| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$25,000.00 |
$11,527.28 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 5,965 | CY |
$10.00 |
$7.28 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,000 | CY |
$14.00 |
$9.40 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$25,000.00 |
$10,313.88 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 5,436 | LF |
$2.50 |
$4.27 |
| 6 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 46 | EA |
$205.00 |
$422.26 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 88 | LF |
$12.00 |
$31.27 |
| 8 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 20 | CY |
$105.00 |
$127.41 |
| 9 | 229 4318 |
DITCH LINER PROTECTION | 110 | LF |
$4.00 |
$11.95 |
| 10 | 230(A) 2806 |
SOLID SLAB SODDING | 884 | SY |
$1.20 |
$11.95 |
| 11 | 307(K) 4300 |
STABILIZED SUBGRADE | 12,448 | SY |
$4.70 |
$8.19 |
| 12 | 310(B) 0149 |
SUBGRADE, METHOD B | 41,492 | SY |
$2.00 |
$1.52 |
| 13 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 147 | TON |
$50.00 |
$34.14 |
| 14 | 407(B) 0250 |
TACK COAT | 1,734 | GAL |
$4.00 |
$4.85 |
| 15 | 408 5774 |
PRIME COAT | 1,615 | GAL |
$4.00 |
$6.67 |
| 16 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 7,129 | TON |
$65.00 |
$95.07 |
| 17 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 3,593 | TON |
$72.00 |
$122.55 |
| 18 | 412 5267 |
COLD MILLING PAVEMENT | 21,179 | SY |
$2.00 |
$1.21 |
| 19 | 414(A) 0210 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 9,346 | SY |
$12.40 |
$18.31 |
| 20 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 32,147 | SY |
$14.70 |
$20.74 |
| 21 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 10,374 | CY |
$115.00 |
$198.76 |
| 22 | 509(D) 0325 |
CLASS C CONCRETE | 11 | CY |
$460.00 |
$476.83 |
| 23 | 510(A) 6333 |
RETAINING WALL | 35 | SY |
$675.00 |
$586.37 |
| 24 | 609(A) 0300 |
CONCRETE CURB (6" BARRIER-INTEGRAL) | 328 | LF |
$4.30 |
$10.84 |
| 25 | 609(A) 0380 |
CONCRETE CURB (8" BARRIER-INTEGRAL) | 255 | LF |
$23.00 |
$11.11 |
| 26 | 609(B) 0384 |
COMBINED CURB & GUTTER (8" BARRIER) | 3,893 | LF |
$32.00 |
$28.32 |
| 27 | 610(A) 0602 |
4" CONCRETE SIDEWALK | 5,009 | SY |
$54.00 |
$54.50 |
| 28 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 1,087 | SY |
$63.00 |
$64.93 |
| 29 | 610(C) 0608 |
4" CONCRETE DIVIDING STRIP | 31 | SY |
$45.00 |
$58.44 |
| 30 | 610(I) 4610 |
TACTILE WARNING DEVICE-NEW | 400 | SF |
$35.00 |
$37.81 |
| 31 | 611(A) 2657 |
MANHOLE (4' DIAMETER) | 12 | EA |
$2,001.20 |
$1,664.75 |
| 32 | 611(A) 2658 |
MANHOLE (5' DIAMETER) | 1 | EA |
$2,300.00 |
$2,512.19 |
| 33 | 611(G) 5100 |
INLET CI DES. 1 (STD) | 1 | EA |
$2,800.00 |
$2,084.92 |
| 34 | 611(G) 5101 |
INLET CI DES. 1 (A) | 1 | EA |
$3,000.00 |
$3,213.62 |
| 35 | 611(G) 5112 |
INLET CI DES. 2 (STD) | 5 | EA |
$3,200.00 |
$4,074.30 |
| 36 | 611(G) 5113 |
INLET CI DES. 2 (B) | 1 | EA |
$3,800.00 |
$5,623.10 |
| 37 | 611(G) 5120 |
INLET CI DES. 3 (STD) | 6 | EA |
$5,400.00 |
$5,296.89 |
| 38 | 611(H) 5196 |
ADDITIONAL DEPTH IN INLET | 31 | VF |
$500.00 |
$698.83 |
| 39 | 611(K) 5118 |
REPLACEMENT OF DROP INLET GRATE (SMD TYPE 2B) | 6 | EA |
