| 10 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$9,129.60 |
$2,400.00 |
$7,500.00 |
$25,000.00 |
$7,500.00 |
| 20 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 250 | CY |
$20.00 |
$26.17 |
$12.00 |
$25.00 |
$55.00 |
$20.00 |
| 30 | 202(D) 0184 |
UNCLASSIFIED BORROW | 250 | CY |
$25.00 |
$26.78 |
$19.00 |
$18.00 |
$65.00 |
$25.00 |
| 40 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,344 | LF |
$4.00 |
$3.58 |
$3.00 |
$4.00 |
$3.00 |
$5.00 |
| 50 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 8 | EA |
$250.00 |
$378.57 |
$250.00 |
$350.00 |
$150.00 |
$100.00 |
| 60 | 230(A) 2806 |
SOLID SLAB SODDING | 856 | SY |
$6.00 |
$17.03 |
$5.00 |
$8.00 |
$8.00 |
$7.00 |
| 70 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 235 | CY |
$75.00 |
$46.13 |
$100.00 |
$70.00 |
$65.00 |
$75.00 |
| 80 | 609(A) 0300 |
CONCRETE CURB (6" BARRIER-INTEGRAL) | 170 | LF |
$30.00 |
$37.74 |
$24.00 |
$27.00 |
$71.00 |
$45.00 |
| 90 | 609(B) 1524 |
2'-8" COMB. CURB & GUTTER (6" MNTBLE) | 81 | LF |
$40.00 |
$39.43 |
$54.00 |
$45.00 |
$53.00 |
$75.00 |
| 100 | 609(B) 1525 |
2'-8" COMB. CURB & GUTTER (6" BARRIER) | 319 | LF |
$40.00 |
$39.77 |
$54.00 |
$45.00 |
$65.00 |
$70.00 |
| 110 | 610(A) 0602 |
4" CONCRETE SIDEWALK | 679 | SY |
$65.00 |
$61.13 |
$92.00 |
$55.00 |
$90.00 |
$90.00 |
| 120 | 610(A) 0605 |
6" CONCRETE SIDEWALK | 95 | SY |
$85.00 |
$70.49 |
$92.00 |
$80.00 |
$108.00 |
$100.00 |
| 130 | 610(B) 5016 |
8" CONCRETE DRIVEWAY | 296 | SY |
$85.00 |
$79.52 |
$126.00 |
$90.00 |
$150.00 |
$130.00 |
| 140 | 610(I) 4610 |
TACTILE WARNING DEVICE-NEW | 120 | SF |
$50.00 |
$16.98 |
$40.00 |
$50.00 |
$25.00 |
$45.00 |
| 150 | 611(I) 4489 |
REPLACEMENT OF INLET FRM&GRT (SSIF-FRM,CIG-GRT-RVG-F) | 5 | EA |
$1,000.00 |
$852.10 |
$1,500.00 |
$850.00 |
$1,150.00 |
$950.00 |
| 160 | 612(E) 0647 |
VALVE BOXES ADJUST TO GRADE | 1 | EA |
$500.00 |
$310.41 |
$800.00 |
$1,200.00 |
$600.00 |
$500.00 |
| 170 | 612(F) 0648 |
METER BOXES ADJUST TO GRADE | 6 | EA |
$500.00 |
$432.14 |
$375.00 |
$1,200.00 |
$500.00 |
$500.00 |
| 180 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$9,129.60 |
$8,000.00 |
$15,000.00 |
$10,000.00 |
$5,000.00 |
| 190 | 619(B) 4726 |
REMOVAL OF CURB AND GUTTER | 360 | LF |
$12.00 |
$12.78 |
$10.00 |
$12.00 |
$8.00 |
$30.00 |
| 200 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 769 | SY |
$20.00 |
$15.22 |
$10.00 |
$12.00 |
$15.00 |
$30.00 |
| 210 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 136 | SY |
$15.00 |
$15.82 |
$7.00 |
$20.00 |
$44.00 |
$15.00 |
| 220 | 619(B) 6068 |
REMOVAL OF EXISTING RETAINING WALL | 170 | LF |
$15.00 |
$30.43 |
$8.00 |
$90.00 |
$17.00 |
$35.00 |
| 230 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 8 | EA |
$200.00 |
$243.46 |
$50.00 |
$250.00 |
$55.00 |
$500.00 |
| 240 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 50 | SF |
$35.00 |
$43.82 |
$25.00 |
$36.00 |
$30.00 |
$40.00 |
| 250 | 851(C) 8324 |
2" SQUARE TUBE POST | 55 | LF |
$15.00 |
$8.52 |
$10.00 |
$7.00 |
$11.00 |
$18.00 |
| 260 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 144 | LF |
$15.00 |
$34.08 |
$24.00 |
$28.00 |
$26.00 |
$35.00 |
| 270 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 216 | LF |
$2.00 |
$9.74 |
$1.00 |
$8.00 |
$1.00 |
$4.00 |
| 280 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 450 | SD |
$0.3200 |
$0.7300 |
$0.5000 |
$0.6000 |
$0.5000 |
$7.00 |
| 290 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 90 | SD |
$0.3500 |
$0.7300 |
$2.00 |
$0.6000 |
$2.20 |
$12.00 |
| 300 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 90 | SD |
$0.9500 |
$3.65 |
$5.00 |
$3.00 |
$5.50 |
$12.00 |
| 310 | 880(F) 8878 |
DRUMS | 450 | SD |
$0.1700 |
$3.47 |
$1.00 |
$2.85 |
$1.10 |
$5.00 |
| 320 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,000.00 |
$7,303.68 |
$5,430.36 |
$15,000.00 |
$6,000.00 |
$10,000.00 |
| 330 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$25,000.00 |
$24,802.08 |
$24,000.00 |
$40,000.00 |
$20,000.00 |
$35,000.00 |