BRIDGE REHABILITATION US -64/US-412: OVER SKELETON CREEK , 4.3 MILES EAST OF THE US -81 JUNCTION IN ENID. PROJECT LENGTH 0.071 MILE

Let date
Thursday, April 16, 2020
Contract
200151
J/P numbers
30641(04)
District
Division 4
County
Garfield
Highway
Limits
BRIDGE REHABILITATION US -64/US-412: OVER SKELETON CREEK , 4.3 MILES EAST OF THE US -81 JUNCTION IN ENID. PROJECT LENGTH 0.071 MILE
Project number
SBR-019N(134)SB

Bidders 6

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$852,187
1 BRIDGECO CONTRACTORS, INC. Low bidder $892,764 +4.8%
2 Frontier Bridge, Inc. $939,222 +10.2% +5.2%
3 K & R BUILDERS, INC. $979,503 +14.9% +9.7%
4 WILDCAT CONSTRUCTION CO., INC. & SUBSIDIARIES $1,058,375 +24.2% +18.6%
5 CONCRETE SERVICES CORPORATION $1,076,874 +26.4% +20.6%
6 HASKELL LEMON CONSTRUCTION CO. $1,136,312 +33.3% +27.3%

Bid tab: unit prices 53 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 BRIDGECO CONTRA…#2 Frontier Bridge…#3 K & R BUILDERS,…#4 WILDCAT CONSTRU…#5 CONCRETE SERVIC…#6 HASKELL LEMON C…
1202(D) 0184 UNCLASSIFIED BORROW20CY $40.00 $150.00 $106.00 $40.00 $83.00 $26.00 $330.00
2230(A) 2806 SOLID SLAB SODDING500SY $5.00 $7.00 $7.37 $7.00 $3.95 $4.11 $4.25
3407(B) 0250 TACK COAT146GAL $10.00 $8.00 $5.30 $5.50 $5.00 $5.20 $4.95
4411(C) 5955 SUPERPAVE, TYPE S4(PG 70-28 OK)239TON $175.00 $215.00 $162.18 $224.07 $153.00 $159.12 $215.50
5412 5267 COLD MILLING PAVEMENT1,890SY $9.00 $16.70 $14.84 $20.75 $26.00 $10.40 $10.00
6619(B) 4780 REMOVAL OF GUARDRAIL454LF $4.00 $6.00 $4.24 $5.00 $6.00 $4.00 $7.85
7619(B) 5881 REMOVAL OF CONCRETE DITCH LINER136LF $10.00 $45.00 $9.54 $20.00 $16.67 $10.00 $44.30
8623 0100 (PL)GUARDRAIL CURBING2EA $1,500.00 $2,000.00 $1,800.08 $1,603.00 $1,500.00 $2,500.00 $2,027.00
9623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE325LF $19.00 $22.00 $21.20 $22.00 $20.00 $23.00 $16.50
10623(G) 8571 GUARDRAIL END TREATMENT (GET)2EA $2,250.00 $3,900.00 $3,710.00 $3,850.00 $3,500.00 $3,400.00 $2,457.00
11623(I) 8675 GUARDRAIL BRIDGE CONNECTION-TYPE A2EA $1,800.00 $3,000.00 $2,862.00 $2,970.00 $2,700.00 $2,300.00 $2,160.00
12623(I) 8690 GUARDRAIL BRIDGE CONN-TRAIL END (31")2EA $1,300.00 $1,200.00 $954.00 $990.00 $900.00 $715.00 $1,793.00
13501(G) 6309 CLSM BACKFILL83.6CY $275.00 $240.00 $228.70 $214.00 $270.00 $300.00 $232.50
14504(A) 1304 APPROACH SLAB195.6SY $200.00 $269.70 $290.58 $295.00 $266.68 $175.00 $466.50
15504(B) 1305 SAW-CUT GROOVING843.8SY $5.00 $5.75 $5.56 $5.72 $5.20 $5.00 $5.60
16504(C) 6250 SEALED EXPANSION JOINT90LF $300.00 $269.00 $382.30 $350.00 $465.00 $474.50 $325.50
17504(D) 6245 CONCRETE RAIL (TR4)363LF $125.00 $94.00 $110.87 $97.00 $153.48 $215.00 $148.00
18506(A) 1322 STRUCTURAL STEEL13,260LB $4.00 $9.50 $7.07 $9.44 $5.00 $9.72 $9.25
19509 5000 ELASTOMERIC COATING992SF $15.00 $15.00 $14.98 $15.40 $12.50 $12.00 $15.10
20509(A) 1326 CLASS AA CONCRETE162.6CY $700.00 $870.00 $891.63 $891.00 $970.00 $1,245.20 $961.50
21509(D) 1331 CLASS C CONCRETE47.9CY $560.00 $400.00 $560.01 $560.00 $900.00 $932.00 $772.50
22511 6306 MECHANICAL SPLICES478EA $35.00 $31.50 $44.26 $31.00 $40.00 $32.00 $46.90
23511(B) 6010 EPOXY COATED REINFORCING STEEL37,860LB $1.30 $1.15 $1.25 $1.20 $2.00 $1.56 $2.10
