CLASS A CONCRETE | 145.4 | CY |
$610.00 |
$500.00 |
$632.50 |
$600.00 |
$500.00 |
| 240 | 511(A) 1332 |
REINFORCING STEEL | 32,530 | LB |
$1.00 |
$2.10 |
$1.23 |
$1.35 |
$1.18 |
| 250 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 80 | LF |
$32.00 |
$45.00 |
$77.00 |
$60.00 |
$42.00 |
| 260 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 180 | LF |
$38.00 |
$50.00 |
$87.50 |
$80.00 |
$50.00 |
| 270 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 80 | LF |
$18.00 |
$10.00 |
$33.00 |
$10.00 |
$20.50 |
| 280 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 30 | LF |
$25.00 |
$10.00 |
$37.50 |
$10.00 |
$24.00 |
| 290 | 514(K) 6260 |
(PL)PILOT HOLES | 150 | LF |
$178.00 |
$250.00 |
$150.00 |
$165.00 |
$150.00 |
| 300 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 310 | 535 6225 |
HAUL AND ERECT STEEL BEAMS | 1 | LSUM |
$15,000.00 |
$20,000.00 |
$14,000.00 |
$18,000.00 |
$10,000.00 |
| 320 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 993 | TON |
$48.00 |
$42.10 |
$49.15 |
$56.00 |
$46.00 |
| 330 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 332 | TON |
$40.00 |
$33.12 |
$39.90 |
$44.00 |
$36.00 |
| 340 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 52 | LF |
$30.00 |
$75.00 |
$31.00 |
$45.00 |
$75.00 |
| 350 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 60 | LF |
$30.00 |
$75.00 |
$31.00 |
$45.00 |
$75.00 |
| 360 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$75.00 |
$4,500.00 |
$9,500.00 |
$5,000.00 |
| 370 | 623(A) 1418 |
BEAM GUARDRAIL W-BEAM SINGLE | 87.5 | LF |
$27.50 |
$25.00 |
$27.50 |
$25.00 |
$28.00 |
| 380 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$2,250.00 |
$2,300.00 |
$2,530.00 |
$2,300.00 |
$2,000.00 |
| 390 | 623(F) 6029 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 3 | EA |
$1,300.00 |
$2,250.00 |
$2,475.00 |
$2,250.00 |
$2,000.00 |
| 400 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 13,200 | SD |
$0.7500 |
$0.0500 |
$0.0600 |
$0.0500 |
$0.4500 |
| 410 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,200 | SD |
$0.7000 |
$0.0500 |
$0.0600 |
$0.0500 |
$1.20 |
| 420 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 840 | SD |
$1.19 |
$0.0500 |
$0.0600 |
$1.00 |
$2.00 |
| 430 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 1,920 | SD |
$0.5000 |
$0.0500 |
$0.0600 |
$0.2000 |
$15.00 |
| 440 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 5,880 | SD |
$0.1000 |
$0.0500 |
$0.0600 |
$0.0500 |
$15.00 |
| 450 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$6,500.00 |
$7,500.00 |
$6,600.00 |
$5,600.00 |
$6,650.00 |
| 460 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$2,500.00 |
$1,000.00 |
$1,750.00 |
$1,500.00 |
$3,000.00 |
| 470 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$52,000.00 |
$60,000.00 |
$53,800.00 |
$58,000.00 |
$48,334.59 |