| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 1,670 | CY |
$14.00 |
$8.00 |
$18.50 |
$15.20 |
$22.20 |
$15.00 |
$35.73 |
$33.00 |
| 2 | 202(D) 0184 |
UNCLASSIFIED BORROW | 100 | CY |
$50.00 |
$16.00 |
$25.50 |
$25.00 |
$22.20 |
$25.00 |
$12.00 |
$48.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 625 | LF |
$3.50 |
$5.27 |
$3.50 |
$2.10 |
$5.55 |
$4.75 |
$3.60 |
$3.00 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 40 | LF |
$14.00 |
$42.57 |
$10.00 |
$10.40 |
$33.30 |
$25.00 |
$35.67 |
$15.00 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 2,000 | SY |
$4.00 |
$6.58 |
$4.50 |
$2.30 |
$8.88 |
$6.00 |
$2.24 |
$4.50 |
| 6 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 150 | TON |
$50.00 |
$45.00 |
$68.00 |
$116.00 |
$55.50 |
$47.75 |
$60.09 |
$65.00 |
| 7 | 407(B) 0250 |
TACK COAT | 22 | GAL |
$50.00 |
$16.50 |
$50.00 |
$4.05 |
$16.65 |
$17.00 |
$14.90 |
$7.30 |
| 8 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 79 | TON |
$200.00 |
$310.20 |
$255.00 |
$260.00 |
$228.66 |
$370.00 |
$103.53 |
$385.00 |
| 9 | 509(D) 0325 |
CLASS C CONCRETE | 22 | CY |
$400.00 |
$400.00 |
$250.00 |
$543.00 |
$228.54 |
$450.00 |
$532.26 |
$585.00 |
| 10 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 24 | TON |
$60.00 |
$75.00 |
$34.00 |
$189.50 |
$81.06 |
$110.00 |
$85.57 |
$108.00 |
| 11 | 611(G) 5709 |
INLET CDI RCP DES. 6 | 1 | EA |
$4,500.00 |
$2,300.00 |
$580.00 |
$9,301.00 |
$4,440.00 |
$8,000.00 |
$4,799.79 |
$4,000.00 |
| 12 | 611(H) 5541 |
ADD'L DEPTH IN INLET CDI RCB DES. 6 | 12.21 | VF |
$600.00 |
$90.00 |
$55.00 |
$344.00 |
$388.50 |
$332.00 |
$437.20 |
$475.00 |
| 13 | 613(A) 0587 |
48" R.C.PIPE CLASS IV | 120 | LF |
$175.00 |
$163.00 |
$188.50 |
$169.50 |
$136.21 |
$230.00 |
$164.02 |
$217.00 |
| 14 | 613(L) 5738 |
48" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$3,600.00 |
$2,250.00 |
$3,875.00 |
$3,904.00 |
$3,127.03 |
$3,000.00 |
$2,071.98 |
$2,300.00 |
| 15 | 613(R) 1185 |
STANDARD BEDDING MATERIAL, CLASS A | 157 | CY |
$110.00 |
$175.00 |
$215.00 |
$2.55 |
$165.35 |
$95.00 |
$162.23 |
$90.00 |
| 16 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$7,500.00 |
$3,000.00 |
$8,000.00 |
$10,805.00 |
$12,876.00 |
$15,000.00 |
$11,232.69 |
$17,000.00 |
| 17 | 619(B) 5881 |
REMOVAL OF CONCRETE DITCH LINER | 82 | LF |
$15.00 |
$15.00 |
$20.00 |
$87.80 |
$34.52 |
$35.00 |
$21.88 |
$35.00 |
| 18 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 211 | LF |
$1.00 |
$17.33 |
$18.00 |
$18.20 |
$3.33 |
$4.00 |
$18.52 |
$24.00 |
| 19 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$1,578.50 |
$1,650.00 |
$1,653.00 |
$4,995.00 |
$6,000.00 |
$1,527.60 |
$2,000.00 |
| 20 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$5,000.00 |
$4,290.00 |
$2,500.00 |
$1,959.00 |
$4,995.00 |
$6,500.00 |
$1,809.71 |
$4,500.00 |
| 21 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$15,000.00 |
$15,500.00 |
$12,580.00 |
$32,230.00 |
$16,744.35 |
$20,000.00 |
$30,124.42 |
$7,500.00 |