| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$12,480.00 |
$10,000.00 |
$3,862.50 |
$13,000.00 |
$25,000.00 |
$17,500.00 |
$14,845.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 1,836 | CY |
$9.00 |
$8.84 |
$10.00 |
$4.12 |
$8.00 |
$10.00 |
$5.25 |
$4.30 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 4,487 | CY |
$10.00 |
$11.44 |
$10.00 |
$11.07 |
$12.00 |
$13.00 |
$11.75 |
$11.60 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 500 | LF |
$2.00 |
$2.08 |
$1.40 |
$1.33 |
$1.70 |
$4.00 |
$3.89 |
$1.40 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 250 | LF |
$8.00 |
$10.40 |
$7.00 |
$6.64 |
$7.50 |
$15.00 |
$10.45 |
$6.95 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 14,950 | SY |
$1.60 |
$1.87 |
$1.90 |
$1.70 |
$1.98 |
$2.00 |
$2.50 |
$1.80 |
| 7 | 233(A) 2817 |
VEGETATIVE MULCHING | 6.18 | AC |
$525.00 |
$104.00 |
$275.00 |
$257.50 |
$200.00 |
$100.00 |
$400.00 |
$270.00 |
| 8 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 723 | CY |
$55.00 |
$48.25 |
$57.00 |
$53.56 |
$58.90 |
$55.00 |
$79.33 |
$47.50 |
| 9 | 325 5271 |
SEPARATOR FABRIC | 4,066 | SY |
$1.50 |
$1.17 |
$2.00 |
$2.06 |
$2.50 |
$2.00 |
$2.50 |
$1.60 |
| 10 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,016 | TON |
$30.00 |
$24.13 |
$28.00 |
$31.93 |
$34.10 |
$33.00 |
$35.00 |
$23.20 |
| 11 | 408 5774 |
PRIME COAT | 2,332 | GAL |
$2.25 |
$4.16 |
$4.40 |
$4.12 |
$4.40 |
$4.00 |
$4.40 |
$8.10 |
| 12 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 680 | TON |
$90.00 |
$88.40 |
$97.00 |
$87.55 |
$97.75 |
$90.00 |
$98.95 |
$135.00 |
| 13 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 363 | TON |
$110.00 |
$104.00 |
$117.00 |
$103.00 |
$115.00 |
$107.00 |
$107.00 |
$151.00 |
| 14 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$300.00 |
$337.50 |
$350.00 |
$540.75 |
$320.00 |
$260.00 |
$300.00 |
$502.50 |
| 15 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 10 | TON |
$42.00 |
$81.21 |
$41.00 |
$61.80 |
$42.00 |
$44.00 |
$49.00 |
$64.80 |
| 16 | 613(B) 4529 |
35" X 24" CORR. GALV. STEEL PIPE ARCH | 65 | LF |
$53.00 |
$50.19 |
$44.00 |
$51.50 |
$43.00 |
$45.00 |
$46.00 |
$37.80 |
| 17 | 613(L) 4522 |
35" X 24" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$1,200.00 |
$776.32 |
$350.00 |
$463.50 |
$400.00 |
$375.00 |
$400.00 |
$432.00 |
| 18 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$15,000.00 |
$5,200.00 |
$5,000.00 |
$7,416.00 |
$5,500.00 |
$6,000.00 |
$5,000.00 |
$13,170.00 |
| 19 | 623(F) 4446 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 4 | EA |
$1,500.00 |
$1,716.00 |
$1,800.00 |
$1,699.50 |
$1,815.00 |
$1,650.00 |
$1,850.00 |
$1,582.00 |
| 20 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,750.00 |
$1,716.00 |
$1,800.00 |
$1,699.50 |
$1,815.00 |
$1,650.00 |
$1,850.00 |
$1,889.00 |
| 21 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 2,840 | LF |
$6.00 |
$8.16 |
$5.50 |
$8.08 |
$6.00 |
$7.85 |
$5.75 |
$5.40 |
| 22 | 624(H) 5920 |
(PL) GATE | 3 | EA |
$1,500.00 |
$1,040.00 |
$880.00 |
$1,030.00 |
$900.00 |
$1,000.00 |
$1,200.00 |
$863.50 |
| 23 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 80 | CY |
$25.00 |
$22.88 |
$10.00 |
$30.90 |
$17.50 |
$16.00 |
$20.00 |
$29.60 |
| 24 | 501(G) 6309 |
CLSM BACKFILL | 68 | CY |
$200.00 |
$157.11 |
$150.00 |
$176.23 |
$173.00 |
$155.00 |
$205.54 |
$217.00 |
| 25 | 503(A) 1311 |
PRESTRESSED CONCRETE BEAMS (TYPE II) | 358 | LF |
$205.00 |
$217.41 |
$205.00 |
$228.02 |
$231.00 |
$240.00 |
$223.46 |
$252.50 |
| 26 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 254 | LF |