$900.00 |
$866.83 |
| 40 | 611(L) 0487 |
JUNCTION BOXES | 30 | CF |
$45.30 |
$3,239.95 |
| 41 | 611(M) 4488 |
REPLACEMENT OF CAST IRON HOOD | 7 | EA |
$400.00 |
$1,757.57 |
| 42 | 613(EE) 5610 |
(SP) 18" CORRUGATED POLYPROPYLENE PIPE | 1,137 | LF |
$54.00 |
$46.35 |
| 43 | 613(EE) 5620 |
(SP) 24" CORRUGATED POLYPROPYLENE PIPE | 598 | LF |
$90.00 |
$59.71 |
| 44 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$970.00 |
$777.03 |
| 45 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$20,000.00 |
$12,740.68 |
| 46 | 619(B) 4726 |
REMOVAL OF CURB AND GUTTER | 2,064 | LF |
$7.00 |
$5.46 |
| 47 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 33,417 | SY |
$7.00 |
$5.02 |
| 48 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 12,431 | SY |
$7.00 |
$5.02 |
| 49 | 619(B) 4792 |
REMOVAL OF SIDEWALK | 2,972 | SY |
$7.00 |
$4.25 |
| 50 | 619(C) 0924 |
SAWING PAVEMENT | 21,197 | LF |
$3.00 |
$2.43 |
| 51 | 622(A) 4746 |
PIPE RAILING | 94 | LF |
$125.00 |
$230.50 |
| 52 | 802(B) 8340 |
2" PVC SCH.40 PLASTIC CONDUIT BORED | 170 | LF |
$16.10 |
$30.33 |
| 53 | 802(B) 8342 |
2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 370 | LF |
$6.60 |
$14.56 |
| 54 | 802(B) 8344 |
3" PVC SCH.40 PLASTIC CONDUIT BORED | 690 | LF |
$26.20 |
$54.60 |
| 55 | 802(B) 8346 |
3" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 140 | LF |
$13.10 |
$18.20 |
| 56 | 803(A) 8065 |
PULL BOX(SIZE I) | 11 | EA |
$436.00 |
$940.38 |
| 57 | 803(A) 8066 |
PULL BOX(SIZE II) | 4 | EA |
$484.10 |
$1,085.99 |
| 58 | 804(A) 2915 |
STRUCTURAL CONCRETE | 63.5 | CY |
$653.70 |
$1,104.19 |
| 59 | 804(B) 2916 |
REINFORCING STEEL | 9,185.6 | LB |
$1.70 |
$2.43 |
| 60 | 805(A) 8704 |
REMOVAL OF PULL BOX | 7 | EA |
$134.10 |
$103.14 |
| 61 | 805(A) 8726 |
(PL)REMOVAL OF TRAFFIC SIGNAL EQUIPMENT | 1 | LSUM |
$4,220.00 |
$15,592.17 |
| 62 | 806(A) 8312 |
32'MH POLE 40'TS & 10'LMA(G.STL.) | 1 | EA |
$13,700.00 |
$18,698.47 |
| 63 | 806(A) 8350 |
32'MH POLE,30'TS & 10'LMA(G.STL.) | 1 | EA |
$10,800.00 |
$17,764.14 |
| 64 | 806(A) 8351 |
32'MH POLE 25',TS & 10'LMA(G.STL.) | 2 | EA |
$9,800.00 |
$17,169.58 |
| 65 | 806(A) 8726 |
POLE & 25' TS MST.ARM(G.STL.) | 3 | EA |
$7,600.00 |
$15,774.17 |
| 66 | 806(A) 8728 |
POLE & 30' TS MST.ARM(G.STL.) | 2 | EA |
$7,800.00 |
$16,623.55 |
| 67 | 806(A) 8732 |
POLE & 40' TS MST.ARM(G.STL.) | 1 | EA |
$8,200.00 |
$17,412.26 |
| 68 | 806(A) 8734 |
POLE & 45' TS MST.ARM(G.STL.) | 2 | EA |
$16,000.00 |
$24,134.48 |
| 69 | 806(B) 8894 |
10' MTG.HT.TS PED.POLE(G.STL.) | 10 | EA |
$1,380.50 |
$988.92 |
| 70 | 809(A) 8090 |
ROADWAY LUMINAIRE | 4 | EA |
$1,746.10 |
$1,838.30 |
| 71 | 810(A) 3118 |
SERVICE POLE | 2 | EA |
$3,073.10 |
$1,213.40 |
| 72 | 811 8040 |
1/C NO.6 ELECTRICAL CONDUCTOR | 400 | LF |
$1.90 |
$1.21 |
| 73 | 811 8044 |
1/C NO.10 ELECTRICAL CONDUCTOR | 1,740 | LF |
$1.50 |
$1.21 |
| 74 | 825 8550 |
TRAFFIC SIGNAL CONTROLLER ASSEMBLY | 3 | EA |
$29,537.60 |
$33,368.44 |
| 75 | 828 8132 |
(PL)DETECTION SYSTEM (VIDEO) | 1 | LSUM |
$42,270.90 |
$99,801.97 |
| 76 | 830 8000 |
PEDESTRIAN PUSH BUTTON | 26 | EA |
