| 1 | 407(C) 0301 |
(SP) POLYMER MODIFIED CATIONIC RAPID SET - 1S | 73,200 | GAL |
$2.50 |
$2.66 |
| 2 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 28,500 | TON |
$95.00 |
$110.70 |
| 3 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 4,500 | TON |
$87.00 |
$99.00 |
| 4 | 411(I) 6310 |
SUPERPAVE, TYPE S4(PATCH)(PG64-22OK) | 250 | TON |
$125.00 |
$218.00 |
| 5 | 412 5267 |
COLD MILLING PAVEMENT | 292,500 | SY |
$1.75 |
$2.00 |
| 6 | 413(A) 4861 |
RUMBLE STRIP-METHOD HMA-CON | 84,850 | LF |
$0.2000 |
$0.1200 |
| 7 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 203,500 | LF |
$0.4000 |
$0.6600 |
| 8 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 127 | EA |
$250.00 |
$144.00 |
| 9 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 75 | SD |
$8.00 |
$23.00 |
| 10 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$12,000.00 |
$11,500.00 |
| 11 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$210,000.00 |
$227,000.00 |