Bid tab 200090

Let Feb 20, 2020 · Division 3 · Coal Sign up free

‹ Feb 2020 results

BRIDGE REHABILITATION US -75/SH-3: OVER BRIAR CREEK, 2.9 MILES SOUTH OF THE SH -43 JUNCTION NEAR LEHIGH. PROJECT LENGTH = 0.043 MILE

Let date
Thursday, February 20, 2020
Contract
200090
J/P numbers
29731(04)
District
Division 3
County
Coal
Highway
Limits
BRIDGE REHABILITATION US -75/SH-3: OVER BRIAR CREEK, 2.9 MILES SOUTH OF THE SH -43 JUNCTION NEAR LEHIGH. PROJECT LENGTH = 0.043 MILE
Project number
NHPP-215N(028)PM

Bidders 8

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$909,723
1 Built Right Construction, LLC Low bidder $745,766 -18.0%
2 BRIDGECO CONTRACTORS, INC. $759,345 -16.5% +1.8%
3 C3 Construction, Inc. $761,228 -16.3% +2.1%
4 B & B CONSTRUCTION SERVICE J.T., INC. $811,095 -10.8% +8.8%
5 HUB Construction, Inc. $872,228 -4.1% +17.0%
6 Frontier Bridge, Inc. $897,047 -1.4% +20.3%
8 HASKELL LEMON CONSTRUCTION CO. $983,761 +8.1% +31.9%
9 K & R BUILDERS, INC. $1,119,947 +23.1% +50.2%