$1,135.20 |
$1,480.35 |
| 77 | 831 8231 |
1WAY 3SEC. ADJ. SIG. HD. S-6 | 24 | EA |
$591.30 |
$837.24 |
| 78 | 831 8280 |
1WAY 4SEC. ADJ. SIG. HD.S-13 | 4 | EA |
$821.70 |
$958.58 |
| 79 | 831 8295 |
1WAY 2SEC. ADJ. PED. SIG. HD. S-20 | 26 | EA |
$557.60 |
$715.90 |
| 80 | 833 3030 |
BACKPLATE | 28 | EA |
$130.10 |
$266.95 |
| 81 | 834(A) 8207 |
5/C TRAFFIC SIGNAL ELECTRICAL CABLE | 5,345 | LF |
$1.80 |
$3.64 |
| 82 | 834(A) 8208 |
7/C TRAFFIC SIGNAL ELECTRICAL CABLE | 570 | LF |
$2.50 |
$3.64 |
| 83 | 834(A) 8213 |
21/C TRAFFIC SIGNAL ELECTRICAL CABLE | 1,700 | LF |
$4.60 |
$6.07 |
| 84 | 834(B) 8220 |
2/C SHIELDED LOOP DETECTOR LEAD-IN CABLE | 140 | LF |
$1.60 |
$6.07 |
| 85 | 840(A) 8592 |
E.P.S. OPTICAL EMITTER | 15 | EA |
$1,134.30 |
$1,516.75 |
| 86 | 840(B) 8593 |
E.P.S. OPTICAL DETECTOR | 6 | EA |
$1,082.60 |
$867.58 |
| 87 | 840(C) 8594 |
E.P.S. OPTICAL DETECTOR CABLE | 1,190 | LF |
$1.60 |
$2.43 |
| 88 | 840(D) 8595 |
E.P.S. 2 CHANNEL PHASE SELECTOR | 3 | EA |
$2,800.00 |
$2,699.81 |
| 89 | 850(C) 8118 |
MAST ARM MOUNTED SIGNS(ALUMINUM) | 191.5 | SF |
$53.50 |
$74.02 |
| 90 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 15 | EA |
$250.00 |
$182.01 |
| 91 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 6,397 | LF |
$0.9000 |
$0.7300 |
| 92 | 855(A) 8814 |
TRAFFIC STRIPE(PLASTIC)(8" WIDE) | 460 | LF |
$0.9000 |
$3.64 |
| 93 | 855(B) 8818 |
TRAFFIC STRIPE(PLASTIC)(ARROWS) | 26 | EA |
$130.00 |
$91.01 |
| 94 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 37,408 | LF |
$0.8000 |
$0.9700 |
| 95 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 3,563 | LF |
$1.60 |
$1.21 |
| 96 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 1,434 | LF |
$4.60 |
$6.07 |
| 97 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 26 | EA |
$160.70 |
$145.61 |
| 98 | 856(B) 8870 |
TRAFFIC STRIPE(MULTI-POLY.)(SYMBOLS) | 6 | EA |
$400.00 |
$364.02 |
| 99 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 83,614 | LF |
$0.5000 |
$0.0800 |
| 100 | 857(E) 8890 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | 1,200 | EA |
$1.00 |
$1.52 |
| 101 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 59,314 | LF |
$0.5000 |
$0.0800 |
| 102 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 19,680 | SD |
$0.2000 |
$0.3000 |
| 103 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,040 | SD |
$0.5000 |
$1.21 |
| 104 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 2,520 | SD |
$0.9000 |
$6.07 |
| 105 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 480 | SD |
$1.10 |
$2.43 |
| 106 | 880(C) 8848 |
WING BARRICADES | 720 | SD |
$1.40 |
$2.43 |
| 107 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 1,920 | SD |
$0.5000 |
$6.07 |
| 108 | 880(F) 8878 |
DRUMS | 32,320 | SD |
$0.4000 |
$0.3000 |
| 109 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 564 | SD |
$15.00 |
$8.49 |
| 110 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$35,000.00 |
$30,941.64 |
| 111 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$1,820.09 |
| 112 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$65,000.00 |
$291,671.84 |