| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$25,000.00 |
$35,000.00 |
$20,600.00 |
$25,000.00 |
$15,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 12,546 | CY |
$7.50 |
$8.00 |
$13.25 |
$25.00 |
$18.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 500 | CY |
$10.00 |
$9.25 |
$27.80 |
$25.00 |
$35.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$14,750.00 |
$6,000.00 |
$26,550.00 |
$25,000.00 |
$15,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 53,220 | LF |
$2.00 |
$1.45 |
$2.60 |
$1.00 |
$2.49 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 540 | LF |
$9.00 |
$5.95 |
$10.35 |
$12.00 |
$34.99 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 42,497 | SY |
$2.00 |
$3.10 |
$3.10 |
$2.00 |
$2.95 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 3.13 | AC |
$525.00 |
$2,800.00 |
$1,295.00 |
$250.00 |
$1,900.00 |
| 9 | 241 2832 |
MOWING | 6.26 | AC |
$90.00 |
$150.00 |
$103.00 |
$55.00 |
$249.00 |
| 10 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 11,214 | CY |
$50.00 |
$34.50 |
$56.40 |
$59.00 |
$58.00 |
| 11 | 326(A) 0100 |
GEOTEXTILE REINFORCEMENT | 53,734 | SY |
$4.35 |
$3.75 |
$2.75 |
$4.75 |
$4.50 |
| 12 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 254 | TON |
$28.00 |
$24.00 |
$55.70 |
$35.00 |
$40.00 |
| 13 | 407(B) 0250 |
TACK COAT | 10,243 | GAL |
$3.00 |
$2.00 |
$2.20 |
$3.97 |
$3.00 |
| 14 | 408 5774 |
PRIME COAT | 30,778 | GAL |
$3.00 |
$0.4000 |
$1.10 |
$3.71 |
$2.50 |
| 15 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 2,324 | TON |
$72.00 |
$85.00 |
$92.00 |
$90.40 |
$110.00 |
| 16 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 9,769 | TON |
$77.00 |
$82.00 |
$83.50 |
$97.70 |
$94.00 |
| 17 | 411(J) 6410 |
(SP) RICH INTERMEDIATE LAYER | 7,561 | TON |
$98.00 |
$120.00 |
$124.00 |
$129.21 |
$110.00 |
| 18 | 412 5267 |
COLD MILLING PAVEMENT | 72,463 | SY |
$2.50 |
$2.25 |
$1.40 |
$1.71 |
$2.75 |
| 19 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 24 | TON |
$45.00 |
$42.00 |
$94.50 |
$55.00 |
$65.00 |
| 20 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 48 | LF |
$115.00 |
$150.00 |
$105.00 |
$250.00 |
$150.00 |
| 21 | 613(A) 4500 |
58" X 36" R.C.PIPE ARCH CLASS A-III | 48 | LF |
$250.00 |
$230.00 |
$220.00 |
$500.00 |
$250.00 |
| 22 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 396 | LF |
$40.00 |
$32.00 |
$57.00 |
$35.00 |
$45.00 |
| 23 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 460 | LF |
$45.00 |
$35.00 |
$57.00 |
$45.00 |
$55.00 |
| 24 | 613(H) 0450 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 1,800 | LF |
$16.50 |
$18.00 |
$9.50 |
$10.00 |
$30.00 |
| 25 | 613(I) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 120 | LF |
$30.00 |
$13.00 |
$19.15 |
$10.00 |
$30.00 |
| 26 | 613(L) 4546 |
58" X 36" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$4,000.00 |
$4,000.00 |
$3,400.00 |
$4,500.00 |
$4,000.00 |
| 27 | 613(L) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$1,500.00 |
$1,900.00 |
$1,900.00 |
$2,500.00 |
$1,750.00 |
| 28 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 16 | EA |
$1,150.00 |
$1,500.00 |
$1,200.00 |
$1,125.00 |
$1,700.00 |
| 29 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 16 | EA |
$1,600.00 |
$1,500.00 |
$1,350.00 |
$1,352.00 |
$2,000.00 |
| 30 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 6 | EA |
$600.00 |
$2,000.00 |
$830.00 |
$650.00 |
$800.00 |
| 31 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$13,000.00 |
$10,000.00 |
$13,000.00 |
$25,000.00 |
$11,000.00 |
| 32 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 23,148 | SY |
$4.50 |
$6.50 |
$6.80 |
$2.00 |
$8.50 |
| 33 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 712 | LF |
$3.50 |
$2.75 |
$6.45 |
$5.00 |
$5.00 |
| 34 | 619(C) 0924 |
SAWING PAVEMENT | 7,715 | LF |
$4.50 |
$5.50 |
$0.9500 |
$3.00 |
$4.50 |
| 35 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 425 | LF |
$18.50 |
$20.00 |
$19.65 |
$25.00 |
$22.00 |
| 36 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 8 | EA |
$2,400.00 |
$3,500.00 |
$2,855.00 |
$3,000.00 |
$2,650.00 |
| 37 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 2 | EA |
$115.00 |
$250.00 |
$260.00 |
$300.00 |
$150.00 |
| 38 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 19 | EA |
$185.00 |
$200.00 |
$205.00 |
$300.00 |
$150.00 |
| 39 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 2 | EA |
$500.00 |
$125.00 |
$260.00 |
$500.00 |
$100.00 |
| 40 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 107,992 | LF |
$0.5000 |
$0.4000 |
$0.3100 |
$0.4000 |
$0.3000 |
| 41 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$25,000.00 |
$10,000.00 |
$68,550.00 |
$22,500.00 |
$7,500.00 |
| 42 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$40,000.00 |
$45,000.00 |
$25,855.00 |
$27,500.00 |
$46,000.00 |
| 43 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$5,000.00 |
$2,000.00 |
$5,500.00 |
$2,500.00 |
| 44 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$193,500.00 |
$102,000.00 |
$182,003.85 |
$125,000.00 |
$214,500.00 |