| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$2,094.64 |
$7,000.00 |
$5,250.00 |
$6,400.00 |
$2,500.00 |
$10,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 193 | CY |
$7.00 |
$6.35 |
$55.00 |
$15.00 |
$9.00 |
$12.00 |
$12.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,437 | CY |
$9.00 |
$8.89 |
$11.25 |
$11.75 |
$10.50 |
$8.25 |
$12.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$6,500.00 |
$2,888.06 |
$7,000.00 |
$2,185.00 |
$5,050.00 |
$4,000.00 |
$3,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 170 | LF |
$2.50 |
$31.74 |
$3.00 |
$1.50 |
$3.50 |
$3.00 |
$27.00 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 88 | LF |
$9.50 |
$49.51 |
$10.00 |
$15.00 |
$10.00 |
$8.00 |
$42.00 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 755 | SY |
$5.50 |
$8.87 |
$7.75 |
$6.99 |
$7.70 |
$6.99 |
$7.50 |
| 8 | 232(B) 2814 |
SEEDING METHOD B | 1 | AC |
$3,000.00 |
$11,134.30 |
$1,250.00 |
$9,900.00 |
$10,890.00 |
$9,900.00 |
$9,900.00 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 0.5 | AC |
$3,000.00 |
$16,757.68 |
$1,250.00 |
$14,900.00 |
$16,500.00 |
$14,900.00 |
$14,900.00 |
| 10 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 368 | TON |
$35.00 |
$33.83 |
$26.25 |
$31.00 |
$33.00 |
$26.00 |
$35.00 |
| 11 | 509(D) 0325 |
CLASS C CONCRETE | 20 | CY |
$315.00 |
$152.34 |
$275.00 |
$150.00 |
$272.50 |
$250.00 |
$300.00 |
| 12 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 58 | LF |
$36.00 |
$42.29 |
$31.25 |
$35.00 |
$25.00 |
$36.00 |
$50.00 |
| 13 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 2 | EA |
$1,200.00 |
$634.74 |
$1,750.00 |
$1,000.00 |
$1,200.00 |
$1,200.00 |
$1,400.00 |
| 14 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$2,000.00 |
$1,523.37 |
$2,275.00 |
$1,950.00 |
$3,000.00 |
$3,000.00 |
$3,500.00 |
| 15 | 623(F) 4446 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 4 | EA |
$1,560.00 |
$1,586.85 |
$1,375.00 |
$1,700.00 |
$1,870.00 |
$1,700.00 |
$1,700.00 |
| 16 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,650.00 |
$2,983.27 |
$2,633.00 |
$1,425.00 |
$1,567.50 |
$1,425.00 |
$1,425.00 |
| 17 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 805 | LF |
$6.50 |
$10.60 |
$11.25 |
$8.33 |
$11.00 |
$8.35 |
$8.35 |
| 18 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 1 | EA |
$250.00 |
$126.95 |
$150.00 |
$50.00 |
$150.00 |
$250.00 |
$100.00 |
| 19 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 100 | CY |
$20.00 |
$6.35 |
$25.00 |
$100.00 |
$10.00 |
$14.00 |
$15.00 |
| 20 | 501(F) 6352 |
GRANULAR BACKFILL | 56 | CY |
$60.00 |
$28.56 |
$75.00 |
$100.00 |
$64.50 |
$65.00 |
$75.00 |
| 21 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 254 | LF |
$220.00 |
$227.63 |
$225.00 |
$200.00 |
$232.00 |
$337.50 |
$260.00 |
| 22 | 504(B) 1305 |
SAW-CUT GROOVING | 209 | SY |
$9.00 |
$18.15 |
$17.50 |
$14.30 |
$15.40 |
$14.30 |
$14.30 |
| 23 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 226.6 | LF |
$80.00 |
$78.07 |
$72.50 |
$15.00 |
$79.00 |
$100.00 |
$85.00 |
| 24 | 506(A) 1322 |
STRUCTURAL STEEL | 320 | LB |
$4.00 |
$5.24 |
$3.00 |
$1.00 |
$2.60 |
$5.00 |
$4.00 |
| 25 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 6 | EA |
$1,150.00 |
$224.35 |
$775.00 |
$1,000.00 |
$400.00 |
$300.00 |
$450.00 |
| 26 | 509(A) 1326 |
CLASS AA CONCRETE | 85.5 | CY |
$650.00 |
$380.84 |
$725.00 |
$375.00 |
$650.00 |
$800.00 |
$675.00 |
| 27 | 509(B) 1328 |
CLASS A CONCRETE | 39.2 | CY |
$600.00 |
$380.84 |
$725.00 |
$600.00 |
$692.50 |
$800.00 |
$700.00 |
| 28 | 511(A) 1332 |
REINFORCING STEEL | 21,470 | LB |
$1.00 |
$1.02 |
$1.00 |
$1.00 |
$0.9900 |
$0.9000 |
$1.00 |
| 29 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 210 | LF |
$35.00 |
$34.72 |
$33.33 |
$27.30 |
$44.80 |
$15.00 |
$40.00 |
| 30 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 210 | LF |
$14.00 |
$27.93 |
$10.00 |
$3.00 |
$19.20 |
$7.50 |
$10.00 |
| 31 | 514(K) 6260 |
(PL)PILOT HOLES | 186 | LF |
$182.00 |
$236.12 |
$175.00 |
$600.00 |
$450.00 |
$475.00 |
$545.00 |
| 32 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 33 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 390 | TON |
$42.00 |
$32.05 |
$42.25 |
$29.00 |
$38.00 |
$33.50 |
$50.00 |
| 34 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 115 | TON |
$35.00 |
$21.71 |
$32.56 |
$24.00 |
$32.50 |
$28.00 |
$40.00 |
| 35 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 52 | LF |
$25.00 |
$9.52 |
$25.00 |
$75.00 |
$30.00 |
$40.00 |
$30.00 |
| 36 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 64 | LF |
$23.00 |
$9.52 |
$25.00 |
$65.00 |
$30.00 |
$40.00 |
$30.00 |
| 37 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$8,000.00 |
$6,347.38 |
$17,500.00 |
$8,000.00 |
$9,250.00 |
$7,500.00 |
$10,000.00 |
| 38 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$4,000.00 |
$2,856.32 |
$3,250.00 |
$2,750.00 |
$3,350.00 |
$2,750.00 |
$2,750.00 |
| 39 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$8,500.00 |
$9,394.13 |
$7,250.00 |
$5,200.00 |
$5,200.00 |
$5,200.00 |
$7,200.00 |
| 40 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$1,904.21 |
$3,634.00 |
$1,000.00 |
$2,500.00 |
$3,000.00 |
$1,275.00 |
| 41 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$45,000.00 |
$44,431.68 |
$27,500.00 |
$32,000.00 |
$45,000.00 |
$50,000.00 |
$52,000.00 |