BRIDGES AND APPROACHES COUNTY ROAD (EW-207): OVER BAKER CR AND TRIBUTARY TO BAKER CR, 4.0 MILES AND 3.0 MILES WEST OF THE SH -32 NEAR GRADY. PROJECT LENGTH = 0.381 MILE

Let date
Thursday, April 16, 2020
Contract
200153
J/P numbers
29359(04)
District
County
Jefferson
Highway
Limits
BRIDGES AND APPROACHES COUNTY ROAD (EW-207): OVER BAKER CR AND TRIBUTARY TO BAKER CR, 4.0 MILES AND 3.0 MILES WEST OF THE SH -32 NEAR GRADY. PROJECT LENGTH = 0.381 MILE
Project number
STP-234D(050)CI

Bidders 7

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$1,094,977
1 K & R BUILDERS, INC. Low bidder $939,293 -14.2%
2 Treas Construction Inc $966,019 -11.8% +2.8%
3 BRIDGECO CONTRACTORS, INC. $1,019,508 -6.9% +8.5%
4 RRY SERVICES LLC $1,026,628 -6.2% +9.3%
5 Frontier Bridge, Inc. $1,039,789 -5.0% +10.7%
6 SEWELL BROS., INC. $1,051,591 -4.0% +12.0%
7 EARTH BUILDERS, L.P. $1,246,859 +13.9% +32.7%

Bid tab: unit prices 69 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 K & R BUILDERS,…#2 Treas Construct…#3 BRIDGECO CONTRA…#4 RRY SERVICES LLC#5 Frontier Bridge…#6 SEWELL BROS., I…#7 EARTH BUILDERS,…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $45,000.00 $20,000.00 $5,047.00 $28,000.00 $12,000.00 $14,980.00 $50,000.00 $25,000.00
2202(A) 0183 UNCLASSIFIED EXCAVATION4,803CY $10.00 $8.50 $12.36 $13.50 $11.75 $8.56 $10.50 $25.00
3202(C) 0182 ROCK EXCAVATION250CY $25.00 $22.00 $32.96 $37.00 $33.00 $21.40 $30.00 $35.00
4205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $22,000.00 $14,000.00 $10,506.00 $11,200.00 $7,500.00 $8,560.00 $21,000.00 $15,000.00
5221(C) 2801 TEMPORARY SILT FENCE91LF $4.50 $2.75 $4.12 $4.50 $5.00 $2.68 $4.40 $3.50
6221(F) 0100 TEMPORARY SILT DIKE280LF $18.00 $13.20 $10.04 $15.00 $13.00 $12.84 $11.00 $13.00
7230(A) 2806 SOLID SLAB SODDING13,924SY $3.50 $2.94 $2.63 $2.92 $2.27 $2.25 $3.00 $3.00
8233(A) 2817 VEGETATIVE MULCHING2.88AC $1,500.00 $1,320.00 $1,442.00 $1,250.00 $1,200.00 $1,284.00 $2,000.00 $1,400.00
9233(E) 2822 EXCELSIOR MAT5,330SY $20.00 $5.50 $1.95 $5.29 $5.50 $5.30 $2.00 $6.00
10402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E2,020TON $30.00 $31.61 $31.93 $34.10 $32.00 $32.70 $34.00 $40.00
11408 5774 PRIME COAT1,997GAL $5.50 $6.15 $5.87 $6.55 $5.50 $5.89 $6.00 $6.00
12509(D) 0325 CLASS C CONCRETE10CY $350.00 $350.00 $592.25 $325.00 $285.00 $560.19 $400.00 $500.00
13613(A) 4497 36" X 22" R.C.PIPE ARCH CLASS A-III42LF $130.00 $88.00 $112.27 $136.00 $155.00 $152.85 $145.00 $140.00
14613(B) 0689 18" CORR. GALV. STEEL PIPE54LF $35.00 $46.00 $29.87 $34.00 $45.00 $45.57 $30.00 $60.00
15613(B) 0692 36" CORR. GALV. STEEL PIPE86LF $55.00 $71.00 $67.98 $72.00 $75.00 $60.02 $55.00 $100.00
16613(L) 4526 36" X 22" PREFAB. CULVERT END SECTION, ARCH2EA $1,300.00 $1,780.00 $1,670.66 $1,822.00 $2,000.00 $2,332.34 $1,875.00 $2,000.00
17613(L) 5726 18" PREFAB. CULVERT END SECTION, ROUND2EA $550.00 $245.00 $264.71 $375.00 $250.00 $825.41 $225.00 $800.00
