Bid tab 180195

Let May 17, 2018 · Division 3 · Hughes Sign up free

‹ May 2018 results

BRIDGE AND APPROACHES SH -9: OVER FISH CREEK, 0.4 MILES EAST OF THE SH -84 JUNCTION NEAR DUSTIN. PROJECT LENGTH = 0.492 MILE

Let date
Thursday, May 17, 2018
Contract
180195
J/P numbers
28939(04)
District
Division 3
County
Hughes
Highway
Limits
BRIDGE AND APPROACHES SH -9: OVER FISH CREEK, 0.4 MILES EAST OF THE SH -84 JUNCTION NEAR DUSTIN. PROJECT LENGTH = 0.492 MILE
Project number
STP-232C(059)PM

Bidders 5

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$2,662,088
1 C-GAWF CONSTRUCTION, INC. Low bidder $2,498,300 -6.2%
3 T. McDonald Construction, Inc. $2,527,841 -5.0% +1.2%
4 RRY SERVICES LLC $2,587,118 -2.8% +3.6%
5 FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC. $2,675,305 +0.5% +7.1%
6 C3 Construction, Inc. $2,688,612 +1.0% +7.6%

Bid tab: unit prices 87 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 C-GAWF CONSTRUC…#3 T. McDonald Con…#4 RRY SERVICES LLC#5 FRONTIER BRIDGE…#6 C3 Construction…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $20,000.00 $22,500.00 $30,000.00 $34,000.00 $39,270.00 $16,727.20
2202(A) 0183 UNCLASSIFIED EXCAVATION18,720CY $8.00 $6.25 $5.75 $6.45 $5.80 $6.27
3202(D) 0184 UNCLASSIFIED BORROW15,777CY $10.00 $7.50 $7.95 $7.45 $6.67 $8.66
4205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $35,000.00 $22,500.00 $15,000.00 $14,700.00 $15,810.00 $25,470.74
5221(C) 2801 TEMPORARY SILT FENCE3,755LF $2.00 $4.25 $1.90 $3.99 $4.07 $4.77
6221(F) 0100 TEMPORARY SILT DIKE105LF $10.00 $16.50 $8.00 $14.99 $15.29 $17.91
7221(G) 0150 TEMPORARY ROCK FILTER DAM TYPE 135CY $120.00 $75.00 $30.00 $110.00 $96.70 $35.84
8230(A) 2806 SOLID SLAB SODDING24,144SY $2.00 $4.25 $4.15 $3.95 $4.03 $4.72
9233(A) 2817 VEGETATIVE MULCHING5AC $630.00 $1,650.00 $1,500.00 $1,450.00 $1,479.00 $1,732.46
10303(A) 2100 AGGREGATE BASE TYPE A2,701CY $50.00 $54.00 $43.25 $67.00 $50.37 $65.71
11307(K) 4300 STABILIZED SUBGRADE13,136SY $7.00 $6.75 $6.95 $5.40 $6.38 $5.97
12325 5271 SEPARATOR FABRIC13,136SY $1.50 $1.00 $1.95 $1.20 $1.19 $2.81
13402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E1,892TON $40.00 $31.25 $26.00 $35.00 $25.87 $35.84
14407(B) 0250 TACK COAT2,367GAL $4.00 $4.40 $4.00 $3.93 $4.01 $4.78
15408 5774 PRIME COAT3,039GAL $6.00 $5.65 $5.00 $4.76 $4.86 $1.19
16411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)3,788TON $80.00 $82.36 $79.25 $74.19 $75.67 $94.39
17411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)818TON $100.00 $94.33 $90.50 $84.34 $86.03 $99.17
18412 5267 COLD MILLING PAVEMENT183SY $15.00 $14.44 $14.00 $12.00 $12.24 $53.77
19509(A) 0319 CLASS AA CONCRETE189CY $600.00 $425.00 $425.00 $500.00 $549.85 $381.48
20511(A) 0332 REINFORCING STEEL29,342LB $1.00 $1.10 $0.9000 $0.9000 $1.19 $0.9900
21601(A) 0297 TYPE I PLAIN RIPRAP51TON $55.00 $52.50 $44.00 $54.00 $59.60 $46.90
22613(B) 0689 18" CORR. GALV. STEEL PIPE84LF $35.00 $26.00 $32.00 $31.00 $32.39 $34.05
23613(B) 4531 49" X 33" CORR. GALV. STEEL PIPE ARCH60LF $70.00 $48.50 $64.00 $75.00 $69.36 $71.45
