| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$137,000.00 |
$40,000.00 |
$63,560.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 59,330 | CY |
$8.50 |
$6.25 |
$4.50 |
$5.00 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,000.00 |
$90,750.00 |
$75,000.00 |
$151,200.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 56,300 | LF |
$2.50 |
$1.95 |
$2.00 |
$2.50 |
| 5 | 221(K) 0600 |
TEMPORARY FIBER LOG | 1,250 | LF |
$4.00 |
$19.00 |
$19.00 |
$5.50 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 153,950 | SY |
$3.15 |
$1.55 |
$2.80 |
$2.50 |
| 7 | 241 2832 |
MOWING | 65 | AC |
$130.00 |
$200.00 |
$200.00 |
$109.00 |
| 8 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 24,950 | CY |
$40.00 |
$50.40 |
$45.00 |
$46.00 |
| 9 | 310(B) 0149 |
SUBGRADE, METHOD B | 94,556 | SY |
$2.75 |
$1.60 |
$2.35 |
$2.50 |
| 10 | 326(A) 0100 |
GEOTEXTILE REINFORCEMENT | 106,650 | SY |
$4.00 |
$3.60 |
$4.00 |
$4.30 |
| 11 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 16,725 | TON |
$25.00 |
$24.20 |
$26.00 |
$25.00 |
| 12 | 407(B) 0250 |
TACK COAT | 18,253 | GAL |
$2.40 |
$1.60 |
$2.75 |
$3.00 |
| 13 | 408 5774 |
PRIME COAT | 56,000 | GAL |
$3.50 |
$2.05 |
$4.00 |
$3.00 |
| 14 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 10,620 | TON |
$75.00 |
$68.45 |
$86.65 |
$89.40 |
| 15 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 11,255 | TON |
$80.00 |
$64.00 |
$80.85 |
$81.80 |
| 16 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 19,536 | TON |
$95.00 |
$80.40 |
$97.00 |
$99.88 |
| 17 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 240 | TON |
$160.00 |
$138.50 |
$119.00 |
$202.10 |
| 18 | 412 5267 |
COLD MILLING PAVEMENT | 43,415 | SY |
$3.00 |
$2.55 |
$2.95 |
$3.80 |
| 19 | 509(D) 0325 |
CLASS C CONCRETE | 717 | CY |
$300.00 |
$345.00 |
$350.00 |
$353.00 |
| 20 | 613(H) 0500 |
8" PERFORATED PIPE UNDERDRAIN ROUND | 1,965 | LF |
$20.00 |
$13.30 |
$7.75 |
$16.30 |
| 21 | 613(I) 1097 |
8" NON-PERF.PIPE UNDERDRAIN RND. | 655 | LF |
$20.00 |
$11.95 |
$7.75 |
$16.30 |
| 22 | 613(J) 5915 |
EDGE DRAIN CONDUIT-PERFORATED | 26,350 | LF |
$14.00 |
$6.85 |
$7.75 |
$8.40 |
| 23 | 613(K) 5916 |
EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 1,208 | LF |
$13.00 |
$11.20 |
$7.75 |
$8.40 |
| 24 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 91 | EA |
$350.00 |
$585.00 |
$700.00 |
$625.00 |
| 25 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$25,000.00 |
$328,700.00 |
$45,000.00 |
$77,000.00 |
| 26 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 53,150 | SY |
$5.00 |
$3.80 |
$7.85 |
$7.70 |
| 27 | 619(C) 0924 |
SAWING PAVEMENT | 55,300 | LF |
$2.50 |
$1.20 |
$1.00 |
$2.00 |
| 28 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 13 | EA |
$133.00 |
$135.00 |
$125.00 |
$0.1400 |
| 29 | 629(B) 4959 |
MAILBOX INSTALLATION-MULTIPLE | 3 | EA |
$260.00 |
$245.00 |
$225.00 |
$244.00 |
| 30 | 629(C) 4960 |
MAILBOX | 21 | EA |
$42.00 |
$55.00 |
$50.00 |
$54.50 |
| 31 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 16 | EA |
$25.00 |
$5.00 |
$5.00 |
$5.50 |
| 32 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 110,400 | LF |
$0.2500 |
$0.2100 |
$0.1200 |
$0.1300 |
