| 1 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 10,900 | TON |
$70.00 |
$85.00 |
$83.75 |
$95.30 |
$95.55 |
| 2 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 5,700 | TON |
$68.00 |
$73.00 |
$80.40 |
$86.00 |
$86.90 |
| 3 | 411(H) 6210 |
SUPERPAVE, TYPE S3(PATCH)(PG64-22OK) | 540 | TON |
$200.00 |
$130.00 |
$125.00 |
$109.65 |
$125.00 |
| 4 | 412 5267 |
COLD MILLING PAVEMENT | 143,900 | SY |
$1.75 |
$0.8500 |
$1.65 |
$2.15 |
$3.45 |
| 5 | 413(A) 4870 |
RUMBLE STRIP-CENTERLINE HMA-CON | 26,350 | LF |
$0.3000 |
$0.1200 |
$0.1300 |
$0.1800 |
$0.1900 |
| 6 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 52,700 | LF |
$0.5000 |
$0.0800 |
$0.1300 |
$0.1300 |
$0.1200 |
| 7 | 828(B) 8136 |
LOOP DETECTOR WIRE | 1,300 | LF |
$7.00 |
$10.95 |
$9.95 |
$10.25 |
$10.90 |
| 8 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 114,250 | LF |
$0.4400 |
$0.3300 |
$0.3500 |
$0.3400 |
$0.3600 |
| 9 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 712 | LF |
$10.00 |
$3.75 |
$4.00 |
$3.86 |
$4.10 |
| 10 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$60,000.00 |
$23,472.48 |
$94,500.00 |
$30,000.00 |
$37,470.30 |