| 10 | 202(D) 0184 |
UNCLASSIFIED BORROW | 650 | CY |
$25.00 |
$4.50 |
| 20 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$8,000.00 |
$17,250.00 |
| 30 | 407(C) 0301 |
(SP) POLYMER MODIFIED CATIONIC RAPID SET - 1S | 48,100 | GAL |
$2.25 |
$2.40 |
| 40 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 21,300 | TON |
$110.00 |
$115.00 |
| 50 | 411(I) 6310 |
SUPERPAVE, TYPE S4(PATCH)(PG64-22OK) | 250 | TON |
$125.00 |
$130.00 |
| 60 | 412 5267 |
COLD MILLING PAVEMENT | 190,700 | SY |
$3.00 |
$1.50 |
| 70 | 413(A) 4870 |
RUMBLE STRIP-CENTERLINE HMA-CON | 36,200 | LF |
$0.2000 |
$0.2500 |
| 80 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 70,700 | LF |
$0.1500 |
$0.2500 |
| 90 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 129,000 | LF |
$0.5000 |
$0.5400 |
| 100 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 600 | LF |
$3.00 |
$10.00 |
| 110 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 15 | LF |
$15.00 |
$20.00 |
| 120 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 7 | EA |
$350.00 |
$100.00 |
| 130 | 880(J) 8700 |
(SP) CONSTRUCTION TRAFFIC CONTROL | 45 | SD |
$400.00 |
$300.00 |
| 140 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$125,000.00 |
$185,000.00 |