| 33 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 55,200 | LF |
$0.6500 |
$0.2500 |
$0.3000 |
$0.3300 |
| 34 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 86,480 | LF |
$0.2500 |
$0.2100 |
$0.1500 |
$0.1600 |
| 35 | 858(A) 8914 |
PAVEMENT MARKERS CLASS A TYPE 2-D | 1,040 | EA |
$6.00 |
$5.30 |
$4.00 |
$4.35 |
| 36 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 600 | SD |
$6.50 |
$2.70 |
$2.50 |
$2.70 |
| 37 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 600 | SD |
$11.25 |
$5.40 |
$5.00 |
$5.45 |
| 38 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 275 | LF |
$22.75 |
$50.75 |
$50.00 |
$21.70 |
| 39 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 550 | LF |
$3.75 |
$5.40 |
$10.00 |
$5.45 |
| 40 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 3,000 | SD |
$0.5000 |
$2.00 |
$2.00 |
$2.20 |
| 41 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 9,000 | SD |
$0.7500 |
$1.00 |
$1.00 |
$1.10 |
| 42 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 7,200 | SD |
$1.75 |
$2.00 |
$2.00 |
$2.20 |
| 43 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 7,200 | SD |
$0.7500 |
$0.2500 |
$0.2500 |
$0.2700 |
| 44 | 880(C) 8848 |
WING BARRICADES | 1,200 | SD |
$2.00 |
$0.2500 |
$0.2500 |
$0.2700 |
| 45 | 880(D) 8854 |
VERTICAL PANELS | 63,000 | SD |
$0.2500 |
$0.0500 |
$0.0500 |
$0.0500 |
| 46 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 10,800 | SD |
$0.5000 |
$1.00 |
$1.00 |
$1.09 |
| 47 | 880(F) 8878 |
DRUMS | 8,100 | SD |
$0.2500 |
$0.1900 |
$0.1800 |
$0.2000 |
| 48 | 880(G) 8890 |
CHANNELIZER CONES | 42,600 | SD |
$0.5000 |
$0.3000 |
$0.3000 |
$0.3300 |
| 49 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 528 | SD |
$9.25 |
$15.00 |
$15.00 |
$16.30 |
| 50 | 413(A) 4870 |
RUMBLE STRIP-CENTERLINE HMA-CON | 38,100 | LF |
$0.2500 |
$0.1200 |
$0.1100 |
$0.1200 |
| 51 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 76,200 | LF |
$0.2500 |
$0.1300 |
$0.0800 |
$0.0900 |
| 52 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 36 | EA |
$61.50 |
$27.00 |
$25.00 |
$28.00 |
| 53 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 592.89 | SF |
$22.75 |
$22.70 |
$21.00 |
$22.80 |
| 54 | 851(C) 8324 |
2" SQUARE TUBE POST | 995.5 | LF |
$9.50 |
$10.80 |
$10.00 |
$11.00 |
| 55 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 133,000 | LF |
$0.7500 |
$0.4800 |
$0.4400 |
$0.4800 |
| 56 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 3,100 | LF |
$1.50 |
$1.08 |
$1.00 |
$1.09 |
| 57 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 1,000 | LF |
$2.25 |
$3.24 |
$3.00 |
$3.26 |
| 58 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 18 | EA |
$131.50 |
$130.00 |
$120.00 |
$130.00 |
| 59 | 858(A) 8911 |
PAVEMENT MARKERS CLASS A TYPE 2-C | 450 | EA |
$6.00 |
$5.95 |
$5.50 |
$6.00 |
| 60 | 858(A) 8914 |
PAVEMENT MARKERS CLASS A TYPE 2-D | 830 | EA |
$6.00 |
$5.95 |
$5.50 |
$6.00 |
| 61 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$60,000.00 |
$97,250.00 |
$45,000.00 |
$70,000.00 |
| 62 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,500.00 |
$10,000.00 |
$21,000.00 |
| 63 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$350,000.00 |
$395,000.00 |
$630,000.00 |
$444,118.21 |