| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$45,000.00 |
$20,000.00 |
$5,047.00 |
$28,000.00 |
$12,000.00 |
$14,980.00 |
$50,000.00 |
$25,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 4,803 | CY |
$10.00 |
$8.50 |
$12.36 |
$13.50 |
$11.75 |
$8.56 |
$10.50 |
$25.00 |
| 3 | 202(C) 0182 |
ROCK EXCAVATION | 250 | CY |
$25.00 |
$22.00 |
$32.96 |
$37.00 |
$33.00 |
$21.40 |
$30.00 |
$35.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$22,000.00 |
$14,000.00 |
$10,506.00 |
$11,200.00 |
$7,500.00 |
$8,560.00 |
$21,000.00 |
$15,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 91 | LF |
$4.50 |
$2.75 |
$4.12 |
$4.50 |
$5.00 |
$2.68 |
$4.40 |
$3.50 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 280 | LF |
$18.00 |
$13.20 |
$10.04 |
$15.00 |
$13.00 |
$12.84 |
$11.00 |
$13.00 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 13,924 | SY |
$3.50 |
$2.94 |
$2.63 |
$2.92 |
$2.27 |
$2.25 |
$3.00 |
$3.00 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 2.88 | AC |
$1,500.00 |
$1,320.00 |
$1,442.00 |
$1,250.00 |
$1,200.00 |
$1,284.00 |
$2,000.00 |
$1,400.00 |
| 9 | 233(E) 2822 |
EXCELSIOR MAT | 5,330 | SY |
$20.00 |
$5.50 |
$1.95 |
$5.29 |
$5.50 |
$5.30 |
$2.00 |
$6.00 |
| 10 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 2,020 | TON |
$30.00 |
$31.61 |
$31.93 |
$34.10 |
$32.00 |
$32.70 |
$34.00 |
$40.00 |
| 11 | 408 5774 |
PRIME COAT | 1,997 | GAL |
$5.50 |
$6.15 |
$5.87 |
$6.55 |
$5.50 |
$5.89 |
$6.00 |
$6.00 |
| 12 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$350.00 |
$350.00 |
$592.25 |
$325.00 |
$285.00 |
$560.19 |
$400.00 |
$500.00 |
| 13 | 613(A) 4497 |
36" X 22" R.C.PIPE ARCH CLASS A-III | 42 | LF |
$130.00 |
$88.00 |
$112.27 |
$136.00 |
$155.00 |
$152.85 |
$145.00 |
$140.00 |
| 14 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 54 | LF |
$35.00 |
$46.00 |
$29.87 |
$34.00 |
$45.00 |
$45.57 |
$30.00 |
$60.00 |
| 15 | 613(B) 0692 |
36" CORR. GALV. STEEL PIPE | 86 | LF |
$55.00 |
$71.00 |
$67.98 |
$72.00 |
$75.00 |
$60.02 |
$55.00 |
$100.00 |
| 16 | 613(L) 4526 |
36" X 22" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$1,300.00 |
$1,780.00 |
$1,670.66 |
$1,822.00 |
$2,000.00 |
$2,332.34 |
$1,875.00 |
$2,000.00 |
| 17 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$550.00 |
$245.00 |
$264.71 |
$375.00 |
$250.00 |
$825.41 |
$225.00 |
$800.00 |
| 18 | 613(M) 7189 |
TYPE D4 CULVERT END TREATMENT | 2 | EA |
$2,000.00 |
$2,000.00 |
$2,729.50 |
$2,450.00 |
$2,900.00 |
$4,068.08 |
$1,800.00 |
$1,500.00 |
| 19 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$12,000.00 |
$6,000.00 |
$3,605.00 |
$6,500.00 |
$8,000.00 |
$6,420.00 |
$15,000.00 |
$15,000.00 |
| 20 | 624(A) 4281 |
FENCE-STYLE WWF | 2,130 | LF |
$9.00 |
$9.24 |
$5.66 |
$9.24 |
$8.40 |
$8.99 |
$9.25 |
$15.00 |
| 21 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 1,044 | LF |
$7.00 |
$7.70 |
$4.89 |
$7.51 |
$6.95 |
$7.44 |
$7.65 |
$12.00 |
| 22 | 624(C) 7181 |
FENCE-STYLE SWF (6 BARBED WIRE) | 525 | LF |
$7.50 |
$8.20 |
$5.15 |
$8.05 |
$7.45 |
$7.97 |
$8.20 |
$15.00 |
| 23 | 624(D) 4470 |
GATE, GALVANIZED STEEL | 2 | EA |
$1,000.00 |
$1,375.00 |
$824.00 |
$1,500.00 |
$1,250.00 |
$1,337.50 |
$1,400.00 |
$1,000.00 |
