| 10 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$40,000.00 |
$194,000.00 |
$20,000.00 |
| 20 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 32,428 | CY |
$8.00 |
$5.00 |
$5.50 |
| 30 | 202(C) 0182 |
ROCK EXCAVATION | 500 | CY |
$20.00 |
$10.00 |
$30.00 |
| 40 | 202(D) 0184 |
UNCLASSIFIED BORROW | 139,089 | CY |
$10.00 |
$6.40 |
$8.50 |
| 50 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$25,000.00 |
$30,000.00 |
$30,000.00 |
| 60 | 221(C) 2801 |
TEMPORARY SILT FENCE | 26,870 | LF |
$2.50 |
$4.00 |
$3.50 |
| 70 | 221(F) 0100 |
TEMPORARY SILT DIKE | 266 | LF |
$12.00 |
$20.00 |
$10.00 |
| 80 | 221(G) 0151 |
TEMPORARY ROCK FILTER DAM TYPE 2 | 205 | CY |
$95.00 |
$130.00 |
$40.00 |
| 90 | 230(A) 2806 |
SOLID SLAB SODDING | 54,280 | SY |
$2.00 |
$4.00 |
$3.25 |
| 100 | 232(B) 2814 |
SEEDING METHOD B | 9.03 | AC |
$675.00 |
$250.00 |
$800.00 |
| 110 | 233(A) 2817 |
VEGETATIVE MULCHING | 9.03 | AC |
$550.00 |
$250.00 |
$770.00 |
| 120 | 241 2832 |
MOWING | 18.06 | AC |
$120.00 |
$100.00 |
$400.00 |
| 130 | 303(A) 2200 |
(SP)AGGREGATE BASE TYPE A, PLANT MIXED | 3,651 | CY |
$55.00 |
$59.00 |
$90.00 |
| 140 | 307(K) 4300 |
STABILIZED SUBGRADE | 29,961 | SY |
$7.00 |
$5.00 |
$10.00 |
| 150 | 326(A) 0100 |
GEOTEXTILE REINFORCEMENT | 18,624 | SY |
$4.50 |
$3.60 |
$5.50 |
| 160 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 3,532 | TON |
$27.00 |
$27.00 |
$34.50 |
| 170 | 407(B) 0250 |
TACK COAT | 3,195 | GAL |
$2.50 |
$1.00 |
$4.00 |
| 180 | 408 5774 |
PRIME COAT | 15,349 | GAL |
$3.00 |
$1.00 |
$4.00 |
| 190 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 7,470 | TON |
$85.00 |
$70.00 |
$107.00 |
| 200 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 3,334 | TON |
$95.00 |
$80.00 |
$115.00 |
| 210 | 412 5267 |
COLD MILLING PAVEMENT | 2,071 | SY |
$2.00 |
$6.00 |
$7.50 |
| 220 | 509(D) 0325 |
CLASS C CONCRETE | 254 | CY |
$310.00 |
$340.00 |
$350.00 |
| 230 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 8,200 | TON |
$50.00 |
$50.00 |
$40.00 |
| 240 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 2,331 | TON |
$40.00 |
$35.00 |
$37.00 |
| 250 | 602(B) 4300 |
ARTICULATING CONCRETE BLOCK | 28,460 | SF |
$6.00 |
$6.00 |
$9.00 |
| 260 | 613(B) 0688 |
12" CORR. GALV. STEEL PIPE | 64 | LF |
$25.00 |
$25.00 |
$29.00 |
| 270 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 70 | LF |
$30.00 |
$30.00 |
$37.00 |
| 280 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 384 | LF |
$35.00 |
$35.05 |
$44.00 |
| 290 | 613(H) 0450 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 263 | LF |
$25.00 |
$36.00 |
$22.00 |
| 300 | 613(I) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 88 | LF |
$15.00 |
$33.00 |
$22.00 |
| 310 | 613(L) 5722 |
12" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$300.00 |
$200.00 |
$413.00 |
| 320 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 6 | EA |
$1,500.00 |
$1,500.00 |
$1,236.00 |
| 330 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 1 | EA |
$400.00 |
$535.00 |
$500.00 |
| 340 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$50,000.00 |
$50,000.00 |
$10,000.00 |
| 350 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 14,313 | SY |
$3.00 |
$2.25 |
$2.95 |
| 360 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 3,095 | LF |
$4.50 |
$2.10 |
$1.52 |
| 370 | 619(B) 5113 |
REMOVAL OF RIPRAP | 1,811 | SY |
$20.00 |
$3.00 |
$25.00 |
| 380 | 619(C) 0924 |
SAWING PAVEMENT | 4,544 | LF |
$3.00 |
$3.00 |
$5.00 |
| 390 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 6,094 | LF |
$25.00 |
$20.00 |
$22.45 |
| 400 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 8 | EA |
$3,000.00 |
$2,500.00 |
$2,836.00 |
| 410 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$2,200.00 |
$1,900.00 |
$2,127.00 |
| 420 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 1,890 | LF |
$8.00 |
$6.00 |
$9.00 |
| 430 | 624(C) 7181 |
FENCE-STYLE SWF (6 BARBED WIRE) | 1,131 | LF |
$10.00 |
$6.50 |
$10.00 |
| 440 | 853 9033 |
DELINEATORS(TYPE 2, CODE 1) | 130 | EA |
$17.50 |
$15.00 |
$20.00 |
| 450 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 90 | CY |
$30.00 |
$30.00 |
$14.00 |
| 460 | 501(G) 6309 |
CLSM BACKFILL | 200 | CY |
$200.00 |
$175.00 |
$145.00 |
| 470 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 1,197 | LF |
$240.00 |
$265.00 |
$338.00 |
| 480 | 504(A) 1304 |
APPROACH SLAB | 224.8 | SY |
$300.00 |
$250.00 |
$215.00 |
| 490 | 504(B) 1305 |