Bid tab: unit prices 48 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 Built Right Con…#2 BRIDGECO CONTRA…#3 C3 Construction…#4 B & B CONSTRUCT…#5 HUB Constructio…#6 Frontier Bridge…#8 HASKELL LEMON C…#9 K & R BUILDERS,…
1232(B) 2814 SEEDING METHOD B1AC $3,000.00 $10,000.00 $9,000.00 $7,694.14 $6,500.00 $2,000.00 $6,583.50 $6,446.00 $9,000.00
2233(A) 2817 VEGETATIVE MULCHING1AC $2,000.00 $7,500.00 $8,800.00 $7,694.14 $6,500.00 $2,000.00 $6,583.50 $6,446.00 $7,500.00
3407(B) 0250 TACK COAT94GAL $5.25 $5.50 $6.00 $6.36 $5.55 $6.05 $1.87 $5.35 $6.60
4411(C) 5955 SUPERPAVE, TYPE S4(PG 70-28 OK)179TON $170.00 $240.00 $225.00 $269.75 $235.00 $256.51 $242.55 $226.00 $325.00
5412 5267 COLD MILLING PAVEMENT623SY $13.52 $26.00 $22.00 $26.42 $23.00 $25.12 $16.94 $22.10 $42.00
6619(B) 4780 REMOVAL OF GUARDRAIL540LF $4.79 $10.00 $7.00 $3.86 $2.00 $4.00 $11.00 $3.75 $7.00
7623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE400LF $18.45 $22.00 $22.00 $25.71 $22.40 $24.00 $22.00 $22.60 $24.00
8623(F) 4447 GUARDRAIL ANCHOR UNIT (TYPE B)1EA $528.44 $1,500.00 $900.00 $642.79 $560.00 $611.00 $550.00 $754.00 $600.00
9623(G) 8590 GUARDRAIL END TREATMENT (31")3EA $2,485.05 $3,000.00 $3,100.00 $3,535.32 $3,080.00 $3,361.00 $3,025.00 $2,585.00 $3,300.00
10623(I) 8700 GUARDRAIL BRIDGE CONN-THRIE BEAM (31")4EA $1,858.68 $2,500.00 $2,000.00 $2,314.03 $2,016.00 $2,200.00 $1,980.00 $1,804.00 $2,160.00
11853 9069 GUARDRAIL DELINEATORS(TYPE 2, CODE 1)58EA $12.41 $20.00 $12.00 $12.86 $11.25 $12.22 $11.00 $21.50 $12.00
12504(B) 1305 SAW-CUT GROOVING442SY $5.35 $15.00 $8.00 $9.26 $8.00 $9.00 $7.92 $7.75 $8.64
13504(C) 6250 SEALED EXPANSION JOINT90.57LF $304.92 $300.00 $297.00 $277.10 $241.00 $270.00 $314.46 $291.00 $400.00
14504(D) 6245 CONCRETE RAIL (TR4)258.2LF $99.10 $115.00 $95.00 $98.60 $140.00 $130.00 $109.35 $135.00 $130.00
15506(A) 1322 STRUCTURAL STEEL510LB $5.20 $5.00 $16.50 $18.45 $8.00 $17.54 $15.79 $15.50 $18.00
16509 6152 SPECIAL CONCRETE FINISH135SY $35.96 $75.00 $111.00 $129.14 $106.00 $122.80 $110.50 $108.00 $120.00
17509(A) 1326 CLASS AA CONCRETE147CY $1,200.00 $900.00 $1,100.00 $750.63 $1,550.00 $1,061.00 $1,171.07 $1,609.00 $1,950.00
18509(D) 1331 CLASS C CONCRETE9.9CY $750.00 $750.00 $400.00 $661.08 $815.00 $400.00 $874.09 $916.50 $880.00
19511(B) 6010 EPOXY COATED REINFORCING STEEL44,460LB $1.50 $1.80 $1.20 $1.22 $1.58 $1.47 $1.71 $3.20 $1.53
20512(A) 1323 PAINTING EXISTING STRUCTURES1LSUM $22,000.00 $90,000.00 $88,473.00 $96,970.64 $84,000.00 $85,000.00 $82,973.00 $91,300.00 $90,000.00
21512(B) 6303 COLLECTION AND HANDLING OF WASTE1LSUM $3,000.00 $7,500.00 $8,675.00 $9,673.92 $8,428.00 $8,100.00 $8,277.50 $8,104.00 $9,000.00
22515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)250SY $5.07 $7.00 $7.00 $6.43 $4.00 $6.11 $5.50 $5.40 $6.00
23520(A) 6058 PREPARATION OF CRACKS, ABOVE WATER25LF $49.15 $25.00 $41.70 $48.85 $55.00 $46.45 $41.80 $40.90 $46.00
24520(C) 6060 EPOXY RESIN, ABOVE WATER5GAL $95.85 $100.00 $58.00 $64.28 $95.00 $61.00 $55.00 $53.90 $60.00
25521(A) 6210 PNEUMATICALLY PLACED MORTAR24SY $1,000.00 $700.00 $975.00 $1,145.44 $675.00 $1,089.00 $980.10 $959.50 $1,080.00
26535 6130 (SP)CORROSION INHIBITOR(SURFACE APPLIED)20SY $47.78 $65.00 $58.00 $64.28 $47.00 $61.00 $55.00 $53.90 $60.00
27540 4515 (PL)REPAIR BRIDGE ITEM (TYPE A)3EA $6,831.14 $5,000.00 $7,850.00 $8,729.03 $2,600.00 $8,300.00 $7,469.00 $7,313.00 $8,150.00
28540 4520 (PL)REPAIR BRIDGE ITEM (TYPE B)1LSUM $2,000.00 $17,500.00 $25,240.00 $11,444.16 $3,600.00 $10,882.54 $9,792.20 $14,620.00 $10,800.00
29545 4815 (PL)REPLACE BRIDGE ITEM (TYPE A)1EA $1,943.08 $3,000.00 $3,584.00 $4,005.84 $1,200.00 $134.00 $3,427.60 $3,356.00 $3,716.00
30619(B) 6319 REMOVAL OF DECK474SY $100.00 $45.00 $105.00 $115.70 $90.00 $220.00 $295.65 $133.00 $395.00
31823 8478 (SP)PORTABLE TRAFFIC SIGNAL SYSTEM120SD $122.96 $73.50 $195.00 $231.40 $200.00 $24.45 $198.00 $79.20 $216.00
32850(A) 8110 SHEET ALUMINUM SIGNS7.5SF $34.17 $82.00 $23.00 $25.71 $22.20 $12.23 $22.00 $88.30 $24.00
33851(C) 8327 2 1/4" SQUARE TUBE POST22LF $11.56 $10.00 $11.50 $12.86 $11.20 $2.57 $11.00 $8.60 $12.00
34855(A) 8812 TRAFFIC STRIPE(PLASTIC)(4" WIDE)1,449LF $1.66 $2.50 $2.42 $2.70 $2.35 $1.22 $2.31 $3.05 $2.52
35857(C) 8851 REMOVABLE PAVEMENT MARKING TAPE(4" WIDE)1,344LF $1.55 $3.00 $1.15 $1.29 $1.15 $2.44 $1.10 $3.05 $1.20
36871(B) 8705 (SP)CONST.ZONE IMPACT ATTEN.240SD $10.62 $20.00 $2.30 $2.57 $2.30 $2.44 $2.20 $17.20 $2.40
37877(B) 8484 DELIVER PORTABLE LONGITUDINAL BARRIER1,134LF $29.46 $24.00 $27.75 $32.14 $28.00 $50.56 $33.00 $19.10 $30.00
38877(C) 8486 RELOCATION OF PORTABLE LONGITUDINAL BARRIER1,134LF $3.94 $5.00 $1.15 $1.29 $1.15 $1.22 $5.50 $2.15 $5.00
39880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF1,800SD $0.4900 $2.75 $1.15 $1.29 $1.15 $1.22 $1.10 $2.95 $1.20
40880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF720SD $0.6900 $2.75 $1.15 $1.29 $1.12 $1.22 $1.10 $2.95 $1.20
41880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF2,040SD $1.21 $2.75 $2.30 $2.57 $2.30 $2.44 $2.20 $2.95 $2.40
42880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)360SD $1.78 $1.00 $0.1500 $0.1300 $0.1500 $0.1200 $0.1100 $1.10 $0.1000
43880(C) 8848 WING BARRICADES480SD $1.12 $2.00 $2.30 $2.57 $2.25 $2.44 $2.20 $2.15 $2.40
44880(E) 8860 WARNING LIGHTS(TYPE A)2,040SD $0.3800 $0.5000 $0.1800 $0.1800 $0.2000 $0.1700 $0.1500 $0.5400 $0.1600
45880(G) 8890 CHANNELIZER CONES4,920SD $0.4200 $0.4000 $0.3000 $0.3200 $0.3000 $12.22 $0.2800 $0.4300 $0.3000
46882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN360SD $14.49 $6.00 $12.00 $12.86 $12.00 $12.22 $11.00 $6.45 $12.00
47642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $10,000.00 $7,500.00 $6,100.00 $6,813.53 $6,000.00 $6,112.00 $5,500.00 $14,870.00 $7,500.00
48641 1399 MOBILIZATION1LSUM $40,000.00 $80,000.00 $48,000.00 $63,633.21 $75,000.00 $50,000.00 $69,786.21 $101,616.80 $73,000.00