| 24 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 180 | CY |
$17.00 |
$11.50 |
$36.05 |
$16.00 |
$25.00 |
$21.40 |
$20.00 |
$25.00 |
| 25 | 501(G) 6309 |
CLSM BACKFILL | 76 | CY |
$220.00 |
$170.00 |
$243.36 |
$210.25 |
$215.00 |
$173.15 |
$200.00 |
$200.00 |
| 26 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 194 | LF |
$220.00 |
$258.50 |
$239.20 |
$276.90 |
$260.00 |
$264.16 |
$225.00 |
$250.00 |
| 27 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 191.2 | LF |
$78.00 |
$90.50 |
$83.15 |
$87.00 |
$115.00 |
$96.36 |
$90.00 |
$140.00 |
| 28 | 506(A) 1322 |
STRUCTURAL STEEL | 510 | LB |
$3.00 |
$3.70 |
$3.15 |
$3.50 |
$3.50 |
$4.31 |
$4.00 |
$3.00 |
| 29 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 3 | EA |
$800.00 |
$1,020.00 |
$1,363.59 |
$960.00 |
$1,500.00 |
$1,262.21 |
$900.00 |
$900.00 |
| 30 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 3 | EA |
$800.00 |
$1,020.00 |
$1,363.59 |
$960.00 |
$1,500.00 |
$1,262.21 |
$900.00 |
$900.00 |
| 31 | 509(A) 1326 |
CLASS AA CONCRETE | 53 | CY |
$700.00 |
$705.00 |
$872.98 |
$775.00 |
$810.00 |
$862.79 |
$850.00 |
$800.00 |
| 32 | 509(B) 1328 |
CLASS A CONCRETE | 66.2 | CY |
$700.00 |
$725.00 |
$872.98 |
$750.00 |
$810.00 |
$807.81 |
$850.00 |
$800.00 |
| 33 | 511(A) 1332 |
REINFORCING STEEL | 21,660 | LB |
$1.10 |
$1.01 |
$1.78 |
$1.12 |
$1.20 |
$1.33 |
$1.00 |
$2.00 |
| 34 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 78 | LF |
$35.00 |
$46.90 |
$30.80 |
$36.03 |
$40.00 |
$48.21 |
$30.00 |
$30.00 |
| 35 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 161 | LF |
$40.00 |
$54.60 |
$41.65 |
$41.62 |
$50.00 |
$55.05 |
$35.00 |
$40.00 |
| 36 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 78 | LF |
$15.00 |
$20.10 |
$20.60 |
$18.00 |
$10.00 |
$21.40 |
$20.00 |
$35.00 |
| 37 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 161 | LF |
$15.00 |
$23.40 |
$20.60 |
$14.00 |
$10.00 |
$32.10 |
$25.00 |
$35.00 |
| 38 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 39 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 370 | TON |
$45.00 |
$46.88 |
$48.88 |
$45.00 |
$55.00 |
$74.56 |
$48.00 |
$60.00 |
| 40 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 120 | TON |
$42.00 |
$35.33 |
$37.39 |
$40.00 |
$50.00 |
$63.03 |
$38.00 |
$45.00 |
| 41 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 52 | LF |
$30.00 |
$30.00 |
$12.14 |
$35.00 |
$40.00 |
$33.87 |
$30.00 |
$25.00 |
| 42 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 50 | LF |
$20.00 |
$30.00 |
$12.14 |
$30.00 |
$40.00 |
$41.36 |
$30.00 |
$25.00 |
| 43 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$20,000.00 |
$7,000.00 |
$1,545.00 |
$13,000.00 |
$12,500.00 |
$11,770.00 |
$35,000.00 |
$20,000.00 |
| 44 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 180 | CY |
$17.00 |
$11.50 |
$36.05 |
$16.00 |
$25.00 |
$32.10 |
$20.00 |
$25.00 |
| 45 | 501(G) 6309 |
CLSM BACKFILL | 76 | CY |
$220.00 |
$170.00 |
$243.36 |
$210.25 |
$215.00 |
$173.15 |
$200.00 |
$200.00 |
| 46 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 224 | LF |
$220.00 |
$251.00 |
$226.73 |
$262.49 |
$275.00 |
$225.53 |
$225.00 |
$250.00 |
| 47 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 211.2 | LF |