24613(M) 7186 TYPE A4 CULVERT END TREATMENT4EA $1,200.00 $1,725.00 $1,850.00 $1,650.00 $1,293.64 $203.83
25619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $10,000.00 $7,250.00 $10,000.00 $9,700.00 $7,028.82 $2,389.60
26619(B) 4725 REMOVAL OF FENCE3,065LF $1.30 $1.10 $2.00 $1.00 $1.21 $1.19
27619(B) 4728 REMOVAL OF ASPHALT PAVEMENT2,936SY $5.00 $2.00 $8.00 $4.00 $3.61 $5.97
28619(B) 4780 REMOVAL OF GUARDRAIL560LF $4.00 $1.00 $2.50 $4.00 $3.06 $2.39
29623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE300LF $20.00 $23.35 $19.75 $18.75 $19.13 $25.57
30623(G) 8590 GUARDRAIL END TREATMENT (31")4EA $2,500.00 $2,880.00 $2,500.00 $2,365.00 $2,412.30 $3,106.48
31623(I) 8700 GUARDRAIL BRIDGE CONN-THRIE BEAM (31")4EA $2,000.00 $2,190.00 $1,850.00 $1,725.00 $1,759.50 $2,270.12
32624(C) 4458 FENCE-STYLE SWF (4 BARBED WIRE)1,379LF $5.00 $3.33 $6.50 $3.45 $4.23 $3.56
33624(C) 4459 FENCE-STYLE SWF (5 BARBED WIRE)1,714LF $6.00 $3.60 $7.00 $4.05 $4.44 $3.88
34501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON192.4CY $25.00 $12.50 $22.00 $15.00 $21.80 $13.14
35501(G) 6309 CLSM BACKFILL310CY $180.00 $135.00 $180.00 $175.00 $144.89 $148.16
36503(A) 1312 PRESTRESSED CONCRETE BEAMS (TYPE III)656LF $200.00 $192.00 $230.00 $230.00 $217.98 $210.44
37504(A) 1304 APPROACH SLAB299.8SY $200.00 $155.00 $210.00 $260.00 $243.72 $246.91
38504(B) 1305 SAW-CUT GROOVING1,034.2SY $5.00 $4.00 $5.50 $3.80 $4.14 $4.54
39504(C) 6250 SEALED EXPANSION JOINT48.64LF $275.00 $265.00 $220.00 $260.00 $213.04 $213.87
40504(D) 6245 CONCRETE RAIL (TR4)464.7LF $85.00 $65.00 $85.00 $75.00 $89.94 $76.95
41506(A) 1322 STRUCTURAL STEEL1,630LB $3.00 $2.82 $2.25 $3.75 $2.52 $3.41
42507(A) 6170 STAINLESS STEEL FIXED BEARING ASSEMBLY8EA $2,000.00 $1,250.00 $1,300.00 $1,450.00 $1,122.41 $1,168.93
43507(B) 6174 STAINLESS STEEL EXPANSION BEARING ASSEMBLY16EA $2,000.00 $1,250.00 $1,300.00 $1,450.00 $1,434.61 $1,168.93
44509(A) 1326 CLASS AA CONCRETE204.3CY $600.00 $575.00 $550.00 $575.00 $587.58 $493.45
45509(B) 1328 CLASS A CONCRETE174.8CY $620.00 $575.00 $550.00 $575.00 $614.83 $749.86
46509(D) 1331 CLASS C CONCRETE11.7CY $300.00 $1,000.00 $975.00 $350.00 $615.03 $312.38
47511(B) 6010 EPOXY COATED REINFORCING STEEL90,120LB $1.10 $1.12 $1.25 $1.05 $1.23 $1.10
48514(A) 6010 PILES, FURNISHED (HP 10X42)94LF $35.00 $34.55 $43.00 $45.00 $45.10 $30.43
49514(A) 6011 PILES, FURNISHED (HP 12X53)277LF $45.00 $45.55 $38.00 $55.00 $54.00 $35.20
50514(B) 6292 PILES, DRIVEN (HP 10X42)94LF $20.00 $10.00 $25.00 $10.00 $19.62 $14.34
51514(B) 6294 PILES, DRIVEN (HP 12X53)277LF $20.00 $10.00 $25.00 $10.00 $21.80 $14.34
52514(K) 6260 (PL)PILOT HOLES135LF $150.00 $225.00 $300.00 $250.00 $207.84 $119.48
53514(L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $400.00 $400.00 $400.00 $400.00 $400.00 $400.00
54515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)866SY $5.00 $5.25 $5.00 $3.50 $3.82 $4.18
55516(A) 6096 DRILLED SHAFTS 60" DIAMETER148LF $800.00 $999.00 $900.00 $900.00 $1,488.25 $791.22
56516(C) 6200 CROSSHOLE SONIC LOGGING4EA $2,000.00 $2,500.00 $2,500.00 $2,400.00 $2,888.50 $1,971.42