18613(M) 7189 TYPE D4 CULVERT END TREATMENT2EA $2,000.00 $2,000.00 $2,729.50 $2,450.00 $2,900.00 $4,068.08 $1,800.00 $1,500.00
19619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $12,000.00 $6,000.00 $3,605.00 $6,500.00 $8,000.00 $6,420.00 $15,000.00 $15,000.00
20624(A) 4281 FENCE-STYLE WWF2,130LF $9.00 $9.24 $5.66 $9.24 $8.40 $8.99 $9.25 $15.00
21624(C) 4459 FENCE-STYLE SWF (5 BARBED WIRE)1,044LF $7.00 $7.70 $4.89 $7.51 $6.95 $7.44 $7.65 $12.00
22624(C) 7181 FENCE-STYLE SWF (6 BARBED WIRE)525LF $7.50 $8.20 $5.15 $8.05 $7.45 $7.97 $8.20 $15.00
23624(D) 4470 GATE, GALVANIZED STEEL2EA $1,000.00 $1,375.00 $824.00 $1,500.00 $1,250.00 $1,337.50 $1,400.00 $1,000.00
24501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON180CY $17.00 $11.50 $36.05 $16.00 $25.00 $21.40 $20.00 $25.00
25501(G) 6309 CLSM BACKFILL76CY $220.00 $170.00 $243.36 $210.25 $215.00 $173.15 $200.00 $200.00
26503(A) 1312 PRESTRESSED CONCRETE BEAMS (TYPE III)194LF $220.00 $258.50 $239.20 $276.90 $260.00 $264.16 $225.00 $250.00
27504(D) 6239 CONCRETE RAIL (TR3)191.2LF $78.00 $90.50 $83.15 $87.00 $115.00 $96.36 $90.00 $140.00
28506(A) 1322 STRUCTURAL STEEL510LB $3.00 $3.70 $3.15 $3.50 $3.50 $4.31 $4.00 $3.00
29507(A) 6172 WEATHERING STEEL FIXED BEARING ASSEMBLY3EA $800.00 $1,020.00 $1,363.59 $960.00 $1,500.00 $1,262.21 $900.00 $900.00
30507(B) 6176 WEATHERING STEEL EXPANSION BEARING ASSEMBLY3EA $800.00 $1,020.00 $1,363.59 $960.00 $1,500.00 $1,262.21 $900.00 $900.00
31509(A) 1326 CLASS AA CONCRETE53CY $700.00 $705.00 $872.98 $775.00 $810.00 $862.79 $850.00 $800.00
32509(B) 1328 CLASS A CONCRETE66.2CY $700.00 $725.00 $872.98 $750.00 $810.00 $807.81 $850.00 $800.00
33511(A) 1332 REINFORCING STEEL21,660LB $1.10 $1.01 $1.78 $1.12 $1.20 $1.33 $1.00 $2.00
34514(A) 6010 PILES, FURNISHED (HP 10X42)78LF $35.00 $46.90 $30.80 $36.03 $40.00 $48.21 $30.00 $30.00
35514(A) 6011 PILES, FURNISHED (HP 12X53)161LF $40.00 $54.60 $41.65 $41.62 $50.00 $55.05 $35.00 $40.00
36514(B) 6292 PILES, DRIVEN (HP 10X42)78LF $15.00 $20.10 $20.60 $18.00 $10.00 $21.40 $20.00 $35.00
37514(B) 6294 PILES, DRIVEN (HP 12X53)161LF $15.00 $23.40 $20.60 $14.00 $10.00 $32.10 $25.00 $35.00
38514(L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00
39601(B) 1353 TYPE I-A PLAIN RIPRAP370TON $45.00 $46.88 $48.88 $45.00 $55.00 $74.56 $48.00 $60.00
40601(C) 1355 TYPE I-A FILTER BLANKET120TON $42.00 $35.33 $37.39 $40.00 $50.00 $63.03 $38.00 $45.00
41613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND52LF $30.00 $30.00 $12.14 $35.00 $40.00 $33.87 $30.00 $25.00
42613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.50LF $20.00 $30.00 $12.14 $30.00 $40.00 $41.36 $30.00 $25.00
43619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $20,000.00 $7,000.00 $1,545.00 $13,000.00 $12,500.00 $11,770.00 $35,000.00 $20,000.00
