| 1 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 800 | TON |
$20.00 |
$28.00 |
$30.00 |
$25.00 |
$50.60 |
| 2 | 407(B) 0250 |
TACK COAT | 7,150 | GAL |
$2.00 |
$2.00 |
$2.10 |
$2.00 |
$7.91 |
| 3 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 10,500 | TON |
$75.00 |
$84.00 |
$90.50 |
$96.50 |
$110.46 |
| 4 | 412 5267 |
COLD MILLING PAVEMENT | 56,400 | SY |
$2.25 |
$1.30 |
$1.75 |
$3.00 |
$3.97 |
| 5 | 413(A) 4870 |
RUMBLE STRIP-CENTERLINE HMA-CON | 16,425 | LF |
$0.3000 |
$0.1100 |
$0.1100 |
$0.4000 |
$0.1200 |
| 6 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 32,850 | LF |
$0.2000 |
$0.0800 |
$0.1000 |
$0.2500 |
$0.0800 |
| 7 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$400.00 |
$200.00 |
$410.00 |
$395.00 |
$389.65 |
| 8 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 2,590 | LF |
$4.00 |
$2.50 |
$2.10 |
$2.50 |
$2.40 |
| 9 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 2,310 | LF |
$21.00 |
$21.00 |
$21.00 |
$21.00 |
$23.98 |
| 10 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,000.00 |
$2,650.00 |
$2,800.00 |
$2,700.00 |
$3,177.15 |
| 11 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$2,000.00 |
$1,800.00 |
$1,900.00 |
$1,850.00 |
$2,158.06 |
| 12 | 504(E) 1381 |
CONCRETE PARAPET | 40 | LF |
$200.00 |
$200.00 |
$530.00 |
$350.00 |
$304.79 |
| 13 | 619(B) 2505 |
REMOVAL OF BRIDGE ITEMS | 4 | EA |
$1,000.00 |
$1,000.00 |
$3,100.00 |
$1,000.00 |
$736.59 |
| 14 | 853 9033 |
DELINEATORS(TYPE 2, CODE 1) | 56 | EA |
$25.00 |
$12.00 |
$12.75 |
$12.50 |
$14.39 |
| 15 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 62,500 | LF |
$0.7500 |
$0.3500 |
$0.3500 |
$0.3500 |
$0.4000 |
| 16 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 39 | LF |
$10.00 |
$11.00 |
$11.00 |
$10.50 |
$11.99 |
| 17 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$50,000.00 |
$24,000.00 |
$74,205.25 |
$27,941.00 |
$3,596.77 |
| 18 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 134 | SD |
$30.00 |
$11.00 |
$11.00 |
$10.50 |
$11.99 |