| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$50,000.00 |
$25,000.00 |
$25,400.00 |
$24,000.00 |
$49,612.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 16,553 | CY |
$7.00 |
$10.00 |
$8.25 |
$8.00 |
$9.15 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 5,603 | CY |
$9.00 |
$10.00 |
$11.80 |
$12.00 |
$10.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$50,000.00 |
$18,000.00 |
$62,000.00 |
$40,000.00 |
$43,816.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 7,212 | LF |
$2.00 |
$1.00 |
$3.10 |
$3.20 |
$2.00 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 679 | LF |
$8.00 |
$9.00 |
$19.60 |
$20.15 |
$6.75 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 68,273 | SY |
$1.70 |
$4.00 |
$4.10 |
$4.20 |
$4.74 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 17.94 | AC |
$400.00 |
$650.00 |
$1,250.00 |
$1,330.00 |
$1,687.00 |
| 9 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 3,295 | CY |
$35.00 |
$40.00 |
$50.40 |
$50.00 |
$52.50 |
| 10 | 310(B) 0149 |
SUBGRADE, METHOD B | 15,436 | SY |
$1.00 |
$0.5000 |
$0.3000 |
$0.7000 |
$1.70 |
| 11 | 325 5271 |
SEPARATOR FABRIC | 15,436 | SY |
$1.00 |
$1.00 |
$1.10 |
$1.40 |
$1.70 |
| 12 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 369 | TON |
$28.00 |
$20.00 |
$30.00 |
$25.00 |
$33.00 |
| 13 | 407(B) 0250 |
TACK COAT | 1,288 | GAL |
$3.00 |
$2.00 |
$2.00 |
$2.40 |
$5.00 |
| 14 | 408 5774 |
PRIME COAT | 8,064 | GAL |
$4.00 |
$1.00 |
$3.50 |
$3.40 |
$4.40 |
| 15 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 2,168 | TON |
$72.00 |
$65.00 |
$79.25 |
$75.00 |
$83.00 |
| 16 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 2,815 | TON |
$78.00 |
$75.00 |
$94.40 |
$90.00 |
$101.75 |
| 17 | 412 5267 |
COLD MILLING PAVEMENT | 5,500 | SY |
$2.50 |
$1.00 |
$4.10 |
$3.00 |
$3.25 |
| 18 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 85 | CY |
$24.00 |
$50.00 |
$11.50 |
$42.00 |
$25.00 |
| 19 | 509(B) 0321 |
CLASS A CONCRETE | 179 | CY |
$500.00 |
$750.00 |
$520.00 |
$495.00 |
$738.00 |
| 20 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$400.00 |
$350.00 |
$600.00 |
$585.00 |
$439.00 |
| 21 | 511(A) 0332 |
REINFORCING STEEL | 23,236 | LB |
$1.00 |
$1.00 |
$0.2500 |
$0.7000 |
$1.00 |
| 22 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 377 | TON |
$45.00 |
$45.00 |
$48.00 |
$45.00 |
$46.50 |
| 23 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 189 | TON |
$35.00 |
$40.00 |
$48.00 |
$35.00 |
$38.00 |
| 24 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 54 | LF |
$100.00 |
$100.00 |
$120.00 |
$115.00 |
$98.00 |
| 25 | 613(EE) 5610 |
(SP) 18" CORRUGATED POLYPROPYLENE PIPE | 224 | LF |
$40.00 |
$70.00 |
$42.90 |
$45.00 |
$73.00 |
| 26 | 613(L) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$1,500.00 |
$1,900.00 |
$1,800.00 |
$655.00 |
$1,687.50 |
| 27 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 10 | EA |
$1,000.00 |
$1,200.00 |
$972.00 |
$2,900.00 |
$1,215.00 |
| 28 | 613(T) 1187 |
STANDARD BEDDING MATERIAL, CLASS C | 88 | CY |
$20.00 |
$50.00 |
$47.00 |
$36.00 |
$27.00 |
| 29 | 613(V) 1180 |
TRENCH EXCAVATION | 177 | CY |
$8.00 |
$20.00 |
$15.50 |
$10.00 |
$11.00 |
| 30 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$20,000.00 |
$45,000.00 |
$9,650.00 |
$23,261.00 |
$20,288.00 |
| 31 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 2,951 | SY |
$4.00 |
$6.00 |
$4.60 |
$4.85 |
$6.00 |
| 32 | 624(C) 4458 |
FENCE-STYLE SWF (4 BARBED WIRE) | 5,992 | LF |
$5.00 |
$9.00 |
$6.20 |
$4.30 |
$5.50 |
| 33 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 1,560 | LF |
$6.00 |
$9.25 |
$6.75 |
$4.50 |
$5.65 |
| 34 | 624(D) 4470 |
GATE, GALVANIZED STEEL | 2 | EA |
$700.00 |
$2,000.00 |
$775.00 |
$532.00 |
$675.00 |
| 35 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 2 | EA |
$100.00 |
$100.00 |
$75.00 |
$79.00 |
$101.00 |
| 36 | 629(C) 4960 |
MAILBOX | 2 | EA |
$50.00 |
$50.00 |
$26.00 |
$27.00 |
$33.75 |
| 37 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 2 | EA |
$100.00 |
$50.00 |
$11.00 |
$11.00 |
$13.50 |
| 38 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 17 | SF |
$20.00 |
$20.00 |
$20.50 |
$22.00 |
$27.00 |
| 39 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 26 | LF |
$20.00 |
$10.00 |
$6.20 |
$6.40 |
$8.00 |
| 40 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 14,424 | LF |
$0.7500 |
$0.7000 |
$0.5000 |
$0.5000 |
$0.5000 |
| 41 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$20,000.00 |
$28,103.20 |
$8,400.00 |
$8,500.00 |
$10,935.00 |
| 42 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$20,000.00 |
$15,000.00 |
$18,400.00 |
$22,000.00 |
$16,875.00 |
| 43 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$4,000.00 |
$5,000.00 |
$7,700.00 |
$6,000.00 |
$3,341.00 |
| 44 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$100,000.00 |
$115,000.00 |
$88,000.00 |
$109,000.00 |
$81,810.00 |