44501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON180CY $17.00 $11.50 $36.05 $16.00 $25.00 $32.10 $20.00 $25.00
45501(G) 6309 CLSM BACKFILL76CY $220.00 $170.00 $243.36 $210.25 $215.00 $173.15 $200.00 $200.00
46503(A) 1312 PRESTRESSED CONCRETE BEAMS (TYPE III)224LF $220.00 $251.00 $226.73 $262.49 $275.00 $225.53 $225.00 $250.00
47504(D) 6239 CONCRETE RAIL (TR3)211.2LF $78.00 $90.50 $83.15 $87.00 $100.00 $96.36 $90.00 $140.00
48506(A) 1322 STRUCTURAL STEEL510LB $3.00 $3.70 $3.15 $3.20 $3.50 $4.31 $4.00 $3.00
49507(A) 6172 WEATHERING STEEL FIXED BEARING ASSEMBLY3EA $800.00 $1,095.00 $1,285.36 $960.00 $1,500.00 $1,133.50 $850.00 $900.00
50507(B) 6176 WEATHERING STEEL EXPANSION BEARING ASSEMBLY3EA $800.00 $1,095.00 $1,285.36 $960.00 $1,500.00 $1,187.00 $850.00 $900.00
51509(A) 1326 CLASS AA CONCRETE60.1CY $700.00 $705.00 $872.98 $775.00 $810.00 $914.23 $850.00 $800.00
52509(B) 1328 CLASS A CONCRETE66.2CY $700.00 $725.00 $872.98 $750.00 $810.00 $855.61 $850.00 $800.00
53511(A) 1332 REINFORCING STEEL23,310LB $1.10 $1.01 $1.83 $1.12 $1.20 $1.33 $1.00 $2.00
54514(A) 6010 PILES, FURNISHED (HP 10X42)202LF $35.00 $29.40 $26.74 $36.73 $40.00 $37.41 $30.00 $30.00
55514(A) 6011 PILES, FURNISHED (HP 12X53)471LF $40.00 $33.60 $33.44 $39.61 $50.00 $42.78 $35.00 $40.00
56514(B) 6292 PILES, DRIVEN (HP 10X42)202LF $15.00 $12.60 $20.60 $16.00 $10.00 $32.10 $20.00 $35.00
57514(B) 6294 PILES, DRIVEN (HP 12X53)471LF $15.00 $14.40 $20.60 $14.00 $10.00 $21.40 $25.00 $35.00
58514(L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00
59601(B) 1353 TYPE I-A PLAIN RIPRAP420TON $45.00 $46.88 $54.03 $45.00 $55.00 $58.51 $48.00 $60.00
60601(C) 1355 TYPE I-A FILTER BLANKET130TON $42.00 $35.33 $42.54 $40.00 $50.00 $46.98 $38.00 $45.00
61613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND52LF $30.00 $30.00 $12.14 $35.00 $40.00 $30.36 $30.00 $25.00
62613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.60LF $20.00 $30.00 $12.14 $30.00 $40.00 $35.23 $30.00 $25.00
63619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $20,000.00 $7,000.00 $2,575.00 $13,500.00 $10,000.00 $11,770.00 $25,000.00 $20,000.00
64623(F) 4446 GUARDRAIL ANCHOR UNIT (TYPE A)8EA $2,000.00 $1,980.00 $1,854.00 $1,650.00 $2,000.00 $1,926.00 $1,980.00 $2,200.00
65623(F) 5686 GUARDRAIL ANCHOR UNIT (TYPE D-BF)8EA $2,000.00 $1,567.50 $1,467.75 $2,450.00 $1,550.00 $1,524.75 $1,575.00 $1,800.00
66880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $5,000.00 $8,500.00 $6,180.00 $4,000.00 $6,000.00 $6,420.00 $6,600.00 $7,000.00
67642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $10,700.00 $12,000.00 $7,107.00 $12,500.00 $7,400.00 $7,918.00 $7,600.00 $20,000.00
68220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $5,000.00 $5,000.00 $2,575.00 $4,000.00 $500.00 $5,350.00 $6,000.00 $3,000.00
69641 1399 MOBILIZATION1LSUM $78,800.00 $60,000.00 $54,690.93 $60,000.00 $77,000.00 $75,821.91 $55,000.00 $70,000.00