57523(A) 6550 SEALER CRACK PREPARATION46.3LF $5.00 $5.00 $24.00 $4.00 $4.36 $4.78
58523(B) 6560 SEALER RESIN0.6GAL $200.00 $250.00 $550.00 $150.00 $163.50 $179.23
59601(B) 1353 TYPE I-A PLAIN RIPRAP1,270TON $40.00 $42.00 $44.00 $45.00 $43.47 $46.90
60601(C) 1355 TYPE I-A FILTER BLANKET220TON $35.00 $35.00 $36.00 $42.00 $31.83 $37.16
61613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND100LF $25.00 $20.00 $19.00 $30.00 $22.32 $8.96
62613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.100LF $20.00 $20.00 $19.00 $30.00 $22.32 $8.96
63619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $60,000.00 $47,500.00 $17,500.00 $30,000.00 $54,500.00 $45,402.40
64805(A) 8724 (PL)REMOVAL OF EXISTING SIGNS15EA $60.00 $30.00 $60.00 $25.00 $25.50 $29.87
65850(A) 8110 SHEET ALUMINUM SIGNS135SF $20.00 $22.00 $16.00 $19.00 $19.38 $22.70
66851(C) 8327 2 1/4" SQUARE TUBE POST208LF $15.00 $12.00 $5.50 $10.00 $10.20 $11.95
67853 9069 GUARDRAIL DELINEATORS(TYPE 2, CODE 1)12EA $15.00 $18.00 $15.00 $16.00 $15.30 $19.12
68855(A) 8840 TRAFFIC STRIPE(PLASTIC)(THIN LINE)(4" WIDE)12,220LF $0.6000 $0.6000 $0.6000 $0.5000 $0.5100 $0.6000
69857(A) 8839 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE)18,880LF $0.1500 $0.1200 $0.2000 $0.1000 $0.1000 $0.1200
70857(E) 8890 (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2430EA $0.8000 $1.50 $0.5500 $1.25 $1.28 $1.49
71857(F) 8006 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE)31,100LF $0.2500 $0.0600 $0.1000 $0.0500 $0.0500 $0.0600
72871(B) 8705 (SP)CONST.ZONE IMPACT ATTEN.450SD $4.50 $6.00 $12.00 $5.00 $5.10 $5.97
73877(B) 8484 DELIVER PORTABLE LONGITUDINAL BARRIER2,775LF $20.00 $20.00 $17.00 $19.00 $15.30 $22.70
74877(C) 8486 RELOCATION OF PORTABLE LONGITUDINAL BARRIER2,415LF $4.50 $10.00 $3.00 $2.00 $5.10 $2.39
75880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF4,030SD $0.4000 $0.6000 $0.1200 $0.5000 $0.5100 $0.6000
76880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF2,190SD $1.00 $1.20 $0.6000 $1.00 $1.02 $1.19
77880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF2,050SD $1.50 $0.6000 $2.25 $0.5000 $0.5100 $0.6000
78880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)1,170SD $2.00 $1.20 $1.75 $1.00 $1.02 $1.19
79880(C) 8848 WING BARRICADES800SD $1.00 $1.20 $3.20 $1.00 $1.02 $1.19
80880(E) 8860 WARNING LIGHTS(TYPE A)1,470SD $0.5000 $2.20 $0.3000 $2.00 $2.04 $2.39
81880(F) 8878 DRUMS760SD $0.4000 $0.6000 $0.4000 $0.5000 $0.5100 $0.6000
82880(G) 8884 TUBE CHANNELIZERS760SD $0.1500 $0.6000 $0.4000 $0.5000 $0.5100 $0.6000
83882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN508SD $20.00 $12.50 $30.00 $10.00 $10.20 $11.95
84642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $20,000.00 $14,250.00 $12,000.00 $14,248.00 $22,542.00 $16,966.16
85220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $4,000.00 $4,250.00 $4,000.00 $1,275.00 $4,080.00 $1,792.20
86640(A) 1398 FIELD OFFICE1EA $10,000.00 $12,750.00 $2,500.00 $5,000.00 $13,260.00 $8,961.00
87641 1552 MOBILIZATION1LSUM $125,000.00 $72,500.00 $120,000.00 $157,000.00 $156,521.55 $152,934.41