$78.00 |
$90.50 |
$83.15 |
$87.00 |
$100.00 |
$96.36 |
$90.00 |
$140.00 |
| 48 | 506(A) 1322 |
STRUCTURAL STEEL | 510 | LB |
$3.00 |
$3.70 |
$3.15 |
$3.20 |
$3.50 |
$4.31 |
$4.00 |
$3.00 |
| 49 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 3 | EA |
$800.00 |
$1,095.00 |
$1,285.36 |
$960.00 |
$1,500.00 |
$1,133.50 |
$850.00 |
$900.00 |
| 50 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 3 | EA |
$800.00 |
$1,095.00 |
$1,285.36 |
$960.00 |
$1,500.00 |
$1,187.00 |
$850.00 |
$900.00 |
| 51 | 509(A) 1326 |
CLASS AA CONCRETE | 60.1 | CY |
$700.00 |
$705.00 |
$872.98 |
$775.00 |
$810.00 |
$914.23 |
$850.00 |
$800.00 |
| 52 | 509(B) 1328 |
CLASS A CONCRETE | 66.2 | CY |
$700.00 |
$725.00 |
$872.98 |
$750.00 |
$810.00 |
$855.61 |
$850.00 |
$800.00 |
| 53 | 511(A) 1332 |
REINFORCING STEEL | 23,310 | LB |
$1.10 |
$1.01 |
$1.83 |
$1.12 |
$1.20 |
$1.33 |
$1.00 |
$2.00 |
| 54 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 202 | LF |
$35.00 |
$29.40 |
$26.74 |
$36.73 |
$40.00 |
$37.41 |
$30.00 |
$30.00 |
| 55 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 471 | LF |
$40.00 |
$33.60 |
$33.44 |
$39.61 |
$50.00 |
$42.78 |
$35.00 |
$40.00 |
| 56 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 202 | LF |
$15.00 |
$12.60 |
$20.60 |
$16.00 |
$10.00 |
$32.10 |
$20.00 |
$35.00 |
| 57 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 471 | LF |
$15.00 |
$14.40 |
$20.60 |
$14.00 |
$10.00 |
$21.40 |
$25.00 |
$35.00 |
| 58 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 59 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 420 | TON |
$45.00 |
$46.88 |
$54.03 |
$45.00 |
$55.00 |
$58.51 |
$48.00 |
$60.00 |
| 60 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 130 | TON |
$42.00 |
$35.33 |
$42.54 |
$40.00 |
$50.00 |
$46.98 |
$38.00 |
$45.00 |
| 61 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 52 | LF |
$30.00 |
$30.00 |
$12.14 |
$35.00 |
$40.00 |
$30.36 |
$30.00 |
$25.00 |
| 62 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 60 | LF |
$20.00 |
$30.00 |
$12.14 |
$30.00 |
$40.00 |
$35.23 |
$30.00 |
$25.00 |
| 63 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$20,000.00 |
$7,000.00 |
$2,575.00 |
$13,500.00 |
$10,000.00 |
$11,770.00 |
$25,000.00 |
$20,000.00 |
| 64 | 623(F) 4446 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 8 | EA |
$2,000.00 |
$1,980.00 |
$1,854.00 |
$1,650.00 |
$2,000.00 |
$1,926.00 |
$1,980.00 |
$2,200.00 |
| 65 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 8 | EA |
$2,000.00 |
$1,567.50 |
$1,467.75 |
$2,450.00 |
$1,550.00 |
$1,524.75 |
$1,575.00 |
$1,800.00 |
| 66 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$8,500.00 |
$6,180.00 |
$4,000.00 |
$6,000.00 |
$6,420.00 |
$6,600.00 |
$7,000.00 |
| 67 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,700.00 |
$12,000.00 |
$7,107.00 |
$12,500.00 |
$7,400.00 |
$7,918.00 |
$7,600.00 |
$20,000.00 |
| 68 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$5,000.00 |
$2,575.00 |
$4,000.00 |
$500.00 |
$5,350.00 |
$6,000.00 |
$3,000.00 |
| 69 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$78,800.00 |
$60,000.00 |
$54,690.93 |
$60,000.00 |
$77,000.00 |
$75,821.91 |
$55,000.00 |
$70,000.00 |