SAW-CUT GROOVING | 1,557.8 | SY |
$5.00 |
$4.00 |
$4.73 |
| 500 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 697 | LF |
$90.00 |
$108.00 |
$110.00 |
| 510 | 506(A) 1322 |
STRUCTURAL STEEL | 1,050 | LB |
$3.00 |
$1.15 |
$2.00 |
| 520 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$1,000.00 |
$500.00 |
$565.00 |
| 530 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 16 | EA |
$2,000.00 |
$2,000.00 |
$1,631.00 |
| 540 | 507(C) 6282 |
ELASTOMERIC BEARING PADS | 16 | EA |
$750.00 |
$400.00 |
$531.00 |
| 550 | 509(A) 1326 |
CLASS AA CONCRETE | 385.9 | CY |
$750.00 |
$800.00 |
$800.00 |
| 560 | 509(B) 1328 |
CLASS A CONCRETE | 158.9 | CY |
$750.00 |
$900.00 |
$800.00 |
| 570 | 509(D) 1331 |
CLASS C CONCRETE | 42 | CY |
$400.00 |
$475.00 |
$350.00 |
| 580 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 118,230 | LB |
$1.10 |
$1.25 |
$1.20 |
| 590 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 1,590 | LF |
$45.00 |
$32.00 |
$33.00 |
| 600 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 1,590 | LF |
$20.00 |
$10.00 |
$18.00 |
| 610 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
| 620 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,309 | SY |
$5.00 |
$4.00 |
$5.91 |
| 630 | 516(A) 6097 |
DRILLED SHAFTS 66" DIAMETER | 284 | LF |
$1,100.00 |
$1,250.00 |
$1,650.00 |
| 640 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$5,000.00 |
$5,000.00 |
$3,500.00 |
| 650 | 523(A) 6550 |
SEALER CRACK PREPARATION | 163 | LF |
$5.00 |
$4.00 |
$6.00 |
| 660 | 523(B) 6560 |
SEALER RESIN | 1.8 | GAL |
$150.00 |
$150.00 |
$177.28 |
| 670 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 5,830 | TON |
$55.00 |
$50.00 |
$42.00 |
| 680 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 1,195 | TON |
$45.00 |
$36.00 |
$38.00 |
| 690 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$40.00 |
$35.00 |
$25.00 |
| 700 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 114 | LF |
$40.00 |
$30.00 |
$25.00 |
| 710 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$200,000.00 |
$78,000.00 |
$125,000.00 |
| 720 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 38,800 | LF |
$0.7400 |
$0.7200 |
$0.8300 |
| 730 | 857(E) 8890 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | 1,300 | EA |
$0.8300 |
$1.02 |
$1.18 |
| 740 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 1,080 | SD |
$6.00 |
$8.20 |
$9.45 |
| 750 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 130 | SD |
$15.00 |
$25.50 |
$29.55 |
| 760 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 4,300 | LF |
$24.40 |
$12.00 |
$48.00 |
| 770 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 100 | LF |
$3.00 |
$6.00 |
$11.80 |
| 780 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 2,700 | SD |
$0.6000 |
$1.55 |
$1.77 |
| 790 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 4,590 | SD |
$1.00 |
$1.03 |
$1.18 |
| 800 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 5,940 | SD |
$1.50 |
$1.30 |
$1.48 |
| 810 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 4,050 | SD |
$0.6500 |
$1.52 |
$1.77 |
| 820 | 880(C) 8848 |
WING BARRICADES | 1,080 | SD |
$1.20 |
$1.03 |
$1.18 |
| 830 | 880(D) 8854 |
VERTICAL PANELS | 25,920 | SD |
$0.2500 |
$0.1000 |
$0.1200 |
| 840 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 11,340 | SD |
$0.3500 |
$1.02 |
$1.18 |
| 850 | 880(F) 8878 |
DRUMS | 4,050 | SD |
$0.4000 |
$0.7700 |
$1.00 |
| 860 | 880(G) 8890 |
CHANNELIZER CONES | 28,512 | SD |
$0.3500 |
$0.7700 |
$1.00 |
| 870 | 880(I) 8902 |
FLAGGER | 30 | SD |
$150.00 |
$1.00 |
$300.00 |
| 880 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 568 | SD |
$15.00 |
$15.25 |
$20.00 |
| 890 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 6 | EA |
$105.00 |
$155.00 |
$177.28 |
| 900 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 3 | EA |
$300.00 |
$330.00 |
$384.00 |
| 910 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 80.7 | SF |
$28.21 |
$20.50 |
$23.60 |
| 920 | 851(C) 8324 |
2" SQUARE TUBE POST | 121 | LF |
$12.00 |
$10.25 |
$12.00 |
| 930 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 19,200 | LF |
$0.7500 |
$0.8000 |
$1.00 |
| 940 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$40,000.00 |
$25,000.00 |
$38,000.00 |
| 950 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$7,000.00 |
$10,000.00 |
$4,500.00 |
| 960 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$344,000.00 |
$300,000.00 |
$525,000.00 |