$222.00 |
$226.49 |
$220.00 |
$240.95 |
$245.00 |
$250.00 |
$225.10 |
$241.50 |
| 27 | 504(A) 1304 |
APPROACH SLAB | 115 | SY |
$180.00 |
$240.57 |
$185.00 |
$237.73 |
$252.50 |
$240.00 |
$310.00 |
$304.00 |
| 28 | 504(B) 1305 |
SAW-CUT GROOVING | 584.8 | SY |
$6.00 |
$4.89 |
$5.00 |
$6.28 |
$5.17 |
$4.70 |
$5.70 |
$5.05 |
| 29 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 465.4 | LF |
$76.50 |
$86.46 |
$80.00 |
$78.00 |
$81.50 |
$80.00 |
$82.00 |
$102.00 |
| 30 | 506(A) 1322 |
STRUCTURAL STEEL | 670 | LB |
$4.00 |
$2.13 |
$3.00 |
$3.17 |
$3.00 |
$3.00 |
$4.00 |
$6.10 |
| 31 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 6 | EA |
$1,200.00 |
$722.43 |
$700.00 |
$814.32 |
$770.00 |
$550.00 |
$650.00 |
$1,045.00 |
| 32 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 12 | EA |
$1,400.00 |
$750.61 |
$700.00 |
$814.32 |
$770.00 |
$850.00 |
$650.00 |
$1,451.00 |
| 33 | 507(C) 6282 |
ELASTOMERIC BEARING PADS | 12 | EA |
$450.00 |
$301.79 |
$350.00 |
$348.86 |
$320.00 |
$400.00 |
$295.00 |
$522.00 |
| 34 | 509(A) 1326 |
CLASS AA CONCRETE | 171.9 | CY |
$550.00 |
$747.50 |
$550.00 |
$611.74 |
$687.50 |
$650.00 |
$675.00 |
$726.50 |
| 35 | 509(B) 1328 |
CLASS A CONCRETE | 101 | CY |
$600.00 |
$710.26 |
$550.00 |
$611.74 |
$685.00 |
$650.00 |
$700.00 |
$884.50 |
| 36 | 511(A) 1332 |
REINFORCING STEEL | 62,100 | LB |
$1.00 |
$1.00 |
$0.9000 |
$1.21 |
$1.01 |
$1.05 |
$1.10 |
$1.70 |
| 37 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 715 | LF |
$32.00 |
$30.17 |
$25.00 |
$26.15 |
$28.00 |
$45.00 |
$26.32 |
$31.40 |
| 38 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 715 | LF |
$16.00 |
$14.56 |
$20.00 |
$14.42 |
$12.00 |
$10.00 |
$14.00 |
$18.10 |
| 39 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 40 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 240 | LF |
$1,000.00 |
$707.18 |
$850.00 |
$750.88 |
$700.00 |
$650.00 |
$841.60 |
$879.50 |
| 41 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$2,635.00 |
$4,368.00 |
$3,650.00 |
$2,729.50 |
$3,000.00 |
$2,400.00 |
$2,850.00 |
$6,190.00 |
| 42 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 5,100 | TON |
$42.00 |
$35.45 |
$41.00 |
$42.08 |
$42.00 |
$43.00 |
$46.50 |
$44.30 |
| 43 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 1,360 | TON |
$35.00 |
$23.35 |
$31.00 |
$30.79 |
$31.00 |
$33.00 |
$40.00 |
$32.20 |
| 44 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 52 | LF |
$30.00 |
$19.06 |
$35.00 |
$28.62 |
$35.00 |
$35.00 |
$35.00 |
$90.50 |
| 45 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 35 | LF |
$26.00 |
$23.86 |
$35.00 |
$28.62 |
$45.00 |
$35.00 |
$30.00 |
$35.50 |
| 46 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$30,000.00 |
$11,440.00 |
$30,000.00 |
$18,540.00 |
$18,750.00 |
$15,000.00 |
$25,000.00 |
$19,435.00 |
| 47 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 2,185 | LF |
$1.00 |
$1.98 |
$2.10 |
$1.95 |
$2.09 |
$1.90 |
$2.07 |
$2.05 |
| 48 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$7,000.00 |
$2,745.00 |
$2,900.00 |
$2,719.20 |
$4,000.00 |
$2,640.00 |
$4,000.00 |
$2,375.00 |
| 49 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$8,085.00 |
$6,250.00 |
$5,871.00 |
$8,000.00 |
$6,500.00 |
$7,500.00 |
$11,875.00 |
| 50 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$4,000.00 |
$3,465.00 |
$4,000.00 |
$2,575.00 |
$3,000.00 |
$1,275.00 |
$3,500.00 |
$2,914.00 |
| 51 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$95,120.00 |
$72,050.72 |
$65,000.00 |
$58,276.94 |
$90,000.00 |
$97,000.00 |
$87,500.00 |
$115,555.01 |