24512(A) 1323 PAINTING EXISTING STRUCTURES1LSUM $25,000.00 $60,070.00 $38,398.02 $39,475.00 $30,000.00 $37,321.93 $38,750.00
25512(B) 6303 COLLECTION AND HANDLING OF WASTE1LSUM $4,000.00 $3,350.00 $3,290.25 $3,400.00 $5,000.00 $3,198.58 $3,321.00
26515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)246SY $6.00 $6.00 $5.35 $5.50 $5.00 $4.00 $5.40
27520(A) 6058 PREPARATION OF CRACKS, ABOVE WATER50LF $36.00 $44.00 $42.80 $44.00 $32.00 $32.00 $43.20
28520(C) 6060 EPOXY RESIN, ABOVE WATER4GAL $100.00 $150.00 $53.50 $55.00 $100.00 $80.00 $54.00
29521(A) 6210 PNEUMATICALLY PLACED MORTAR37SY $700.00 $760.00 $759.70 $799.00 $650.00 $600.00 $766.50
30523(A) 6550 SEALER CRACK PREPARATION142LF $4.50 $6.00 $5.35 $5.50 $5.00 $4.50 $5.40
31523(B) 6560 SEALER RESIN1.6GAL $140.00 $230.00 $214.00 $220.00 $200.00 $80.00 $216.00
32535 6130 (SP)CORROSION INHIBITOR(SURFACE APPLIED)90SY $48.00 $50.00 $52.43 $55.00 $42.00 $32.00 $52.90
33619(B) 2500 REMOVAL OF BRIDGE ITEMS1LSUM $150,000.00 $48,000.00 $119,840.00 $121,000.00 $170,000.00 $139,850.00 $88,585.00
34857(A) 8839 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE)1,600LF $0.6000 $0.1500 $10.60 $0.1100 $0.1000 $0.1500 $0.7600
35857(C) 8851 REMOVABLE PAVEMENT MARKING TAPE(4" WIDE)1,000LF $1.20 $1.10 $1.06 $1.10 $1.00 $1.20 $2.15
36857(E) 8887 (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-11,000EA $0.7500 $1.00 $0.8000 $0.8300 $0.7500 $0.7500 $1.10
37871(B) 8705 (SP)CONST.ZONE IMPACT ATTEN.180SD $12.00 $6.00 $5.30 $5.50 $5.00 $5.00 $27.00
38877(B) 8484 DELIVER PORTABLE LONGITUDINAL BARRIER490LF $31.00 $41.00 $26.50 $42.50 $35.00 $35.00 $21.60
39877(C) 8486 RELOCATION OF PORTABLE LONGITUDINAL BARRIER490LF $8.00 $5.00 $4.24 $4.00 $2.50 $5.00 $3.65
40880(A) 8812 ARROW DISPLAY(TYPE C)180SD $10.00 $6.00 $5.30 $5.50 $5.00 $5.00 $9.70
41880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF2,520SD $0.9500 $1.10 $1.06 $1.10 $1.00 $1.00 $0.4300
42880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF2,340SD $1.25 $1.10 $1.06 $1.10 $1.00 $1.00 $0.4900
43880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF1,980SD $2.00 $1.15 $1.06 $1.10 $1.00 $1.00 $1.10
44880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)900SD $2.00 $0.5000 $0.2700 $0.2800 $0.2500 $0.2500 $3.25
45880(C) 8848 WING BARRICADES360SD $1.05 $0.5000 $0.2700 $0.2800 $0.2500 $0.2500 $4.30
46880(E) 8860 WARNING LIGHTS(TYPE A)3,240SD $0.6500 $0.2000 $0.1100 $0.1100 $0.1000 $0.1000 $0.8100
47880(F) 8878 DRUMS6,660SD $0.7500 $0.6000 $0.5300 $0.5500 $0.5000 $0.5000 $0.2200
48882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN187SD $20.00 $11.00 $10.60 $11.00 $10.00 $10.00 $21.60
49413(B) 4863 RUMBLE STRIP-METHOD HMA-CYC800LF $1.50 $4.00 $3.45 $3.58 $3.25 $3.25 $2.15
50853 9066 GUARDRAIL DELINEATORS(TYPE 1, CODE 1)10EA $15.50 $17.00 $15.90 $16.50 $15.00 $15.50 $14.30
51856(A) 8530 TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE)1,340LF $2.10 $2.75 $2.65 $2.75 $2.50 $2.50 $2.90
52642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $20,000.00 $6,300.00 $6,380.00 $7,800.00 $5,600.00 $14,248.00 $13,380.00
53641 1399 MOBILIZATION1LSUM $66,119.00 $65,000.00 $71,648.50 $72,500.00 $105,000.00 $75,089.89 $165,127.15